Energia e ÁguaPrograma de 5 dias

Distribution Substation Construction and Grid Densification Management in Dakar

Dates10–14 May 2027
LocationDakar, Senegal
LocalComunicado na inscrição
Register by10 Apr 2027

Factos essenciais

Datas
10–14 May 2027 (5 days)
Local
Dakar, Senegal
Preço por participante
£2.750 (GBP)
Pagamento
Por fatura e transferência bancária
Encerramento das inscrições
10 Apr 2027
A quem se destina
Power utility distribution project engineers; Substation construction supervisors; Medium-voltage and low-voltage electrical works managers
Certificado
Certificado de conclusão
Nesta página 12 secções

Visão geral do programa

This five-day professional programme addresses the critical operational demands of medium-voltage and low-voltage distribution grid expansion. Power utilities across West Africa are executing aggressive network densification initiatives to bridge electricity access gaps in urban and peri-urban settlements. Participants explore the core technical disciplines of distribution substation construction, line route surveying, civil works validation, and transformer station assembly. Structured around international standards such as IEC 61936-1 and IEC 62271, the course establishes rigorous methodologies for electrical network engineering, site execution, and structural verification.

Engineers and supervisors examine systematic approaches to managing distribution infrastructure projects financed by multilateral development institutions. Focus is placed on overcoming operational constraints typical of dense, informal settlements, including rights of way, soil mechanics, and overhead-to-underground transition interfaces. The curriculum covers switchgear erection, transformer testing, secondary cabling, earthing network design, and protective relay configuration. Delegates master technical supervisory techniques necessary to verify contractor installations, uphold construction tolerances, and prevent operational bottlenecks prior to final network energisation and grid integration.

Beyond foundational installation techniques, the training embeds comprehensive quality assurance, environmental health and safety, and asset handover frameworks. Attendees learn to administer factory and site acceptance testing protocols, verify non-destructive testing of structural elements, and ensure compliance with World Bank Environmental and Social Framework guidelines. Through technical case exercises based on regional power systems, participants develop actionable capabilities to manage engineering contractors, minimise distribution losses, eliminate commissioning hazards, and deliver robust distribution assets that safeguard grid reliability over their intended lifecycles.

Rapid urbanization across West Africa, particularly in Guinea, demands accelerated infrastructure delivery to achieve ambitious electrification targets. Significant public investments and donor-funded initiatives, such as the Guinea Electricity Access Scale Up Project, require power sector professionals to implement large-scale medium- and low-voltage grid extensions, network densification, and substation rehabilitation works. Delivering these physical network targets requires stringent construction supervision, standardised testing regimes, and strict adherence to international engineering and safety standards, ensuring that newly built distribution assets operate reliably without premature failure.

Delivered by Risalat Consultants International in Dakar, Senegal, it combines expert-led sessions, real cases and group work, so that participants can apply what they learn in their own institution.

The Programme Strengthens Institutional Capability

  • Network densification typologies in urban and peri-urban environments
  • Medium-voltage and low-voltage line routing, corridor rights, and wayleave clearance
  • Soil mechanics, foundation design, and civil works validation for pad-mounted substations
  • Civil structures for pole-mounted transformers and compact secondary substations
  • Health and safety risk assessment under World Bank Group Environmental, Health, and Safety Guidelines
  • Installation practices for 11kV, 20kV, and 33kV distribution transformers
  • Medium-voltage switchgear assembly, alignment, and internal arc classification (IAC) checks
  • Low-voltage distribution board integration, feeder pillar positioning, and busbar torque verification
  • Planeamento e priorização de infraestruturas
  • Apreciação de projetos e business cases
  • Opções de financiamento e parcerias público-privadas
  • Contratação e celebração de contratos de empreitada

It is designed for power utility distribution project engineers, substation construction supervisors, medium-voltage and low-voltage electrical works managers and others who want practical, current skills in infrastructure, urban development and partnerships.


