Énergies renouvelables

Les énergies renouvelables en Afghanistan : des voies de développement concrètes

Afghanistan has significant solar, wind and hydropower potential, but available resources alone do not provide reliable electricity. Delivering energy access requires bankable projects, resilient networks, capable utilities, maintenance and financing suited to local conditions.

RCIRisalat Consultants International
7 octobre 2020 · 8 min de lecture · Mis à jour le 1 nov. 2026
Les énergies renouvelables en Afghanistan : des voies de développement concrètes8 min de lecture

Points essentiels

  • Understanding the issue and its evidence. Solar irradiance is strong in many parts of Afghanistan, but site choice also depends on land, grid proximity, dust, security, seasonal demand and system losses.
  • Design choices and technical delivery. Remote settlements may benefit from solar-battery mini-grids where grid extension is costly.
  • Financing, procurement and governance. Investors need clear land rights, payment security, realistic tariffs, procurement rules and dispute resolution.
  • Mise en œuvre, sauvegardes et mesure. L'électricité peut soutenir l'irrigation, les centres de santé, les chaînes du froid et les petites entreprises lorsque les équipements et le financement sont disponibles.
  • Application to public agencies and donor-funded projects. Installed megawatts do not show whether households receive dependable power.

In short: A practical guide to renewable energy in afghanistan, with evidence, implementation choices, risks and lessons for ministries, public agencies and.

In short: Afghanistan has significant solar, wind and hydropower potential, but available resources alone do not provide reliable electricity. Delivering energy access requires bankable projects, resilient networks, capable utilities, maintenance and financing suited to local conditions.

World Bank renewable-energy assessments identify strong solar resources and potential for wind and hydropower. More recent UNDP analysis also discusses solar and wind investment opportunities, particularly where access remains limited.

Ce guide actualisé revisite l'article d'origine de Risalat en distinguant les concepts établis des affirmations qui exigent de nouvelles données probantes. Il s'adresse aux praticiens qui doivent décider quoi financer, acheter, réglementer ou mesurer. Les scénarios illustratifs ci-dessous sont des exemples pédagogiques, et non des comptes rendus de projets achevés.

The earlier article also highlighted a continuing consideration: – Regulatory Framework and Community Awareness – the country has a significant lack of a realistic timeline for project implementation, as well as poor community awareness on the benefits of such investments. The practical implication is to test this proposition against current local evidence before applying it as policy.

The earlier article also highlighted a continuing consideration: – Economic Circumstances and Poverty that limit available financial resources that can be directed to renewable energy development. The practical implication is to test this proposition against current local evidence before applying it as policy.

The earlier article also highlighted a continuing consideration: – Security Concerts and Political Instability – that hinder reliable information collection and cooperation. Conflicts, war, and weakened centralized governance undermine the process of acquiring the necessary resources to be invested in the nation’s energy needs. The practical implication is to test this proposition against current local evidence before applying it as policy.

The earlier article also highlighted a continuing consideration: For decades, Afghanistan’s secure power supply has been disrupted by conflicts. As a result, the country’s energy generation, transmission, and distribution infrastructure were demolished. Whatever remained, has been stretched far beyond capacity, limiting residents the access to power and light. The practical implication is to test this proposition against current local evidence before applying it as policy.

Comprendre l'enjeu et les données probantes

Solar power and resource assessment

Solar irradiance is strong in many parts of Afghanistan, but site choice also depends on land, grid proximity, dust, security, seasonal demand and system losses. A bankable study must use site-specific generation estimates.

Avant de fixer un objectif en matière d'énergie solaire et d'évaluation des ressources, l'équipe responsable doit définir la population ou l'actif couvert, l'état actuel et la source de ses informations de référence. Une référence utile consigne à la fois ce qui est connu et ce qui reste incertain. Dans l'évaluation d'un projet, cela évite qu'un récit plausible ne soit pris pour une preuve de la demande ou de l'impact.

Wind and hydropower options

Wind opportunities are geographically concentrated, while hydropower depends on river flows, climate variability and downstream users. Resource maps should guide surveys, not replace engineering or environmental assessment.

The practical test for wind and hydropower options is whether two independent reviewers would reach a similar conclusion using the same records. Specify the definition of success, the relevant technical standard and the point at which a design needs reconsideration. Document exceptions openly rather than averaging away difficult cases.

