Profesionales humanitariosPrograma de 5 días

Displacement-Affected Community Infrastructure Planning in Muscat

Fechas15–19 mar 2027
LocationMuscat, Oman
SedeSe comunicará al inscribirse
Inscríbase antes del13 feb 2027

Datos clave

Fechas
15–19 mar 2027 (5 días)
Dónde
Muscat, Oman
Tarifa por participante
3.850 £ (GBP)
Pago
Mediante factura y transferencia bancaria
Cierre de inscripciones
13 feb 2027
Certificado
Certificado de finalización
En esta página 14 secciones

Descripción del programa

Rapid displacement presents severe operational challenges for urban municipal authorities and rural host settlements. This programme provides professionals with the technical instruments required to design and implement infrastructure upgrades in areas absorbing internally displaced persons and returnees. Delivered in Muscat, the course bridges emergency relief and durable engineering solutions, focusing on essential municipal service delivery, site accessibility, and the practical rehabilitation of community public assets under constrained timelines and tight fiscal oversight.

Delegates examine spatial layout planning, off-grid water supply extensions, and resilient drainage networks designed specifically for densely populated settlement pockets. The curriculum analyses the operational interfaces between municipal master plans and transitional settlement extensions. Through detailed technical reviews, participants learn to establish community infrastructure priorities using social assessments that integrate host populations and displaced families, minimising social friction whilst upholding established technical, environmental, and international social safeguard standards across all works.

The training establishes practical implementation arrangements for multi-sector community development councils, strengthening local governance mechanisms. Participants master operational workflows for procurement, subproject supervision, and operations and maintenance planning for shelter-adjacent community assets. By examining internationally accepted frameworks from major multilateral development finance institutions, the course equips project delivery teams with the administrative rigour and engineering management skills necessary to deliver sustainable, donor-financed infrastructure schemes in high-risk, displacement-affected environments.

Municipalities and community development agencies face acute pressure to stabilise basic service delivery in areas absorbing large influxes of displaced persons and returning populations. Capital programmes such as the Citizens' Charter Afghanistan Project – Emergency Regional Displacement Response Additional Financing demand robust subproject planning, rapid procurement, and transparent local oversight. Without structured infrastructure planning capacities, investments risk operational failure, heightened community tension, and rapid asset deterioration. This course equips technical teams to plan, build, and maintain public assets under strict multilateral development bank guidelines, ensuring funding delivers immediate, durable social protection and basic service continuity.

Delivered by Risalat Consultants International in Muscat, Oman, it combines expert-led sessions, real cases and group work, so that participants can apply what they learn in their own institution.

The Programme Strengthens Institutional Capability

  • Typologies of displacement settlements and municipal integration challenges in Afghanistan and regional contexts
  • Spatial planning fundamentals: Buffer zones, rights-of-way, and basic access corridors in transitional areas
  • Application of the World Bank Environmental and Social Framework (ESF) in displacement operations
  • Sphere Minimum Standards for shelter settlement planning and basic communal infrastructure
  • Screening land tenure constraints and mitigating involuntary resettlement risks in public land allocations
  • Methodologies for rapid social and technical baseline assessments in returnee-dense communities
  • Gender-inclusive data collection and vulnerable group representation in infrastructure planning
  • Establishing technical criteria for prioritising access roads, culverts, and tertiary drainage
  • Clasificación de riesgos ambientales y sociales
  • Instrumentos de evaluación y planes de gestión
  • Planificación de la participación de las partes interesadas
  • Mecanismos de reclamación que funcionan

It is designed for resettlement planners and urban development specialists, municipal engineers and public works directors, community displacement response managers and others who want practical, current skills in environmental, social and stakeholder management.


