Datos clave
- Fechas
- 12–15 abr 2027 (4 días)
- Dónde
- Almaty, Kazajistán
- Tarifa por participante
- 2.200 £ (GBP)
- Pago
- Mediante factura y transferencia bancaria
- Cierre de inscripciones
- 13 Mar 2027
- Certificado
- Certificado de finalización
- Opción interna
- Impártalo para su equipo, en sus fechas
En esta página 14 secciones
Descripción del programa
This intensive four-day professional training programme addresses the critical nexus between early childhood physical environments and preventative health delivery. Participants examine engineering standards, architectural models, and institutional workflows required to design and manage preschool physical infrastructure. The curriculum emphasises child-centred spatial planning, inclusive access, and the integration of dedicated maternal-child health screening facilities within early learning environments. Technical sessions provide public sector professionals with actionable methodologies to align capital investments with international quality standards, ensuring resilient and safe spaces for young learners.
Delivered in Almaty, the course provides a practical platform for specialists to master cross-sectoral coordination between educational bodies and public health authorities. Participants analyse operational arrangements necessary to embed routine nutritional monitoring, growth tracking, and preventative healthcare directly into daily preschool management. Through detailed reviews of procurement frameworks, site supervision protocols, and facility maintenance strategies, delegates learn to mitigate common implementation risks encountered in large-scale social infrastructure developments, modernising early years provision across Central Asia.
By bridging the gap between educational infrastructure engineering and primary healthcare operations, this course equips public sector teams to manage multidisciplinary development schemes. Attendees explore statutory compliance, environmental health considerations, child safeguarding in infrastructure design, and the deployment of community-level referral mechanisms. The training incorporates practical design exercises and workflow mapping sessions that prepare project implementation units to deliver high-quality, durable early childhood facilities that support holistic child development outcomes.
Governments across Central Asia are rapidly scaling up investments in early years human capital, shifting from fragmented interventions to integrated service delivery models. This strategic transition directly aligns with the infrastructure and service delivery mandate of the US$73m Early Childhood Development to Build Tajikistan's Human Capital Project, which requires modern, energy-efficient preschools equipped with maternal and child health points. Public sector agencies need immediate, consolidated technical capacity to coordinate civil works, establish joint health-education operating procedures, and execute capital projects that meet stringent international development bank standards.
Delivered by Risalat Consultants International in Almaty, Kazakhstan, it combines expert-led sessions, real cases and group work, so that participants can apply what they learn in their own institution.
The Programme Strengthens Institutional Capability
- Principles of child-centred architecture, universal design, and accessibility for early childhood centres
- Spatial programming: Integrating early learning classrooms with maternal-child health screening units
- Water, Sanitation, and Hygiene (WASH) technical specifications tailored for early childhood cohorts
- Indoor environmental quality: Thermal comfort, natural ventilation, acoustic controls, and non-toxic materials
- Practical design clinic: Reviewing and rectifying baseline architectural layouts for multi-use centres
- Procurement fundamentals for social infrastructure under multilateral development bank guidelines
- Site selection criteria: Geological risks, environmental screening, accessibility, and community reach
- Construction supervision protocols, site safety records, and quality control of structural materials
- Planificación y priorización de infraestructuras
- Evaluación de proyectos y casos de negocio
- Opciones de financiación y asociaciones público-privadas
- Contratación de obras
It is designed for ministry of Education and Science project engineers and technical supervisors, early childhood education specialists and pedagogical advisors, ministry of Health maternal and child healthcare coordinators and others who want practical, current skills in infrastructure, urban development and partnerships.
The Growing Importance of Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty
- Principles of child-centred architecture, universal design, and accessibility for early childhood centres
- Spatial programming: Integrating early learning classrooms with maternal-child health screening units
- Water, Sanitation, and Hygiene (WASH) technical specifications tailored for early childhood cohorts
- Indoor environmental quality: Thermal comfort, natural ventilation, acoustic controls, and non-toxic materials
- Practical design clinic: Reviewing and rectifying baseline architectural layouts for multi-use centres
- Procurement fundamentals for social infrastructure under multilateral development bank guidelines
- Site selection criteria: Geological risks, environmental screening, accessibility, and community reach
- Construction supervision protocols, site safety records, and quality control of structural materials
- Child safeguarding protocols and labour management standards on social sector construction sites
- Developing defect liability inspection routines and commissioning protocols for integrated preschools
- Designing infrastructure for nutrition: Kitchen ergonomics, cold chains, safe food storage, and clean preparation
- Formulating joint operational procedures between preschool staff and community primary health posts
- Protocols for regular growth monitoring, micronutrient distribution, and early developmental screening
- Infection prevention and control (IPC) standards within communal preschool dining and screening spaces
- Workflow mapping: Establishing standard referral pathways for acute malnutrition and developmental delays
- Institutional governance models for shared education-health facilities: Roles, mandates, and accountability
- Preventative maintenance planning: Developing operations manuals, asset registers, and repair schedules
- Budget formulation for facility upkeep, utility resilience, and continuous supply of clinical consumables
- Community engagement, parent-teacher-health committees, and local oversight of preschool health standards
- Action planning: Finalising institutional implementation blueprints for cross-sectoral facility management
La infraestructura y los servicios urbanos determinan el crecimiento, la salud y las oportunidades. Los proyectos son grandes, complejos y de larga duración, y las deficiencias en la planificación, la financiación o la ejecución resultan costosas de corregir después.
