Datos clave
- Fechas
- 10–14 May 2027 (5 days)
- Dónde
- Dakar, Senegal
- Tarifa por participante
- 2.750 £ (GBP)
- Pago
- Mediante factura y transferencia bancaria
- Cierre de inscripciones
- 10 Apr 2027
- A quién va dirigido
- Power utility distribution project engineers; Substation construction supervisors; Medium-voltage and low-voltage electrical works managers
- Certificado
- Certificado de finalización
- Opción interna
- Impártalo para su equipo, en sus fechas
En esta página 12 secciones
Descripción del programa
This five-day professional programme addresses the critical operational demands of medium-voltage and low-voltage distribution grid expansion. Power utilities across West Africa are executing aggressive network densification initiatives to bridge electricity access gaps in urban and peri-urban settlements. Participants explore the core technical disciplines of distribution substation construction, line route surveying, civil works validation, and transformer station assembly. Structured around international standards such as IEC 61936-1 and IEC 62271, the course establishes rigorous methodologies for electrical network engineering, site execution, and structural verification.
Engineers and supervisors examine systematic approaches to managing distribution infrastructure projects financed by multilateral development institutions. Focus is placed on overcoming operational constraints typical of dense, informal settlements, including rights of way, soil mechanics, and overhead-to-underground transition interfaces. The curriculum covers switchgear erection, transformer testing, secondary cabling, earthing network design, and protective relay configuration. Delegates master technical supervisory techniques necessary to verify contractor installations, uphold construction tolerances, and prevent operational bottlenecks prior to final network energisation and grid integration.
Beyond foundational installation techniques, the training embeds comprehensive quality assurance, environmental health and safety, and asset handover frameworks. Attendees learn to administer factory and site acceptance testing protocols, verify non-destructive testing of structural elements, and ensure compliance with World Bank Environmental and Social Framework guidelines. Through technical case exercises based on regional power systems, participants develop actionable capabilities to manage engineering contractors, minimise distribution losses, eliminate commissioning hazards, and deliver robust distribution assets that safeguard grid reliability over their intended lifecycles.
Rapid urbanization across West Africa, particularly in Guinea, demands accelerated infrastructure delivery to achieve ambitious electrification targets. Significant public investments and donor-funded initiatives, such as the Guinea Electricity Access Scale Up Project, require power sector professionals to implement large-scale medium- and low-voltage grid extensions, network densification, and substation rehabilitation works. Delivering these physical network targets requires stringent construction supervision, standardised testing regimes, and strict adherence to international engineering and safety standards, ensuring that newly built distribution assets operate reliably without premature failure.
Delivered by Risalat Consultants International in Dakar, Senegal, it combines expert-led sessions, real cases and group work, so that participants can apply what they learn in their own institution.
The Programme Strengthens Institutional Capability
- Network densification typologies in urban and peri-urban environments
- Medium-voltage and low-voltage line routing, corridor rights, and wayleave clearance
- Soil mechanics, foundation design, and civil works validation for pad-mounted substations
- Civil structures for pole-mounted transformers and compact secondary substations
- Health and safety risk assessment under World Bank Group Environmental, Health, and Safety Guidelines
- Installation practices for 11kV, 20kV, and 33kV distribution transformers
- Medium-voltage switchgear assembly, alignment, and internal arc classification (IAC) checks
- Low-voltage distribution board integration, feeder pillar positioning, and busbar torque verification
- Planificación y priorización de infraestructuras
- Evaluación de proyectos y casos de negocio
- Opciones de financiación y asociaciones público-privadas
- Contratación de obras
It is designed for power utility distribution project engineers, substation construction supervisors, medium-voltage and low-voltage electrical works managers and others who want practical, current skills in infrastructure, urban development and partnerships.
The Growing Importance of Distribution Substation Construction and Grid Densification Management in Dakar
La infraestructura y los servicios urbanos determinan el crecimiento, la salud y las oportunidades. Los proyectos son grandes, complejos y de larga duración, y las deficiencias en la planificación, la financiación o la ejecución resultan costosas de corregir después.