The Growing Importance of Displacement-Affected Community Infrastructure Planning in Muscat

Su recorrido de 5 días toque un día para ver las sesiones
    • Typologies of displacement settlements and municipal integration challenges in Afghanistan and regional contexts
    • Spatial planning fundamentals: Buffer zones, rights-of-way, and basic access corridors in transitional areas
    • Application of the World Bank Environmental and Social Framework (ESF) in displacement operations
    • Sphere Minimum Standards for shelter settlement planning and basic communal infrastructure
    • Screening land tenure constraints and mitigating involuntary resettlement risks in public land allocations

Los financiadores exigen ahora que los proyectos identifiquen y gestionen los riesgos ambientales y sociales desde el principio, e impliquen a las personas afectadas. Una gestión deficiente de las salvaguardas provoca retrasos, suspensiones de desembolsos y daños duraderos a las comunidades.

Las buenas prácticas en participación de las partes interesadas, gestión de reclamaciones, inclusión y reasentamiento protegen a las personas y mantienen los proyectos en marcha. Los equipos que conocen las normas y las aplican desde el principio ahorran tiempo y generan confianza.

Las organizaciones necesitan cada vez más profesionales capaces de:

  • Analizar y clasificar los riesgos ambientales y sociales
  • Preparar y aplicar planes de gestión
  • Implicar de forma significativa a las partes interesadas durante todo el proyecto
  • Gestionar mecanismos de reclamación que resuelvan los problemas
  • Hacer el seguimiento de los compromisos con los financiadores e informar sobre ellos

Unos sistemas sólidos de gestión ambiental, social y de partes interesadas ayudan a las organizaciones a:

  • Evitar retrasos y suspensiones de desembolsos
  • Proteger a las comunidades y a los trabajadores
  • Cumplir las normas y los compromisos de los financiadores
  • Generar confianza con las personas afectadas y con el público

This Displacement-Affected Community Infrastructure Planning in Muscat programme brings these elements together in a practical format, so that participants understand not only what good practice looks like but also how to introduce it in their own setting, with the people and resources they have.


Who Should Attend This Displacement-Affected Community Infrastructure Planning in Muscat Training?

Este programa está dirigido a:

  • Resettlement planners and urban development specialists
  • Municipal engineers and public works directors
  • Community displacement response managers
  • Project management unit staff from donor-financed programmes
  • Social safeguards and community development coordinators
  • Rural development officers working with displaced populations
  • Water, sanitation, and hygiene technical leads in municipal entities
  • Monitoring and evaluation officers tracking civil works projects
  • Engineers supporting community development council infrastructure subprojects
  • Especialistas ambientales y sociales
  • Responsables de salvaguardas en las UEP
  • Gerentes de proyectos y programas

El programa es adecuado tanto para profesionales con experiencia como para quienes asumen nuevas responsabilidades. Se fomentan los grupos que mezclan instituciones y países, porque los participantes aprenden mucho de la experiencia de los demás.

¿Es adecuado para su equipo?

Marque lo que su equipo necesita ser capaz de hacer.

Marque los elementos que correspondan

Displacement-Affected Community Infrastructure Planning in Muscat Training Objectives

Upon successful completion of this Displacement-Affected Community Infrastructure Planning in Muscat Training, participants will be able to:

  • Apply spatial planning techniques to integrate basic infrastructure networks within dense displacement settlements and returnee sites
  • Formulate rapid social and technical needs assessment protocols for high-density, displacement-affected communities
  • Design water supply extensions and shelter-adjacent drainage schemes that comply with multilateral environmental and social standards
  • Establish transparent operational workflows for multi-sector community development councils managing local civil works
  • Structure procurement and contract supervision procedures for labour-intensive community access and municipal public works
  • Incorporate Sphere project technical minimum standards and World Bank Environmental and Social Framework requirements into subproject designs
  • Develop operations and maintenance plans that empower local host and returnee committees to secure asset longevity
  • Explicar las normas ambientales y sociales aplicables a sus proyectos
  • Analizar y clasificar riesgos e impactos
  • Preparar los instrumentos clave y los planes de gestión

Cada objetivo se practica durante el programa mediante ejercicios, casos o trabajo en grupo, de modo que los participantes salgan siendo capaces de hacerlo, no solo de describirlo.