Los gobiernos combinan cada vez más la inversión pública, las asociaciones con el sector privado y las nuevas tecnologías. Los equipos capaces de planificar, evaluar, contratar y gestionar estas inversiones obtienen mejores activos y servicios.
Las organizaciones necesitan cada vez más profesionales capaces de:
- Planificar y priorizar las inversiones en infraestructura
- Evaluar proyectos y preparar casos de negocio
- Elegir modelos de financiación y de ejecución
- Supervisar las obras en cuanto a plazos, costes y calidad
- Gestionar los activos a lo largo de su vida útil
Unos sistemas sólidos de infraestructura, desarrollo urbano y alianzas ayudan a las organizaciones a:
- Seleccionar las inversiones adecuadas
- Ejecutar los proyectos en plazo y dentro del presupuesto
- Atraer financiación y socios
- Prolongar la vida útil de los activos
This Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty programme brings these elements together in a practical format, so that participants understand not only what good practice looks like but also how to introduce it in their own setting, with the people and resources they have.
Who Should Attend This Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Training?
Este programa está dirigido a:
- Ministry of Education and Science project engineers and technical supervisors
- Early childhood education specialists and pedagogical advisors
- Ministry of Health maternal and child healthcare coordinators
- Project Implementation Unit (PIU) infrastructure and civil works specialists
- Municipal and district education department capital works planners
- Public sector procurement officers handling social infrastructure contracts
- Primary health care administrators liaising with community preschool networks
- Quality assurance officers and building inspectors for public educational facilities
- Donor-financed project officers managing early childhood development portfolios
- Planificadores urbanos y de infraestructuras
- Ingenieros y responsables técnicos
- Gerentes de proyectos y programas
El programa es adecuado tanto para profesionales con experiencia como para quienes asumen nuevas responsabilidades. Se fomentan los grupos que mezclan instituciones y países, porque los participantes aprenden mucho de la experiencia de los demás.
Marque lo que su equipo necesita ser capaz de hacer.
Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Training Objectives
Upon successful completion of this Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Training, participants will be able to:
- Plan inclusive and climate-resilient preschool infrastructure in accordance with international child-safety guidelines and universal design principles
- Design integrated layout plans that combine early learning classrooms with dedicated maternal-child health screening and growth monitoring rooms
- Supervise civil works and contractor compliance using structured site inspection checklists, quality assurance protocols, and environmental standards
- Formulate cross-sectoral operational routines connecting preschool administrations with local primary healthcare centres and community health posts
- Establish institutional guidelines for hygiene, potable water supply, sanitation, and child food safety within early childhood centres
- Apply international social and environmental risk management standards during the site selection, design, and construction phases
- Structure ongoing operations and maintenance budgets to guarantee the structural integrity, safety, and operational longevity of integrated preschool facilities
- Explicar cómo se planifica y prioriza la infraestructura
- Evaluar proyectos y preparar un caso de negocio
- Comparar modelos de financiación y de ejecución, incluidas las alianzas
Cada objetivo se practica durante el programa mediante ejercicios, casos o trabajo en grupo, de modo que los participantes salgan siendo capaces de hacerlo, no solo de describirlo.
Contenido y estructura del programa
El programa dura 4 días. Cada jornada combina aportaciones de expertos, trabajo práctico y un taller o estudio de caso final:
- First Day: Child-Centred Architectural Planning and Integrated Facility Design
- Second Day: Civil Works Supervision, Safety Compliance, and Procurement
- Third Day: Early Child Nutrition and Integrated Health Operational Routines
- Fourth Day: Cross-Sectoral Governance, Maintenance, and Sustainability
Contenido completo día a día
First Day | Child-Centred Architectural Planning and Integrated Facility Design
- Principles of child-centred architecture, universal design, and accessibility for early childhood centres
- Spatial programming: Integrating early learning classrooms with maternal-child health screening units
- Water, Sanitation, and Hygiene (WASH) technical specifications tailored for early childhood cohorts
- Indoor environmental quality: Thermal comfort, natural ventilation, acoustic controls, and non-toxic materials
- Practical design clinic: Reviewing and rectifying baseline architectural layouts for multi-use centres
Workshop: Child-Centred Architectural Planning and Integrated Facility Design: Applying It to Your Institution
Trabajando en grupos pequeños, los participantes aplican los métodos del día a ejemplos de sus propias instituciones y acuerdan los siguientes pasos prácticos.