Los gobiernos combinan cada vez más la inversión pública, las asociaciones con el sector privado y las nuevas tecnologías. Los equipos capaces de planificar, evaluar, contratar y gestionar estas inversiones obtienen mejores activos y servicios.
Las organizaciones necesitan cada vez más profesionales capaces de:
- Planificar y priorizar las inversiones en infraestructura
- Evaluar proyectos y preparar casos de negocio
- Elegir modelos de financiación y de ejecución
- Supervisar las obras en cuanto a plazos, costes y calidad
- Gestionar los activos a lo largo de su vida útil
Unos sistemas sólidos de infraestructura, desarrollo urbano y alianzas ayudan a las organizaciones a:
- Seleccionar las inversiones adecuadas
- Ejecutar los proyectos en plazo y dentro del presupuesto
- Atraer financiación y socios
- Prolongar la vida útil de los activos
This Distribution Substation Construction and Grid Densification Management in Dakar programme brings these elements together in a practical format, so that participants understand not only what good practice looks like but also how to introduce it in their own setting, with the people and resources they have.
Who Should Attend This Distribution Substation Construction and Grid Densification Management in Dakar Training?
Este programa está dirigido a:
- Power utility distribution project engineers
- Substation construction supervisors
- Medium-voltage and low-voltage electrical works managers
- Project implementation unit (PIU) technical specialists
- Distribution network planning and rehabilitation engineers
- Site inspection and quality assurance engineers
- Donor-financed electrification project coordinators
- Consulting electrical engineers and technical supervisors
- Public works contract administrators handling power tenders
- Planificadores urbanos y de infraestructuras
- Ingenieros y responsables técnicos
- Gerentes de proyectos y programas
El programa es adecuado tanto para profesionales con experiencia como para quienes asumen nuevas responsabilidades. Se fomentan los grupos que mezclan instituciones y países, porque los participantes aprenden mucho de la experiencia de los demás.
Marque lo que su equipo necesita ser capaz de hacer.
Distribution Substation Construction and Grid Densification Management in Dakar Training Objectives
Upon successful completion of this Distribution Substation Construction and Grid Densification Management in Dakar Training, participants will be able to:
- Appraise medium-to-low voltage distribution substation designs according to IEC and local utility standards
- Supervise civil, structural, and electrical contractor works across urban and peri-urban grid densification sites
- Evaluate transformer installation, switchgear alignment, and busbar connections for operational safety and compliance
- Execute site acceptance testing and pre-commissioning verification procedures for distribution substations and lines
- Apply earthing grid calculations and soil resistivity testing methods to safeguard distribution infrastructure
- Implement international environmental, health, and safety protocols on active electrical construction sites
- Manage contractor performance, technical variation requests, and handover processes for capital distribution projects
- Explicar cómo se planifica y prioriza la infraestructura
- Evaluar proyectos y preparar un caso de negocio
- Comparar modelos de financiación y de ejecución, incluidas las alianzas
Cada objetivo se practica durante el programa mediante ejercicios, casos o trabajo en grupo, de modo que los participantes salgan siendo capaces de hacerlo, no solo de describirlo.
