Возобновляемая энергетика

Возобновляемая энергетика в Афганистане: практические пути развития

Afghanistan has significant solar, wind and hydropower potential, but available resources alone do not provide reliable electricity. Delivering energy access requires bankable projects, resilient networks, capable utilities, maintenance and financing suited to local conditions.

Risalat Consultants International
7 October 2020 · 8 min read · Updated 1 Nov 2026
Возобновляемая энергетика в Афганистане: практические пути развития8 мин чтения

Ключевые выводы

  • Understanding the issue and its evidence. Solar irradiance is strong in many parts of Afghanistan, but site choice also depends on land, grid proximity, dust, security, seasonal demand and system losses.
  • Design choices and technical delivery. Remote settlements may benefit from solar-battery mini-grids where grid extension is costly.
  • Financing, procurement and governance. Investors need clear land rights, payment security, realistic tariffs, procurement rules and dispute resolution.
  • Реализация, меры предосторожности и измерение. Электричество может поддерживать ирригацию, клиники, холодильные цепи и малый бизнес при наличии оборудования и финансирования.
  • Применение в государственных ведомствах и проектах, финансируемых донорами. Установленные мегаватты не показывают, получают ли домохозяйства надежное электроснабжение.

In short: A practical guide to renewable energy in afghanistan, with evidence, implementation choices, risks and lessons for ministries, public agencies and.

In short: Afghanistan has significant solar, wind and hydropower potential, but available resources alone do not provide reliable electricity. Delivering energy access requires bankable projects, resilient networks, capable utilities, maintenance and financing suited to local conditions.

World Bank renewable-energy assessments identify strong solar resources and potential for wind and hydropower. More recent UNDP analysis also discusses solar and wind investment opportunities, particularly where access remains limited.

В этом обновленном руководстве исходная статья Risalat пересмотрена, а устоявшиеся понятия отделены от утверждений, требующих новых доказательств. Оно написано для практиков, которым предстоит решать, что финансировать, закупать, регулировать или измерять. Иллюстративные сценарии ниже являются учебными примерами, а не отчетами о завершенных проектах.

The earlier article also highlighted a continuing consideration: – Regulatory Framework and Community Awareness – the country has a significant lack of a realistic timeline for project implementation, as well as poor community awareness on the benefits of such investments. The practical implication is to test this proposition against current local evidence before applying it as policy.

The earlier article also highlighted a continuing consideration: – Economic Circumstances and Poverty that limit available financial resources that can be directed to renewable energy development. The practical implication is to test this proposition against current local evidence before applying it as policy.

The earlier article also highlighted a continuing consideration: – Security Concerts and Political Instability – that hinder reliable information collection and cooperation. Conflicts, war, and weakened centralized governance undermine the process of acquiring the necessary resources to be invested in the nation’s energy needs. The practical implication is to test this proposition against current local evidence before applying it as policy.

The earlier article also highlighted a continuing consideration: For decades, Afghanistan’s secure power supply has been disrupted by conflicts. As a result, the country’s energy generation, transmission, and distribution infrastructure were demolished. Whatever remained, has been stretched far beyond capacity, limiting residents the access to power and light. The practical implication is to test this proposition against current local evidence before applying it as policy.

Суть проблемы и подтверждающие данные

Solar power and resource assessment

Solar irradiance is strong in many parts of Afghanistan, but site choice also depends on land, grid proximity, dust, security, seasonal demand and system losses. A bankable study must use site-specific generation estimates.

Прежде чем устанавливать целевой показатель для солнечной энергетики и оценки ресурсов, ответственная группа должна определить охваченное население или актив, текущее состояние и источник исходной информации для него. Полезные исходные данные фиксируют как то, что известно, так и то, что остается неопределенным. При оценке проекта это предотвращает принятие правдоподобного описания за свидетельство спроса или воздействия.

Wind and hydropower options

Wind opportunities are geographically concentrated, while hydropower depends on river flows, climate variability and downstream users. Resource maps should guide surveys, not replace engineering or environmental assessment.

The practical test for wind and hydropower options is whether two independent reviewers would reach a similar conclusion using the same records. Specify the definition of success, the relevant technical standard and the point at which a design needs reconsideration. Document exceptions openly rather than averaging away difficult cases.

Проектные решения и техническая реализация

Mini-grids and distributed access

Remote settlements may benefit from solar-battery mini-grids where grid extension is costly. Tariff design, productive demand, ownership and repair capacity determine whether service continues after installation.