Choix de conception et mise en œuvre technique

Mini-grids and distributed access

Remote settlements may benefit from solar-battery mini-grids where grid extension is costly. Tariff design, productive demand, ownership and repair capacity determine whether service continues after installation.

Considérons un projet pilote hypothétique axé sur les mini-réseaux et l'accès décentralisé. L'équipe de mise en œuvre doit commencer par un cas d'utilisation strictement défini, le tester dans des conditions d'exploitation normales et enregistrer l'expérience utilisateur ainsi que les performances techniques. L'approvisionnement doit permettre la correction des défauts de conception avant un déploiement à grande échelle.

Grid reliability and imports

Domestic generation and cross-border supply can complement each other. Planning should consider network losses, transmission constraints, seasonal demand and the financial health of electricity institutions.

La préparation opérationnelle pour la fiabilité du réseau et les importations comprend un personnel formé, un budget de maintenance, des données fiables et un canal de réclamation. Si l'un de ces éléments fait défaut, le projet peut atteindre son jalon de construction ou d'installation tout en ne parvenant pas à fournir le service prévu. Les critères d'acceptation doivent par conséquent inclure les performances observées et non pas seulement la livraison des équipements.

Financement, passation des marchés et gouvernance

Project finance and bankability

Investors need clear land rights, payment security, realistic tariffs, procurement rules and dispute resolution. Feasibility models should stress-test currency, demand, equipment replacement and operating costs.

For project finance and bankability, a business case should distinguish initial investment from recurring costs. Compare alternatives on a common time horizon, including training, replacement, supervision and the cost of service interruptions. The cheapest compliant tender may not provide the lowest whole-life cost.

Storage and system integration

Batteries can support evening demand and stabilise smaller systems but add capital and replacement costs. Dispatch planning and appropriate protection systems are essential.

Governance of storage and system integration should clarify who approves changes, who holds the supplier accountable and who pays when assumptions prove wrong. A decision log helps explain trade-offs to auditors and affected communities. Material changes should be reflected in the budget, schedule and risk register before approval.

Contrôle de la décision : L'équipe a-t-elle comparé un scénario sans intervention, un pilote limité et une intervention à grande échelle selon les mêmes critères de coût, de risque et de résultat ? Consignez les hypothèses qui sous-tendent chaque option et la raison du choix retenu.

Mise en œuvre, sauvegardes et mesure

Community benefits and inclusion

Electricity can support irrigation, clinics, cold chains and small businesses when appliances and finance are available. Consultation should identify affordability constraints and who may be excluded.

A practical control for community benefits and inclusion is to assign an owner, a reporting interval and an action threshold. Monitoring is useful only when findings lead to a decision: investigate, correct, redesign or stop. The threshold should be established before the data are reviewed to reduce pressure to declare success.

Gestion environnementale et sociale

Solar farms, hydro schemes and transmission lines have land and ecological impacts. Screening, consultation and grievance procedures should be proportionate to the project risks.

Evaluation of environmental and social management should look for unintended effects as well as intended benefits. Record who gains access, who bears costs and whether outcomes differ across locations or user groups. When attribution is uncertain, describe the limitations instead of presenting a correlation as proof of impact.

Exercice pratique : Remettez à une équipe pluridisciplinaire la situation de référence, le budget et deux conceptions alternatives. Demandez-lui de préparer une note de décision d'une page indiquant la principale incertitude, trois risques de mise en œuvre, les éléments probants requis pour l'approbation et le déclencheur d'une action corrective.

Application aux organismes publics et aux projets financés par les bailleurs

Monitoring service quality

Installed megawatts do not show whether households receive dependable power. Track hours of service, outages, collection rates, productive use and maintenance response.

A ministry or project implementation unit addressing monitoring service quality can start with a short diagnostic: map mandates, list approvals, identify missing skills and test whether the proposed intervention fits existing operating arrangements. The result should be a prioritised workplan with named owners, deadlines and verifiable deliverables.

Development programme priorities

Public agencies and donor partners can support feasibility studies, grid planning, transparent procurement, workforce training and performance-based maintenance. Start with a small portfolio of credible projects rather than speculative capacity totals.

In donor-financed work, development programme priorities should be reflected in procurement specifications, financial planning, stakeholder engagement and reporting where relevant. The financing agreement and applicable national law determine the actual obligations. Teams should verify those instruments rather than assume a single donor procedure applies everywhere.