The Growing Importance of Distribution Substation Construction and Grid Densification Management in Dakar

As infraestruturas e os serviços urbanos moldam o crescimento, a saúde e as oportunidades. Os projetos são grandes, complexos e de longa duração, e as fragilidades no planeamento, no financiamento ou na execução são dispendiosas de corrigir mais tarde.

Os governos combinam cada vez mais o investimento público, as parcerias com o setor privado e as novas tecnologias. As equipas capazes de planear, apreciar, contratar e gerir estes investimentos produzem melhores ativos e serviços.

As organizações precisam cada vez mais de profissionais capazes de:

  • Planear e priorizar os investimentos em infraestruturas
  • Apreciar projetos e preparar business cases
  • Escolher modelos de financiamento e de execução
  • Fiscalizar as obras quanto a prazos, custos e qualidade
  • Gerir os ativos ao longo do seu ciclo de vida

Sistemas sólidos de infraestruturas, desenvolvimento urbano e parcerias ajudam as organizações a:

  • Selecionar os investimentos certos
  • Concluir projetos dentro do prazo e do orçamento
  • Atrair financiamento e parceiros
  • Manter os ativos em funcionamento durante mais tempo

This Distribution Substation Construction and Grid Densification Management in Dakar programme brings these elements together in a practical format, so that participants understand not only what good practice looks like but also how to introduce it in their own setting, with the people and resources they have.


Who Should Attend This Distribution Substation Construction and Grid Densification Management in Dakar Training?

Este programa destina-se a:

  • Power utility distribution project engineers
  • Substation construction supervisors
  • Medium-voltage and low-voltage electrical works managers
  • Project implementation unit (PIU) technical specialists
  • Distribution network planning and rehabilitation engineers
  • Site inspection and quality assurance engineers
  • Donor-financed electrification project coordinators
  • Consulting electrical engineers and technical supervisors
  • Public works contract administrators handling power tenders
  • Planeadores de infraestruturas e urbanistas
  • Engenheiros e gestores técnicos
  • Gestores de projetos e programas

O programa adequa-se tanto a profissionais experientes como a quem está a assumir novas responsabilidades. Incentivamos grupos que juntem instituições e países diferentes, pois os participantes aprendem muito com a experiência uns dos outros.

A sua equipa precisa disto?

Assinale o que a sua equipa precisa de ser capaz de fazer.

Assinale os itens aplicáveis

Distribution Substation Construction and Grid Densification Management in Dakar Training Objectives

Upon successful completion of this Distribution Substation Construction and Grid Densification Management in Dakar Training, participants will be able to:

  • Appraise medium-to-low voltage distribution substation designs according to IEC and local utility standards
  • Supervise civil, structural, and electrical contractor works across urban and peri-urban grid densification sites
  • Evaluate transformer installation, switchgear alignment, and busbar connections for operational safety and compliance
  • Execute site acceptance testing and pre-commissioning verification procedures for distribution substations and lines
  • Apply earthing grid calculations and soil resistivity testing methods to safeguard distribution infrastructure
  • Implement international environmental, health, and safety protocols on active electrical construction sites
  • Manage contractor performance, technical variation requests, and handover processes for capital distribution projects
  • Explicar como se planeiam e priorizam as infraestruturas
  • Apreciar projetos e preparar um business case
  • Comparar modelos de financiamento e de execução, incluindo parcerias

Cada objetivo é praticado durante o programa através de exercícios, casos ou trabalho de grupo, para que os participantes saiam capazes de o pôr em prática, e não apenas de o descrever.