Contenido y estructura del programa
- Network densification typologies in urban and peri-urban environments
- Medium-voltage and low-voltage line routing, corridor rights, and wayleave clearance
- Soil mechanics, foundation design, and civil works validation for pad-mounted substations
- Civil structures for pole-mounted transformers and compact secondary substations
- Health and safety risk assessment under World Bank Group Environmental, Health, and Safety Guidelines
- Installation practices for 11kV, 20kV, and 33kV distribution transformers
- Medium-voltage switchgear assembly, alignment, and internal arc classification (IAC) checks
- Low-voltage distribution board integration, feeder pillar positioning, and busbar torque verification
- Secondary wiring, auxiliary power systems, and battery bank installation standards
- Safe handling, rigging, and mechanical placement of primary electrical equipment
- Substation earthing network design, electrode placement, and IEC 61936-1 standards
- Soil resistivity measurements and step-and-touch potential safety verification
- Underground cable trenching, laying depth, ducting, and backfilling standards
- Medium-voltage cable jointing, termination techniques, and cold-shrink application controls
- Overhead-to-underground transition interfaces, surge arrester installation, and drop-out fuse mounting
- Engineering procurement and construction (EPC) contract supervision and quality control plans
- Managing site instructions, non-conformance reports (NCRs), and variation requests
- Verification of equipment test certificates and factory acceptance testing (FAT) results
- Supervision of pole dressing, conductor stringing, and sag-tension verification
- Environmental mitigation and waste management for dielectric oils and hazardous construction materials
- Insulation resistance, winding resistance, and transformer voltage ratio testing
- Protection relay configuration checks, primary injection, and trip test validation
- Site Acceptance Testing (SAT) sign-off protocols and pre-energisation checklists
- Energisation sequencing, phasing checks, and no-load switching operations
- Defects liability monitoring, as-built documentation review, and formal utility asset handover
Contenido completo día a día
El programa dura 5 días. Cada jornada combina aportaciones de expertos, trabajo práctico y un taller o estudio de caso de cierre:
- First Day: Distribution Grid Densification Planning and Site Preparation
- Second Day: Substation Equipment Erection and Primary Plant Installation
- Third Day: Earthing Systems, Cabling, and Network Connections
- Fourth Day: Inspection, Quality Assurance, and Contractor Supervision
- Fifth Day: Site Acceptance Testing, Pre-Commissioning, and Asset Handover
Contenido completo día a día
First Day | Distribution Grid Densification Planning and Site Preparation
- Network densification typologies in urban and peri-urban environments
- Medium-voltage and low-voltage line routing, corridor rights, and wayleave clearance
- Soil mechanics, foundation design, and civil works validation for pad-mounted substations
- Civil structures for pole-mounted transformers and compact secondary substations
- Health and safety risk assessment under World Bank Group Environmental, Health, and Safety Guidelines
Workshop: Distribution Grid Densification Planning and Site Preparation: Applying It to Your Institution
Trabajando en grupos pequeños, los participantes aplican los métodos del día a ejemplos de sus propias instituciones y acuerdan los siguientes pasos prácticos.
Second Day | Substation Equipment Erection and Primary Plant Installation
- Installation practices for 11kV, 20kV, and 33kV distribution transformers
- Medium-voltage switchgear assembly, alignment, and internal arc classification (IAC) checks
- Low-voltage distribution board integration, feeder pillar positioning, and busbar torque verification
- Secondary wiring, auxiliary power systems, and battery bank installation standards
- Safe handling, rigging, and mechanical placement of primary electrical equipment
Workshop: Substation Equipment Erection and Primary Plant Installation: Applying It to Your Institution
Trabajando en grupos pequeños, los participantes aplican los métodos del día a ejemplos de sus propias instituciones y acuerdan los siguientes pasos prácticos.
Third Day | Earthing Systems, Cabling, and Network Connections
- Substation earthing network design, electrode placement, and IEC 61936-1 standards
- Soil resistivity measurements and step-and-touch potential safety verification
- Underground cable trenching, laying depth, ducting, and backfilling standards
- Medium-voltage cable jointing, termination techniques, and cold-shrink application controls
- Overhead-to-underground transition interfaces, surge arrester installation, and drop-out fuse mounting
Case Study: Earthing Systems, Cabling, and Network Connections in Practice
Los participantes analizan un caso realista, comparan las decisiones tomadas con las buenas prácticas y extraen lecciones que pueden aplicar en su propio contexto.
Fourth Day | Inspection, Quality Assurance, and Contractor Supervision
- Engineering procurement and construction (EPC) contract supervision and quality control plans
- Managing site instructions, non-conformance reports (NCRs), and variation requests
- Verification of equipment test certificates and factory acceptance testing (FAT) results
- Supervision of pole dressing, conductor stringing, and sag-tension verification
- Environmental mitigation and waste management for dielectric oils and hazardous construction materials
Workshop: Inspection, Quality Assurance, and Contractor Supervision: Applying It to Your Institution
Trabajando en grupos pequeños, los participantes aplican los métodos del día a ejemplos de sus propias instituciones y acuerdan los siguientes pasos prácticos.