Contenido y estructura del programa

El programa dura 5 días. Cada jornada combina aportaciones de expertos, trabajo práctico y un taller o estudio de caso de cierre:

  • First Day: Displacement Contexts, Spatial Layouts, and Safeguard Frameworks
  • Second Day: Rapid Needs Assessments and Community-Level Prioritisation
  • Third Day: Water Supply Extensions and Basic Environmental Infrastructure
  • Fourth Day: Procurement, Works Supervision, and Council Governance
  • Fifth Day: Asset Handover, Long-Term O&M, and Programme Exit Strategies

Contenido completo día a día

First Day | Displacement Contexts, Spatial Layouts, and Safeguard Frameworks

  • Typologies of displacement settlements and municipal integration challenges in Afghanistan and regional contexts
  • Spatial planning fundamentals: Buffer zones, rights-of-way, and basic access corridors in transitional areas
  • Application of the World Bank Environmental and Social Framework (ESF) in displacement operations
  • Sphere Minimum Standards for shelter settlement planning and basic communal infrastructure
  • Screening land tenure constraints and mitigating involuntary resettlement risks in public land allocations

Workshop: Displacement Contexts, Spatial Layouts, and Safeguard Frameworks: Applying It to Your Institution

Trabajando en grupos pequeños, los participantes aplican los métodos del día a ejemplos de sus propias instituciones y acuerdan los siguientes pasos prácticos.

Second Day | Rapid Needs Assessments and Community-Level Prioritisation

  • Methodologies for rapid social and technical baseline assessments in returnee-dense communities
  • Gender-inclusive data collection and vulnerable group representation in infrastructure planning
  • Establishing technical criteria for prioritising access roads, culverts, and tertiary drainage
  • Conflict-sensitive resource mapping to prevent host and displaced community tensions
  • Designing participatory subproject identification workshops with Community Development Councils (CDCs)

Workshop: Rapid Needs Assessments and Community-Level Prioritisation: Applying It to Your Institution

Trabajando en grupos pequeños, los participantes aplican los métodos del día a ejemplos de sus propias instituciones y acuerdan los siguientes pasos prácticos.

Third Day | Water Supply Extensions and Basic Environmental Infrastructure

  • Technical designs for water supply network extensions, communal standposts, and storage facilities
  • Small-scale wastewater management and surface water drainage adjacent to emergency shelters
  • Solid waste collection points: Siting, civil works specifications, and access routing
  • Climate resilience and flood protection considerations for low-cost settlement infrastructure
  • Water quality testing, monitoring protocols, and public health risk mitigation during works execution

Case Study: Water Supply Extensions and Basic Environmental Infrastructure in Practice

Los participantes analizan un caso realista, comparan las decisiones tomadas con las buenas prácticas y extraen lecciones que pueden aplicar en su propio contexto.

Fourth Day | Procurement, Works Supervision, and Council Governance

  • Procurement modalities for community-driven development and emergency additional financing projects
  • Community contracting: Drafting transparent labor-based contracts and material purchase logs
  • Supervision mechanisms for municipal engineers: Quality assurance, milestone verification, and invoicing
  • Financial management, cash-for-work protocols, and anti-corruption controls at the council tier
  • Establishing functioning grievance redress mechanisms (GRM) for site-level civil works disputes

Workshop: Procurement, Works Supervision, and Council Governance: Applying It to Your Institution

Trabajando en grupos pequeños, los participantes aplican los métodos del día a ejemplos de sus propias instituciones y acuerdan los siguientes pasos prácticos.

Fifth Day | Asset Handover, Long-Term O&M, and Programme Exit Strategies

  • Formulating joint operations and maintenance (O&M) plans between CDCs and municipal authorities
  • Tariff structures, community contribution models, and spare parts supply chain setup
  • Conducting post-construction technical audits and punch-list resolution protocols
  • Monitoring asset utilisation, social cohesion indicators, and service delivery performance
  • Final action planning: Drafting operational roadmaps for participants' individual project units

Capstone Exercise: Displacement-Affected Community Infrastructure Planning in Muscat Action Plan for Your Institution

Los participantes integran lo aprendido durante la semana en un plan de acción para su propia institución, con prioridades, responsables y primeros pasos, y lo presentan para recibir comentarios de sus pares y de los facilitadores.