30 premiers jours : Vérifiez la situation de référence et consultez les usagers ou opérateurs concernés. Examinez les quatre premières questions de ce guide au regard des données locales disponibles. Dressez une courte liste des lacunes en matière de données et des décisions qui ne peuvent être reportées sans risque.

Jours 31 à 60 : Testez une intervention réalisable, affinez la spécification technique et confirmez le financement sur l'ensemble du cycle de vie. Convenez des responsabilités entre les responsables des politiques, les agences d'exécution, les fournisseurs et les organes de contrôle. Publiez un registre des risques et un plan de suivi qui puissent être tenus avec les capacités existantes.

Jours 61 à 90 : Examinez les premiers résultats avec les usagers et des spécialistes indépendants, corrigez les hypothèses fragiles et décidez d'étendre, de reconcevoir ou d'arrêter l'intervention. Intégrez les enseignements dans les modèles de passation des marchés et les procédures opérationnelles afin que le projet suivant ne répète pas des erreurs évitables.

For a field review of community benefits and inclusion, collect the relevant operating records and speak separately with service users, front-line personnel and the budget holder. Compare their descriptions of the problem and record where they disagree. A discrepancy can indicate a missing measurement, an incentive problem or a genuine difference in experience. A pilot should be designed to resolve that specific uncertainty before public funds are committed to expansion.

For a field review of environmental and social management, collect the relevant operating records and speak separately with service users, front-line personnel and the budget holder. Compare their descriptions of the problem and record where they disagree. A discrepancy can indicate a missing measurement, an incentive problem or a genuine difference in experience. A pilot should be designed to resolve that specific uncertainty before public funds are committed to expansion.

Risalat accompagne les institutions par des évaluations diagnostiques, une formation appliquée et des services de conseil. Les équipes peuvent commencer par l'évaluation des capacités institutionnelles, explorer le Centre de diagnostic et demander une proposition sur mesure lorsqu'un soutien extérieur se justifie.

Données probantes et lectures complémentaires : Les sources primaires suivantes ont éclairé cette mise à jour. Les lecteurs sont invités à consulter les publications d'origine pour leur champ, leurs dates et leurs limites méthodologiques.


Questions fréquentes

What should institutions check about solar power and resource assessment?

Solar irradiance is strong in many parts of Afghanistan, but site choice also depends on land, grid proximity, dust, security, seasonal demand and system losses. A bankable study must use site-specific generation estimates. Check the local baseline, technical requirements and responsibilities before scaling a proposed solution.

Que doivent vérifier les institutions concernant les mini-réseaux et l'accès décentralisé ?

Remote settlements may benefit from solar-battery mini-grids where grid extension is costly. Tariff design, productive demand, ownership and repair capacity determine whether service continues after installation. Check the local baseline, technical requirements and responsibilities before scaling a proposed solution.

What should institutions check about project finance and bankability?

Investors need clear land rights, payment security, realistic tariffs, procurement rules and dispute resolution. Feasibility models should stress-test currency, demand, equipment replacement and operating costs. Check the local baseline, technical requirements and responsibilities before scaling a proposed solution.

What should institutions check about community benefits and inclusion?

L'électricité peut soutenir l'irrigation, les cliniques, la chaîne du froid et les petites entreprises lorsque les équipements et le financement sont disponibles. La consultation doit identifier les contraintes d'affordabilité et les personnes susceptibles d'être exclues. Vérifiez la situation de référence locale, les exigences techniques et les responsabilités avant de déployer une solution proposée.

What should institutions check about monitoring service quality?

Installed megawatts do not show whether households receive dependable power. Track hours of service, outages, collection rates, productive use and maintenance response. Check the local baseline, technical requirements and responsibilities before scaling a proposed solution.

Regarder

Partager avec votre équipe

Know people who should read this? Become an Ambassador or write with Risalat.

Risalat Consultants International

Partenaires de la réussite des projets depuis 2011 : diagnostics, conseil et apprentissage appliqué pour les ministères, les organismes publics et les équipes de projet.

Besoin d'aide pour passer à la pratique ?

Commencez par un diagnostic gratuit de 10 minutes ou échangez avec nos experts.

Poursuivre la lecture