Fifth Day | Site Acceptance Testing, Pre-Commissioning, and Asset Handover
- Insulation resistance, winding resistance, and transformer voltage ratio testing
- Protection relay configuration checks, primary injection, and trip test validation
- Site Acceptance Testing (SAT) sign-off protocols and pre-energisation checklists
- Energisation sequencing, phasing checks, and no-load switching operations
- Defects liability monitoring, as-built documentation review, and formal utility asset handover
Capstone Exercise: Distribution Substation Construction and Grid Densification Management in Dakar Action Plan for Your Institution
Los participantes integran lo aprendido durante la semana en un plan de acción para su propia institución, con prioridades, responsables y primeros pasos, y lo presentan para recibir comentarios de sus pares y de los facilitadores.
- Transacción
- Registro
- Control
- Evidencia
- Opinión
Distribution Substation Construction and Grid Densification Management in Dakar Training Methodology
The training employs a performance-focused adult learning framework tailored to capital project execution. Participants work through realistic engineering scenarios, examining detailed design drawings, construction checklists, and manufacturer test certificates. Practical workshops involve calculating earthing grids, reviewing non-conformance scenarios from regional electrification projects, and developing Site Acceptance Testing (SAT) sequences. Facilitated peer discussions enable utility engineers to compare institutional practices and address common supervision bottlenecks in line with multilateral development bank standards.
El programa combina:
- Sesiones dirigidas por expertos sobre la práctica actual
- Estudios de caso regionales e internacionales
- Trabajo en grupo y ejercicios prácticos
- Simulaciones y juegos de rol cuando proceda
- Análisis de los desafíos propios de los participantes
- Aprendizaje entre pares de distintas instituciones y países
- Herramientas y plantillas prácticas para llevar al trabajo
- Reflexión diaria y planificación de acciones
Antes del programa, una breve evaluación previa ayuda a los facilitadores a comprender la función y las prioridades de cada participante, para adaptar los ejemplos y ejercicios al grupo. Cada jornada termina con una breve reflexión en la que los participantes anotan lo que aplicarán en su trabajo.
Resultados esperados
Upon completion of this Distribution Substation Construction and Grid Densification Management in Dakar Training, participants will be able to:
- Manage distribution substation civil and electrical construction works in compliance with IEC standards
- Direct site supervision of electrical contractors to eliminate workmanship defects and project delays
- Perform and witness standard Site Acceptance Testing on distribution transformers and switchgear
- Calculate and verify earthing systems to ensure personnel safety and network resilience
- Administer strict environmental, health, and safety compliance across urban worksites
- Execute systematic pre-commissioning procedures and asset handover documentation for public utilities
- Planificar y priorizar las inversiones en infraestructura
- Evaluar proyectos y preparar casos de negocio
Los participantes se marchan con un plan de acción personal y herramientas prácticas que pueden utilizar en su institución desde la primera semana de regreso. Las instituciones que envían a varios participantes pueden aprovechar el programa para acordar métodos y plantillas comunes entre equipos, lo que facilita mantener las mejoras.
2.750 £ por participante · factura y transferencia bancaria · descuento para grupos de 5 o más personas
Cinco o más personas de una misma organización: solicite la tarifa de grupo al pedir la factura.
Diez o más: una versión interna para su institución puede costar menos por persona. Solicite un presupuesto para una formación interna.
Registration closes in 148 days (10 Apr 2027)
Institutional Application of Distribution Substation Construction and Grid Densification Management in Dakar Training
Este programa ayuda a las organizaciones a fortalecer:
- Planificación de inversiones
- Evaluación de proyectos
- Gestión de alianzas
- Supervisión de obras
- Gestión de activos
Los participantes regresan con herramientas prácticas para mejorar:
- Casos de negocio
- Asignación de riesgos
- Gestión de contratos
- Planificación del mantenimiento
- Seguimiento de los servicios
El programa está concebido para que el aprendizaje pase del aula a la institución. Siempre que es posible, los participantes trabajan con sus propios procesos y documentos, y se marchan con un plan de acción que sus responsables pueden revisar y respaldar.