Conteúdo e estrutura do programa

O seu percurso de 5 dias toque num dia para ver as sessões
    • Network densification typologies in urban and peri-urban environments
    • Medium-voltage and low-voltage line routing, corridor rights, and wayleave clearance
    • Soil mechanics, foundation design, and civil works validation for pad-mounted substations
    • Civil structures for pole-mounted transformers and compact secondary substations
    • Health and safety risk assessment under World Bank Group Environmental, Health, and Safety Guidelines
Conteúdo completo, dia a dia

O programa decorre ao longo de 5 dias. Cada dia combina contributos de especialistas, trabalho prático e um workshop ou estudo de caso final:

  • First Day: Distribution Grid Densification Planning and Site Preparation
  • Second Day: Substation Equipment Erection and Primary Plant Installation
  • Third Day: Earthing Systems, Cabling, and Network Connections
  • Fourth Day: Inspection, Quality Assurance, and Contractor Supervision
  • Fifth Day: Site Acceptance Testing, Pre-Commissioning, and Asset Handover

Conteúdo completo, dia a dia

First Day | Distribution Grid Densification Planning and Site Preparation

  • Network densification typologies in urban and peri-urban environments
  • Medium-voltage and low-voltage line routing, corridor rights, and wayleave clearance
  • Soil mechanics, foundation design, and civil works validation for pad-mounted substations
  • Civil structures for pole-mounted transformers and compact secondary substations
  • Health and safety risk assessment under World Bank Group Environmental, Health, and Safety Guidelines

Workshop: Distribution Grid Densification Planning and Site Preparation: Applying It to Your Institution

Em pequenos grupos, os participantes aplicam os métodos do dia a exemplos das suas próprias instituições e acordam os próximos passos práticos.

Second Day | Substation Equipment Erection and Primary Plant Installation

  • Installation practices for 11kV, 20kV, and 33kV distribution transformers
  • Medium-voltage switchgear assembly, alignment, and internal arc classification (IAC) checks
  • Low-voltage distribution board integration, feeder pillar positioning, and busbar torque verification
  • Secondary wiring, auxiliary power systems, and battery bank installation standards
  • Safe handling, rigging, and mechanical placement of primary electrical equipment

Workshop: Substation Equipment Erection and Primary Plant Installation: Applying It to Your Institution

Em pequenos grupos, os participantes aplicam os métodos do dia a exemplos das suas próprias instituições e acordam os próximos passos práticos.

Third Day | Earthing Systems, Cabling, and Network Connections

  • Substation earthing network design, electrode placement, and IEC 61936-1 standards
  • Soil resistivity measurements and step-and-touch potential safety verification
  • Underground cable trenching, laying depth, ducting, and backfilling standards
  • Medium-voltage cable jointing, termination techniques, and cold-shrink application controls
  • Overhead-to-underground transition interfaces, surge arrester installation, and drop-out fuse mounting

Case Study: Earthing Systems, Cabling, and Network Connections in Practice

Os participantes analisam um caso realista, comparam as escolhas feitas com as boas práticas e retiram lições que podem aplicar no seu próprio contexto.

Fourth Day | Inspection, Quality Assurance, and Contractor Supervision

  • Engineering procurement and construction (EPC) contract supervision and quality control plans
  • Managing site instructions, non-conformance reports (NCRs), and variation requests
  • Verification of equipment test certificates and factory acceptance testing (FAT) results
  • Supervision of pole dressing, conductor stringing, and sag-tension verification
  • Environmental mitigation and waste management for dielectric oils and hazardous construction materials

Workshop: Inspection, Quality Assurance, and Contractor Supervision: Applying It to Your Institution

Em pequenos grupos, os participantes aplicam os métodos do dia a exemplos das suas próprias instituições e acordam os próximos passos práticos.

Fifth Day | Site Acceptance Testing, Pre-Commissioning, and Asset Handover

  • Insulation resistance, winding resistance, and transformer voltage ratio testing
  • Protection relay configuration checks, primary injection, and trip test validation
  • Site Acceptance Testing (SAT) sign-off protocols and pre-energisation checklists
  • Energisation sequencing, phasing checks, and no-load switching operations
  • Defects liability monitoring, as-built documentation review, and formal utility asset handover

Capstone Exercise: Distribution Substation Construction and Grid Densification Management in Dakar Action Plan for Your Institution

Os participantes sintetizam a semana num plano de ação para a sua instituição, com prioridades, responsáveis e primeiros passos, e apresentam-no para receber comentários dos colegas e dos formadores.