Displacement-Affected Community Infrastructure Planning in Muscat Training Methodology

The training employs adult learning techniques focused on operational municipal practice. Participants work through real displacement scenario case studies, engineering plan reviews, and participatory governance simulations. Instruction balances technical presentations of multilateral guidelines with small-group exercises requiring delegates to draft procurement schedules, subproject screening notes, and asset maintenance plans. Daily peer-review sessions allow engineers and planners to cross-examine project implementation challenges and refine applied solutions for immediate transfer to their respective project implementation units.

El programa combina:

  • Sesiones dirigidas por expertos sobre la práctica actual
  • Estudios de caso regionales e internacionales
  • Trabajo en grupo y ejercicios prácticos
  • Simulaciones y juegos de rol cuando proceda
  • Análisis de los desafíos propios de los participantes
  • Aprendizaje entre pares de distintas instituciones y países
  • Herramientas y plantillas prácticas para llevar al trabajo
  • Reflexión diaria y planificación de acciones

Antes del programa, una breve evaluación previa ayuda a los facilitadores a comprender la función y las prioridades de cada participante, para adaptar los ejemplos y ejercicios al grupo. Cada jornada termina con una breve reflexión en la que los participantes anotan lo que aplicarán en su trabajo.


Resultados esperados

Upon completion of this Displacement-Affected Community Infrastructure Planning in Muscat Training, participants will be able to:

  • Produce integrated spatial layout plans that accommodate basic utilities in host and returnee settlements
  • Execute rapid social needs assessments to formulate vetted infrastructure priority matrices
  • Prepare technical specifications for water extensions, drainage, and pedestrian access in displaced sites
  • Implement governance protocols for community development councils overseeing civil works contracts
  • Enforce multilateral development bank environmental and social safeguard standards across all subprojects
  • Formulate institutional handover agreements and self-funding community operations and maintenance strategies
  • Analizar y clasificar los riesgos ambientales y sociales
  • Preparar y aplicar planes de gestión

Los participantes se marchan con un plan de acción personal y herramientas prácticas que pueden utilizar en su institución desde la primera semana de regreso. Las instituciones que envían a varios participantes pueden aprovechar el programa para acordar métodos y plantillas comunes entre equipos, lo que facilita mantener las mejoras.

Planifique las plazas de su equipo

3.850 £ por participante · factura y transferencia bancaria · los grupos de 5 o más personas reciben un descuento

1participante(s)
3.850 £con la tarifa estándar

Las inscripciones se cierran en 93 días (13 feb 2027)


Institutional Application of Displacement-Affected Community Infrastructure Planning in Muscat Training

Este programa ayuda a las organizaciones a fortalecer:

  • Gestión de riesgos ambientales y sociales
  • Participación de las partes interesadas
  • Atención de reclamaciones
  • Gestión de contratistas
  • Inclusión de grupos vulnerables

Los participantes regresan con herramientas prácticas para mejorar:

  • Planes de gestión
  • Planes de participación
  • Registros de reclamaciones
  • Informes de seguimiento
  • Notificación de incidentes

El programa está concebido para que el aprendizaje pase del aula a la institución. Siempre que es posible, los participantes trabajan con sus propios procesos y documentos, y se marchan con un plan de acción que sus responsables pueden revisar y respaldar.


Pertinencia y aplicación regionales

Europa

Las instituciones europeas aplican la gestión ambiental, social y de partes interesadas dentro de marcos normativos detallados y agendas de reforma. Los participantes de Europa pueden comparar su práctica con la de colegas de otras regiones y comprobar cómo funcionan los métodos consolidados en condiciones diferentes.

África

En toda África, los ministerios, organismos y equipos de proyecto que trabajan en gestión ambiental, social y de partes interesadas operan cada vez más junto a programas financiados por donantes que exigen sistemas y evidencias claros. El programa ayuda a los participantes a adaptar las buenas prácticas a las instituciones y los recursos con los que trabajan.

Oriente Medio

En Oriente Medio, las estrategias nacionales de desarrollo y los planes de diversificación imponen exigencias crecientes en materia de gestión ambiental, social y de partes interesadas. Los participantes estudian cómo desarrollar dentro de los organismos públicos y las empresas las capacidades que estos planes requieren.