Рассмотрим гипотетический пилотный проект, ориентированный на мини-сети и распределенный доступ. Группа внедрения должна начать с четко определенного варианта использования, протестировать его в обычных условиях эксплуатации и зафиксировать пользовательский опыт наряду с техническими характеристиками. Закупки должны позволять устранять конструктивные дефекты до начала масштабного развертывания.

Grid reliability and imports

Domestic generation and cross-border supply can complement each other. Planning should consider network losses, transmission constraints, seasonal demand and the financial health of electricity institutions.

Операционная готовность к обеспечению надежности энергосистемы и импорта включает в себя обученный персонал, бюджет на техническое обслуживание, надежные данные и канал для подачи жалоб. Если хотя бы один из этих элементов отсутствует, проект может достичь своего этапа строительства или монтажа, но при этом не обеспечить предоставление предполагаемой услуги. Критерии приемки должны поэтому включать наблюдаемую производительность, а не только поставку оборудования.

Финансирование, закупки и управление

Project finance and bankability

Investors need clear land rights, payment security, realistic tariffs, procurement rules and dispute resolution. Feasibility models should stress-test currency, demand, equipment replacement and operating costs.

For project finance and bankability, a business case should distinguish initial investment from recurring costs. Compare alternatives on a common time horizon, including training, replacement, supervision and the cost of service interruptions. The cheapest compliant tender may not provide the lowest whole-life cost.

Хранение и системная интеграция

Batteries can support evening demand and stabilise smaller systems but add capital and replacement costs. Dispatch planning and appropriate protection systems are essential.

Governance of storage and system integration should clarify who approves changes, who holds the supplier accountable and who pays when assumptions prove wrong. A decision log helps explain trade-offs to auditors and affected communities. Material changes should be reflected in the budget, schedule and risk register before approval.

Проверка решения: сравнила ли команда базовый сценарий бездействия, ограниченный пилот и масштабное мероприятие по одним и тем же критериям затрат, рисков и результатов? Зафиксируйте допущения, лежащие в основе каждого варианта, и причину выбора одного из них.

Реализация, меры защиты и измерение результатов

Community benefits and inclusion

Electricity can support irrigation, clinics, cold chains and small businesses when appliances and finance are available. Consultation should identify affordability constraints and who may be excluded.

A practical control for community benefits and inclusion is to assign an owner, a reporting interval and an action threshold. Monitoring is useful only when findings lead to a decision: investigate, correct, redesign or stop. The threshold should be established before the data are reviewed to reduce pressure to declare success.

Экологический и социальный менеджмент

Solar farms, hydro schemes and transmission lines have land and ecological impacts. Screening, consultation and grievance procedures should be proportionate to the project risks.

Evaluation of environmental and social management should look for unintended effects as well as intended benefits. Record who gains access, who bears costs and whether outcomes differ across locations or user groups. When attribution is uncertain, describe the limitations instead of presenting a correlation as proof of impact.

Практическое упражнение: предоставьте межфункциональной команде исходный уровень, бюджет и два альтернативных варианта решения. Попросите ее подготовить одностраничную записку о решении с указанием главной неопределенности, трех рисков реализации, данных, необходимых для утверждения, и условия для корректирующих действий.

Применение в государственных органах и проектах, финансируемых донорами

Monitoring service quality

Installed megawatts do not show whether households receive dependable power. Track hours of service, outages, collection rates, productive use and maintenance response.

A ministry or project implementation unit addressing monitoring service quality can start with a short diagnostic: map mandates, list approvals, identify missing skills and test whether the proposed intervention fits existing operating arrangements. The result should be a prioritised workplan with named owners, deadlines and verifiable deliverables.

Development programme priorities

Public agencies and donor partners can support feasibility studies, grid planning, transparent procurement, workforce training and performance-based maintenance. Start with a small portfolio of credible projects rather than speculative capacity totals.

In donor-financed work, development programme priorities should be reflected in procurement specifications, financial planning, stakeholder engagement and reporting where relevant. The financing agreement and applicable national law determine the actual obligations. Teams should verify those instruments rather than assume a single donor procedure applies everywhere.

Первые 30 дней: проверьте исходный уровень и проконсультируйтесь с затронутыми пользователями или операторами. Сопоставьте первые четыре вопроса этого руководства с имеющимися местными данными. Составьте краткий перечень пробелов в данных и решений, которые нельзя безопасно отложить.