  1. Transação
  2. Registo
  3. Controlo
  4. Evidência
  5. Parecer
A pista de auditoriaUm auditor só pode confiar num valor se todas as ligações até à transação original se mantiverem.

Distribution Substation Construction and Grid Densification Management in Dakar Training Methodology

The training employs a performance-focused adult learning framework tailored to capital project execution. Participants work through realistic engineering scenarios, examining detailed design drawings, construction checklists, and manufacturer test certificates. Practical workshops involve calculating earthing grids, reviewing non-conformance scenarios from regional electrification projects, and developing Site Acceptance Testing (SAT) sequences. Facilitated peer discussions enable utility engineers to compare institutional practices and address common supervision bottlenecks in line with multilateral development bank standards.

O programa combina:

  • Sessões conduzidas por especialistas sobre as práticas atuais
  • Estudos de caso regionais e internacionais
  • Trabalho de grupo e exercícios práticos
  • Simulações e dramatizações, quando relevante
  • Discussão dos desafios dos próprios participantes
  • Aprendizagem entre pares de várias instituições e países
  • Ferramentas e modelos práticos para levar para o trabalho
  • Reflexão diária e planeamento de ações

Antes do programa, uma breve avaliação prévia ajuda os formadores a compreender a função e as prioridades de cada participante, para que os exemplos e exercícios possam ser ajustados ao grupo. Cada dia termina com uma breve reflexão em que os participantes registam o que vão aplicar no trabalho.


Resultados esperados

Upon completion of this Distribution Substation Construction and Grid Densification Management in Dakar Training, participants will be able to:

  • Manage distribution substation civil and electrical construction works in compliance with IEC standards
  • Direct site supervision of electrical contractors to eliminate workmanship defects and project delays
  • Perform and witness standard Site Acceptance Testing on distribution transformers and switchgear
  • Calculate and verify earthing systems to ensure personnel safety and network resilience
  • Administer strict environmental, health, and safety compliance across urban worksites
  • Execute systematic pre-commissioning procedures and asset handover documentation for public utilities
  • Planear e priorizar os investimentos em infraestruturas
  • Apreciar projetos e preparar business cases

Os participantes saem com um plano de ação pessoal e ferramentas práticas que podem utilizar na sua instituição logo na primeira semana após o regresso. As instituições que enviam vários participantes podem aproveitar o programa para acordar métodos e modelos comuns entre equipas, o que torna as melhorias mais fáceis de manter.

Planeie as vagas da sua equipa

£2.750 por participante · fatura e transferência bancária · desconto para grupos de 5 ou mais pessoas

1participante(s)
£2.750ao preço normal

Registration closes in 148 days (10 Apr 2027)


Institutional Application of Distribution Substation Construction and Grid Densification Management in Dakar Training

Este programa ajuda as organizações a reforçar:

  • Planeamento do investimento
  • Apreciação de projetos
  • Gestão de parcerias
  • Fiscalização de obras
  • Gestão de ativos

Os participantes regressam com ferramentas práticas para melhorar:

  • Business cases
  • Repartição de riscos
  • Gestão de contratos
  • Planeamento da manutenção
  • Monitorização dos serviços

O programa foi construído para que a aprendizagem passe da sala de formação para a instituição. Sempre que possível, os participantes trabalham sobre os seus próprios processos e documentos e saem com um plano de ação que as chefias podem analisar e apoiar.


Relevância regional e aplicação

Europa

As instituições europeias tratam as infraestruturas, o desenvolvimento urbano e as parcerias no âmbito de quadros regulamentares detalhados e de agendas de reforma. Os participantes da Europa podem comparar a sua prática com a de colegas de outras regiões e testar o funcionamento de métodos consolidados em condições diferentes.

África

Em toda a África, os ministérios, agências e equipas de projeto que trabalham em infraestruturas, desenvolvimento urbano e parcerias atuam cada vez mais em paralelo com programas financiados por doadores que exigem sistemas claros e evidências. O programa ajuda os participantes a adaptar as boas práticas às instituições e aos recursos com que trabalham.