Asia

Las instituciones de toda Asia combinan un rápido crecimiento con ambiciosos programas de modernización. Los participantes de Asia pueden compartir su experiencia en el escalamiento rápido de sistemas y conocer los enfoques utilizados en otros lugares.

Pacífico

Los pequeños Estados insulares y del Pacífico afrontan limitaciones particulares de tamaño, distancia y capacidad. El programa destaca enfoques prácticos y proporcionados de gestión ambiental, social y de partes interesadas, adecuados para instituciones más pequeñas.

Holding the programme in Muscat, Oman brings participants together away from their daily pressures, so they can compare how environmental, social and stakeholder management is handled in different settings. The same programme can also be delivered in-house for one institution, in its own country or online, with cases taken from its current work.

Clasificación de riesgos ambientales y socialesEl MAS del Banco Mundial clasifica los proyectos como de riesgo alto, considerable, moderado o bajo; la clasificación determina la profundidad de la evaluación.

Host Country Profile – Oman

Risalat Consultants International runs open-enrolment training programmes in Muscat, Oman for officials, project teams and professionals from across the region. Dates, fees and what each programme covers are listed above, and any programme can also be delivered in-house for your institution.

Estudiar fuera de su país ofrece a los participantes tiempo para concentrarse, una mirada nueva sobre su propia institución y la oportunidad de crear una red con colegas de otros países.


Displacement-Affected Community Infrastructure Planning in Muscat Training Deliverables

Los participantes reciben apoyo antes, durante y después del programa, de modo que la preparación, el aprendizaje y el seguimiento formen una experiencia continua.

Antes del programa

  • Evaluación previa del participante
  • Displacement-Affected Community Infrastructure Planning in Muscat Readiness Assessment
  • Displacement-Affected Community Infrastructure Planning in Muscat Resource Pack
  • Materiales de lectura preparatoria
  • Apoyo y asesoramiento gratuitos para el visado

Durante el programa

  • Recogida en el aeropuerto y asistencia de bienvenida
  • Alojamiento con desayuno
  • Cena de bienvenida y networking
  • Kit de formación de Risalat (bolsa, botella, taza, camiseta, gorra, funda de pasaporte, bolígrafos, cuaderno, imán y llavero)
  • Comprehensive Displacement-Affected Community Infrastructure Planning in Muscat Training Manual
  • Lista de verificación para el análisis de riesgos
  • Plantilla de plan de participación de las partes interesadas
  • Plantilla de registro de reclamaciones
  • Plantilla de seguimiento ambiental y social
  • Talleres prácticos y simulaciones
  • Debates en grupo y aprendizaje entre pares
  • Almuerzo y refrigerios diarios
  • Acceso completo a las instalaciones de la sede de formación
  • Mini Pad / tableta con materiales didácticos digitales
  • Visita de campo (cuando proceda)
  • Recorrido turístico por la ciudad

Después del programa

  • Certificado de finalización
  • Reconocimiento a la participación en programas de Risalat
  • Materiales de consulta posteriores a la formación
  • Hoja de seguimiento de compromisos
  • Lista de verificación del cumplimiento del contratista
  • Apoyo posterior a la formación y orientación de seguimiento
  • Informe del programa

Las instituciones también pueden solicitar una versión interna de este programa adaptada a sus necesidades, impartida en sus instalaciones o en línea. Solicitar una propuesta.


Common Challenges in Displacement-Affected Community Infrastructure Planning in Muscat, And How This Training Helps

¿Cómo pueden las instituciones analizar y clasificar los riesgos ambientales y sociales?

The programme addresses this directly on the first day (Displacement Contexts, Spatial Layouts, and Safeguard Frameworks), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.

¿Cómo pueden las instituciones preparar y aplicar planes de gestión?

The programme addresses this directly on the second day (Rapid Needs Assessments and Community-Level Prioritisation), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.

¿Cómo pueden las instituciones implicar de forma significativa a las partes interesadas durante todo el proyecto?