Дни с 31 по 60: опробуйте одно реализуемое решение, уточните техническое задание и подтвердите финансирование на весь жизненный цикл. Согласуйте распределение обязанностей между владельцами политики, исполнительными ведомствами, поставщиками и надзорными органами. Опубликуйте реестр рисков и план мониторинга, которые можно поддерживать имеющимися силами.

Дни с 61 по 90: проанализируйте первые результаты вместе с пользователями и независимыми специалистами, исправьте слабые допущения и решите, расширить, перепроектировать или прекратить мероприятие. Закрепите извлеченные уроки в шаблонах закупочной документации и операционных процедурах, чтобы следующий проект не повторял ошибок, которых можно избежать.

For a field review of community benefits and inclusion, collect the relevant operating records and speak separately with service users, front-line personnel and the budget holder. Compare their descriptions of the problem and record where they disagree. A discrepancy can indicate a missing measurement, an incentive problem or a genuine difference in experience. A pilot should be designed to resolve that specific uncertainty before public funds are committed to expansion.

For a field review of environmental and social management, collect the relevant operating records and speak separately with service users, front-line personnel and the budget holder. Compare their descriptions of the problem and record where they disagree. A discrepancy can indicate a missing measurement, an incentive problem or a genuine difference in experience. A pilot should be designed to resolve that specific uncertainty before public funds are committed to expansion.

Risalat поддерживает учреждения с помощью диагностических оценок, прикладного обучения и консультационных услуг. Команды могут начать с оценки институционального потенциала, изучить Диагностический центр и запросить индивидуальное предложение, если внешняя поддержка оправданна.

Источники и дополнительная литература: при подготовке этого обновления использовались следующие первичные источники. Сведения об охвате, датах и методологических ограничениях следует уточнять в самих публикациях.


Часто задаваемые вопросы

What should institutions check about solar power and resource assessment?

Solar irradiance is strong in many parts of Afghanistan, but site choice also depends on land, grid proximity, dust, security, seasonal demand and system losses. A bankable study must use site-specific generation estimates. Check the local baseline, technical requirements and responsibilities before scaling a proposed solution.

Что учреждениям следует проверить в отношении микросетей и распределенного доступа?

Remote settlements may benefit from solar-battery mini-grids where grid extension is costly. Tariff design, productive demand, ownership and repair capacity determine whether service continues after installation. Check the local baseline, technical requirements and responsibilities before scaling a proposed solution.

What should institutions check about project finance and bankability?

Investors need clear land rights, payment security, realistic tariffs, procurement rules and dispute resolution. Feasibility models should stress-test currency, demand, equipment replacement and operating costs. Check the local baseline, technical requirements and responsibilities before scaling a proposed solution.

Что учреждениям следует проверить в отношении выгод для общества и инклюзивности?

Электроэнергия может обеспечить работу ирригации, клиник, холодовых цепей и малого бизнеса при наличии бытовых приборов и финансирования. Консультации должны выявить ограничения по доступности и категории лиц, которые могут быть исключены. Перед масштабированием предлагаемого решения проверьте исходные данные на местах, технические требования и сферы ответственности.

What should institutions check about monitoring service quality?

Installed megawatts do not show whether households receive dependable power. Track hours of service, outages, collection rates, productive use and maintenance response. Check the local baseline, technical requirements and responsibilities before scaling a proposed solution.

Смотреть

Дополнительные материалы
Поделиться с командой

Know people who should read this? Become an Ambassador or write with Risalat.

Risalat Consultants International

Партнеры в успехе проектов с 2011 года: диагностика, консультационная поддержка и прикладное обучение для министерств, государственных ведомств и проектных команд.

Нужна помощь, чтобы применить это на практике?

Начните с бесплатной 10-минутной диагностики или обратитесь к нашим экспертам.

Читайте также

Экономика7 февр. 2026 · 10 мин чтения

Экономическая диверсификация стран Залива: переосмысление ресурсной экономики, основанной на нефти

Коротко: экономическая диверсификация стран Залива требует практических решений в отношении ресурсов, фактических данных и реализации. В этом руководстве рассматриваются основные…

Читать →
Экология16 окт. 2025 · 10 мин чтения

Разрыв в климатической политике Бутана: как доноры и цифровое управление могут

Коротко: преодоление разрыва в климатической политике Бутана требует практических решений в отношении ресурсов, фактических данных и реализации. В этом руководстве рассматриваются…

Читать →