Médio Oriente

No Médio Oriente, as estratégias nacionais de desenvolvimento e os planos de diversificação colocam exigências crescentes em matéria de infraestruturas, desenvolvimento urbano e parcerias. Os participantes analisam a forma de criar, nos organismos públicos e nas empresas, as capacidades de que estes planos necessitam.

Ásia

As instituições da Ásia aliam um crescimento rápido a programas de modernização ambiciosos. Os participantes asiáticos podem partilhar a sua experiência de expansão rápida de sistemas e aprender com abordagens utilizadas noutros contextos.

Pacífico

Os pequenos Estados insulares e do Pacífico enfrentam condicionantes específicas de dimensão, distância e capacidade. O programa destaca abordagens práticas e proporcionadas às infraestruturas, ao desenvolvimento urbano e às parcerias, adequadas a instituições de menor dimensão.

Holding the programme in Dakar, Senegal brings participants together away from their daily pressures, so they can compare how infrastructure, urban development and partnerships is handled in different settings. The same programme can also be delivered in-house for one institution, in its own country or online, with cases taken from its current work.


Host Country Profile – Senegal

Training programmes and study tours in Dakar suit professionals, project teams, and civil servants seeking exposure to West African governance, regional trade, and infrastructure development.

Estudar fora do seu país dá aos participantes tempo para se concentrarem, um olhar novo sobre a sua própria instituição e a oportunidade de criar uma rede com colegas de outros países.


Distribution Substation Construction and Grid Densification Management in Dakar Training Deliverables

Os participantes recebem apoio antes, durante e depois do programa, para que a preparação, a aprendizagem e o acompanhamento formem uma experiência contínua.

Antes do programa

  • Avaliação prévia dos participantes
  • Distribution Substation Construction and Grid Densification Management in Dakar Readiness Assessment
  • Distribution Substation Construction and Grid Densification Management in Dakar Resource Pack
  • Materiais de leitura preparatória
  • Apoio e aconselhamento gratuitos em matéria de vistos

Durante o programa

  • Recolha no aeroporto e apoio de boas-vindas
  • Alojamento com pequeno-almoço
  • Jantar de boas-vindas e networking
  • Kit de formação Risalat (saco, garrafa, caneca, t-shirt, boné, capa de passaporte, canetas, bloco de notas, íman e porta-chaves)
  • Comprehensive Distribution Substation Construction and Grid Densification Management in Dakar Training Manual
  • Modelo de Apreciação de Projetos
  • Matriz de Repartição de Riscos em PPP
  • Lista de Verificação da Fiscalização de Obras
  • Modelo de Plano de Gestão de Ativos
  • Workshops práticos e simulações
  • Discussões de grupo e aprendizagem entre pares
  • Almoço e pausas para café diários
  • Acesso total às instalações do local de formação
  • Mini tablet com materiais de aprendizagem digitais
  • Visita de campo (quando aplicável)
  • Passeio recreativo pela cidade

Depois do programa

  • Certificado de Conclusão
  • Prémio Risalat de Reconhecimento da Participação no Programa
  • Materiais de referência pós-formação
  • Lista de Verificação para a Revisão do Business Case
  • Modelo de Plano de Manutenção
  • Apoio pós-formação e orientação de acompanhamento
  • Relatório do programa

As instituições podem também solicitar uma versão interna e adaptada deste programa, realizada nas suas instalações ou online. Pedir uma proposta.


Common Challenges in Distribution Substation Construction and Grid Densification Management in Dakar, And How This Training Helps

Como podem as instituições planear e priorizar os investimentos em infraestruturas?

The programme addresses this directly on the first day (Distribution Grid Densification Planning and Site Preparation), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.

Como podem as instituições apreciar projetos e preparar business cases?

The programme addresses this directly on the second day (Substation Equipment Erection and Primary Plant Installation), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.

Como podem as instituições escolher modelos de financiamento e de execução?