The programme addresses this directly on the third day (Water Supply Extensions and Basic Environmental Infrastructure), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.

¿Cómo pueden las instituciones gestionar mecanismos de reclamación que resuelvan los problemas?

The programme addresses this directly on the fourth day (Procurement, Works Supervision, and Council Governance), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.

¿Cómo pueden las instituciones hacer el seguimiento de los compromisos con los financiadores e informar sobre ellos?

The programme addresses this directly on the fifth day (Asset Handover, Long-Term O&M, and Programme Exit Strategies), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.


Preguntas frecuentes

When and where does the Displacement-Affected Community Infrastructure Planning in Muscat programme take place?

It runs from 15 Mar 2027 to 19 Mar 2027, in Muscat, Oman. The registration deadline is shown at the top of this page.

¿Quién debería asistir?

The programme is designed for resettlement planners and urban development specialists, municipal engineers and public works directors, community displacement response managers, project management unit staff from donor-financed programmes, and others who want practical skills in environmental, social and stakeholder management.

¿Recibiré un certificado?

Sí. Los participantes que completan el programa reciben un Certificado de finalización de Risalat Consultants International.

¿Puede impartirse este programa solo para nuestra institución?

Sí. Podemos impartir una versión interna a medida en sus instalaciones, en otra ciudad o en línea, construida en torno a sus propios casos. Utilice la solicitud de propuesta de esta página.

¿Necesito experiencia previa en gestión ambiental, social y de partes interesadas?

No se requiere formación especializada más allá de la experiencia en un puesto afín. Una breve evaluación previa ayuda a los facilitadores a adaptar las sesiones al grupo.

Who Will Deliver This Programme

Each date is delivered by a team assigned from Risalat's expert network for this subject. For this programme we assign:

Lead facilitatorA senior humanitarians specialist with at least 10 years of practice on public-sector and donor-financed projects, who has done the work this programme teaches (Displacement-Affected Community Infrastructure Planning) and trained teams in it.
Practitioner co-facilitatorA current or recent practitioner from a project implementation unit, agency or consulting team, who brings live cases, documents and the mistakes to avoid.
Guest speakersWhere the programme allows, specialists from host-country institutions or financed projects who explain how the system works in practice.
Programme coordinatorA Risalat coordinator who handles the pre-assessment, logistics, visas and the follow-up after the programme.

How we choose them: Experience in the region of the participants or comparable settings; Command of the financier rules that apply (World Bank, ADB, AfDB, EU, UN) where relevant; Delivery in English; other languages on request for in-house groups; No conflict of interest with participants' institutions.

Names and short CVs of the assigned experts are shared with registered participants and sponsoring organisations before the programme, on request. Are you an expert in this subject? Join our expert network.

Training courses in MuscatHumanitarians training courses

Why Muscat for this programme

Muscat is the political and administrative centre of Oman, hosting key government ministries, the Central Bank of Oman, and major infrastructure initiatives. Visiting delegates can observe public administration and port logistics at nearby operational hubs. The city is straightforward to reach through direct international flights connecting Europe, Asia, and the wider Gulf region.

The Displacement-Affected Community Infrastructure Planning in Muscat programme in March 2027 brings together officials and professionals from across the Middle East region and beyond. Sessions combine short inputs, case studies and group work on participants' own files, and the city's institutions can be added as a study visit on request.

Getting there: Muscat International Airport (MCT).

Compruebe si necesita visado con el Verificador de visados gratuito y solicite una carta de invitación una vez inscrito.

Other programmes in Muscat

For teams and institutions

Bring your team

Teams that learn together apply more at work. Tell us how many people and how you would like to take part: we reply with a group quote within two working days.

How

No commitment. Invoices to your institution; payment from project or training budgets.

Other dates and cities for this subject: Resettlement and Livelihood Restoration training courses (20 upcoming dates).

More training courses in Oman · Todos los programas en Oriente Medio · Calendario de formación completo

Plan this programme in a roadmap: why it matters, why to approve it, the dates to plan and the career it builds.

Tarifa por participante3.850 £Inscríbase →