Pertinencia y aplicación regionales
Europa
Las instituciones europeas aplican la infraestructura, el desarrollo urbano y las alianzas dentro de marcos normativos detallados y agendas de reforma. Los participantes de Europa pueden comparar su práctica con la de colegas de otras regiones y comprobar cómo funcionan los métodos consolidados en condiciones diferentes.
África
En toda África, los ministerios, organismos y equipos de proyecto que trabajan en infraestructura, desarrollo urbano y alianzas operan cada vez más junto a programas financiados por donantes que esperan sistemas y evidencias claros. El programa ayuda a los participantes a adaptar las buenas prácticas a las instituciones y los recursos con los que trabajan.
Oriente Medio
En Oriente Medio, las estrategias nacionales de desarrollo y los planes de diversificación plantean exigencias crecientes en materia de infraestructura, desarrollo urbano y alianzas. Los participantes analizan cómo desarrollar dentro de los organismos públicos y las empresas las capacidades que requieren estos planes.
Asia
Las instituciones de toda Asia combinan un rápido crecimiento con ambiciosos programas de modernización. Los participantes de Asia pueden compartir su experiencia en el escalamiento rápido de sistemas y conocer los enfoques utilizados en otros lugares.
Pacífico
Los pequeños Estados insulares y del Pacífico afrontan limitaciones particulares de tamaño, distancia y capacidad. El programa destaca enfoques prácticos y proporcionados de infraestructura, desarrollo urbano y alianzas adaptados a instituciones más pequeñas.
Holding the programme in Dakar, Senegal brings participants together away from their daily pressures, so they can compare how infrastructure, urban development and partnerships is handled in different settings. The same programme can also be delivered in-house for one institution, in its own country or online, with cases taken from its current work.
Host Country Profile – Senegal
Training programmes and study tours in Dakar suit professionals, project teams, and civil servants seeking exposure to West African governance, regional trade, and infrastructure development.
Estudiar fuera de su país ofrece a los participantes tiempo para concentrarse, una mirada nueva sobre su propia institución y la oportunidad de crear una red con colegas de otros países.
Distribution Substation Construction and Grid Densification Management in Dakar Training Deliverables
Los participantes reciben apoyo antes, durante y después del programa, de modo que la preparación, el aprendizaje y el seguimiento formen una experiencia continua.
Antes del programa
- Evaluación previa del participante
- Distribution Substation Construction and Grid Densification Management in Dakar Readiness Assessment
- Distribution Substation Construction and Grid Densification Management in Dakar Resource Pack
- Materiales de lectura preparatoria
- Apoyo y asesoramiento gratuitos para el visado
Durante el programa
- Recogida en el aeropuerto y asistencia de bienvenida
- Alojamiento con desayuno
- Cena de bienvenida y networking
- Kit de formación de Risalat (bolsa, botella, taza, camiseta, gorra, funda de pasaporte, bolígrafos, cuaderno, imán y llavero)
- Comprehensive Distribution Substation Construction and Grid Densification Management in Dakar Training Manual
- Plantilla de evaluación de proyectos
- Matriz de asignación de riesgos de APP
- Lista de verificación para la supervisión de obras
- Plantilla de plan de gestión de activos
- Talleres prácticos y simulaciones
- Debates en grupo y aprendizaje entre pares
- Almuerzo y refrigerios diarios
- Acceso completo a las instalaciones de la sede de formación
- Mini Pad / tableta con materiales didácticos digitales
- Visita de campo (cuando proceda)
- Recorrido turístico por la ciudad
Después del programa
- Certificado de finalización
- Reconocimiento a la participación en programas de Risalat
- Materiales de consulta posteriores a la formación
- Lista de verificación para la revisión del caso de negocio
- Plantilla de plan de mantenimiento
- Apoyo posterior a la formación y orientación de seguimiento
- Informe del programa
Las instituciones también pueden solicitar una versión interna de este programa adaptada a sus necesidades, impartida en sus instalaciones o en línea. Solicitar una propuesta.
Common Challenges in Distribution Substation Construction and Grid Densification Management in Dakar, And How This Training Helps
¿Cómo pueden las instituciones planificar y priorizar las inversiones en infraestructura?