The programme addresses this directly on the third day (Earthing Systems, Cabling, and Network Connections), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.

Como podem as instituições fiscalizar as obras em termos de prazo, custo e qualidade?

The programme addresses this directly on the fourth day (Inspection, Quality Assurance, and Contractor Supervision), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.

Como podem as instituições gerir os ativos ao longo da sua vida útil?

The programme addresses this directly on the fifth day (Site Acceptance Testing, Pre-Commissioning, and Asset Handover), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.


Perguntas frequentes

When and where does the Distribution Substation Construction and Grid Densification Management in Dakar programme take place?

It runs from 10 May 2027 to 14 May 2027, in Dakar, Senegal. The registration deadline is shown at the top of this page.

Quem deve participar?

The programme is designed for power utility distribution project engineers, substation construction supervisors, medium-voltage and low-voltage electrical works managers, project implementation unit (PIU) technical specialists, and others who want practical skills in infrastructure, urban development and partnerships.

Vou receber um certificado?

Sim. Os participantes que concluírem o programa recebem um Certificado de Conclusão da Risalat Consultants International.

Este programa pode ser realizado apenas para a nossa instituição?

Sim. Podemos realizar uma versão interna adaptada nas suas instalações, noutra cidade ou online, construída em torno dos seus próprios casos. Utilize o pedido de proposta nesta página.

Preciso de experiência prévia em infraestruturas, desenvolvimento urbano e parcerias?

Não é necessária formação especializada além de experiência numa função relacionada. Uma breve avaliação prévia ajuda os formadores a adaptar as sessões ao grupo.

Who Will Deliver This Programme

Each date is delivered by a team assigned from Risalat's expert network for this subject. For this programme we assign:

Lead facilitatorA senior energy and water specialist with at least 10 years of practice on public-sector and donor-financed projects, who has done the work this programme teaches (Distribution Substation Construction and Grid Densification Management) and trained teams in it.
Practitioner co-facilitatorA current or recent practitioner from a project implementation unit, agency or consulting team, who brings live cases, documents and the mistakes to avoid.
Guest speakersWhere the programme allows, specialists from host-country institutions or financed projects who explain how the system works in practice.
Programme coordinatorA Risalat coordinator who handles the pre-assessment, logistics, visas and the follow-up after the programme.

How we choose them: Experience in the region of the participants or comparable settings; Command of the financier rules that apply (World Bank, ADB, AfDB, EU, UN) where relevant; Delivery in English; other languages on request for in-house groups; No conflict of interest with participants' institutions.

Names and short CVs of the assigned experts are shared with registered participants and sponsoring organisations before the programme, on request. Are you an expert in this subject? Join our expert network.

Training courses in DakarEnergy and Water training courses

Why Dakar for this programme

Dakar serves as a major diplomatic and administrative hub in West Africa, hosting regional bodies such as the Central Bank of West African States (BCEAO) and various United Nations agencies. Participants can observe major infrastructure projects, including the Port of Dakar and the Regional Express Train (TER). The city is accessible via direct international flights from across Africa, Europe, and North America.

The Distribution Substation Construction and Grid Densification Management in Dakar programme in May 2027 brings together officials and professionals from across the Africa region and beyond. Sessions combine short inputs, case studies and group work on participants' own files, and the city's institutions can be added as a study visit on request.

Getting there: Blaise Diagne International (DSS).

Verifique se precisa de visto com o Verificador de Vistos gratuito e peça uma carta-convite depois de se inscrever.

Other programmes in Dakar

For teams and institutions

Bring your team

Teams that learn together apply more at work. Tell us how many people and how you would like to take part: we reply with a group quote within two working days.

How

No commitment. Invoices to your institution; payment from project or training budgets.

Other dates and cities for this subject: Energy, Power and Utility Management training courses (118 upcoming dates).

More training courses in Senegal · Todos os programas em África · Calendário de formação completo

Plan this programme in a roadmap: why it matters, why to approve it, the dates to plan and the career it builds.

Preço por participante£2.750Inscrever-se →