The programme addresses this directly on the first day (Distribution Grid Densification Planning and Site Preparation), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
¿Cómo pueden las instituciones evaluar proyectos y preparar su justificación económica?
The programme addresses this directly on the second day (Substation Equipment Erection and Primary Plant Installation), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
¿Cómo pueden las instituciones elegir los modelos de financiación y ejecución?
The programme addresses this directly on the third day (Earthing Systems, Cabling, and Network Connections), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
¿Cómo pueden las instituciones supervisar las obras en cuanto a plazos, costes y calidad?
The programme addresses this directly on the fourth day (Inspection, Quality Assurance, and Contractor Supervision), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
¿Cómo pueden las instituciones gestionar los activos a lo largo de su vida útil?
The programme addresses this directly on the fifth day (Site Acceptance Testing, Pre-Commissioning, and Asset Handover), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
Preguntas frecuentes
When and where does the Distribution Substation Construction and Grid Densification Management in Dakar programme take place?
It runs from 10 May 2027 to 14 May 2027, in Dakar, Senegal. The registration deadline is shown at the top of this page.
¿Quién debería asistir?
The programme is designed for power utility distribution project engineers, substation construction supervisors, medium-voltage and low-voltage electrical works managers, project implementation unit (PIU) technical specialists, and others who want practical skills in infrastructure, urban development and partnerships.
¿Recibiré un certificado?
Sí. Los participantes que completan el programa reciben un Certificado de finalización de Risalat Consultants International.
¿Puede impartirse este programa solo para nuestra institución?
Sí. Podemos impartir una versión interna a medida en sus instalaciones, en otra ciudad o en línea, construida en torno a sus propios casos. Utilice la solicitud de propuesta de esta página.
¿Necesito experiencia previa en infraestructura, desarrollo urbano y alianzas?
No se requiere formación especializada más allá de la experiencia en un puesto afín. Una breve evaluación previa ayuda a los facilitadores a adaptar las sesiones al grupo.
Who Will Deliver This Programme
Each date is delivered by a team assigned from Risalat's expert network for this subject. For this programme we assign:
How we choose them: Experience in the region of the participants or comparable settings; Command of the financier rules that apply (World Bank, ADB, AfDB, EU, UN) where relevant; Delivery in English; other languages on request for in-house groups; No conflict of interest with participants' institutions.
Names and short CVs of the assigned experts are shared with registered participants and sponsoring organisations before the programme, on request. Are you an expert in this subject? Join our expert network.
Training courses in DakarEnergy and Water training courses
Why Dakar for this programme
Dakar serves as a major diplomatic and administrative hub in West Africa, hosting regional bodies such as the Central Bank of West African States (BCEAO) and various United Nations agencies. Participants can observe major infrastructure projects, including the Port of Dakar and the Regional Express Train (TER). The city is accessible via direct international flights from across Africa, Europe, and North America.
The Distribution Substation Construction and Grid Densification Management in Dakar programme in May 2027 brings together officials and professionals from across the Africa region and beyond. Sessions combine short inputs, case studies and group work on participants' own files, and the city's institutions can be added as a study visit on request.
Getting there: Blaise Diagne International (DSS).
Compruebe si necesita visado con el Verificador de visados gratuito y solicite una carta de invitación una vez inscrito.
Other programmes in Dakar
- Solar Mini-Grid EPC Contracting and Biomass Hybrid Operations in Dakar
- School Pedagogical Supervision, Inspection and Headteacher Coaching in Dakar
- Lowland Road Embankment Engineering and Culvert Hydraulics in Dakar
- Sub-National Fiduciary Auditing and Communal Grant Verification in Dakar
- Commercial Agri-Corridor Road Upgrading and Maintenance Contracts in Dakar
For teams and institutions
Bring your team
Teams that learn together apply more at work. Tell us how many people and how you would like to take part: we reply with a group quote within two working days.
Other dates and cities for this subject: Energy, Power and Utility Management training courses (118 upcoming dates).
More training courses in Senegal · Todos los programas en África · Calendario de formación completo
Plan this programme in a roadmap: why it matters, why to approve it, the dates to plan and the career it builds.