Second Day | Civil Works Supervision, Safety Compliance, and Procurement
- Procurement fundamentals for social infrastructure under multilateral development bank guidelines
- Site selection criteria: Geological risks, environmental screening, accessibility, and community reach
- Construction supervision protocols, site safety records, and quality control of structural materials
- Child safeguarding protocols and labour management standards on social sector construction sites
- Developing defect liability inspection routines and commissioning protocols for integrated preschools
Workshop: Civil Works Supervision, Safety Compliance, and Procurement: Applying It to Your Institution
Trabajando en grupos pequeños, los participantes aplican los métodos del día a ejemplos de sus propias instituciones y acuerdan los siguientes pasos prácticos.
Third Day | Early Child Nutrition and Integrated Health Operational Routines
- Designing infrastructure for nutrition: Kitchen ergonomics, cold chains, safe food storage, and clean preparation
- Formulating joint operational procedures between preschool staff and community primary health posts
- Protocols for regular growth monitoring, micronutrient distribution, and early developmental screening
- Infection prevention and control (IPC) standards within communal preschool dining and screening spaces
- Workflow mapping: Establishing standard referral pathways for acute malnutrition and developmental delays
Case Study: Early Child Nutrition and Integrated Health Operational Routines in Practice
Los participantes analizan un caso realista, comparan las decisiones tomadas con las buenas prácticas y extraen lecciones que pueden aplicar en su propio contexto.
Fourth Day | Cross-Sectoral Governance, Maintenance, and Sustainability
- Institutional governance models for shared education-health facilities: Roles, mandates, and accountability
- Preventative maintenance planning: Developing operations manuals, asset registers, and repair schedules
- Budget formulation for facility upkeep, utility resilience, and continuous supply of clinical consumables
- Community engagement, parent-teacher-health committees, and local oversight of preschool health standards
- Action planning: Finalising institutional implementation blueprints for cross-sectoral facility management
Capstone Exercise: Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Action Plan for Your Institution
Los participantes integran lo aprendido durante la semana en un plan de acción para su propia institución, con prioridades, responsables y primeros pasos, y lo presentan para recibir comentarios de sus pares y de los facilitadores.
Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Training Methodology
The training employs an applied, hands-on learning methodology tailored to civil servants and technical specialists. Delivery combines interactive expert presentations with practical engineering reviews, real-world case analysis from Central Asian public infrastructure projects, and technical studio exercises. Participants work in cross-disciplinary groups to audit architectural blueprints, draft joint institutional protocols, and simulate site inspection tasks, ensuring direct applicability to ongoing donor-funded investment programmes.
El programa combina:
- Sesiones dirigidas por expertos sobre la práctica actual
- Estudios de caso regionales e internacionales
- Trabajo en grupo y ejercicios prácticos
- Simulaciones y juegos de rol cuando proceda
- Análisis de los desafíos propios de los participantes
- Aprendizaje entre pares de distintas instituciones y países
- Herramientas y plantillas prácticas para llevar al trabajo
- Reflexión diaria y planificación de acciones
Antes del programa, una breve evaluación previa ayuda a los facilitadores a comprender la función y las prioridades de cada participante, para adaptar los ejemplos y ejercicios al grupo. Cada jornada termina con una breve reflexión en la que los participantes anotan lo que aplicarán en su trabajo.
Resultados esperados
Upon completion of this Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Training, participants will be able to:
- Produce integrated preliminary site and layout plans that incorporate education spaces and maternal-child health consultation rooms
- Apply standardised site supervision checklists to monitor contractor compliance with international child-safety benchmarks
- Execute cross-sectoral standard operating procedures connecting preschool service delivery to primary healthcare networks
- Establish compliant nutritional hygiene and food handling monitoring routines within community early learning facilities
- Draft comprehensive facility operations and preventative maintenance plans complete with resource allocation schedules
- Implement environmental and social risk mitigation measures across all stages of the infrastructure project lifecycle
- Planificar y priorizar las inversiones en infraestructura
- Evaluar proyectos y preparar casos de negocio
Los participantes se marchan con un plan de acción personal y herramientas prácticas que pueden utilizar en su institución desde la primera semana de regreso. Las instituciones que envían a varios participantes pueden aprovechar el programa para acordar métodos y plantillas comunes entre equipos, lo que facilita mantener las mejoras.
2.200 £ por participante · factura y transferencia bancaria · descuento para grupos de 5 o más personas
Cinco o más personas de una misma organización: solicite la tarifa de grupo al pedir la factura.
Diez o más: una versión interna para su institución puede costar menos por persona. Solicite un presupuesto para una formación interna.
Registration closes in 120 days (13 Mar 2027)
Institutional Application of Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Training
Este programa ayuda a las organizaciones a fortalecer:
- Planificación de inversiones
- Evaluación de proyectos
- Gestión de alianzas
- Supervisión de obras
- Gestión de activos
Los participantes regresan con herramientas prácticas para mejorar:
- Casos de negocio
- Asignación de riesgos
- Gestión de contratos
- Planificación del mantenimiento
- Seguimiento de los servicios
El programa está concebido para que el aprendizaje pase del aula a la institución. Siempre que es posible, los participantes trabajan con sus propios procesos y documentos, y se marchan con un plan de acción que sus responsables pueden revisar y respaldar.
Pertinencia y aplicación regionales
Europa
Las instituciones europeas aplican la infraestructura, el desarrollo urbano y las alianzas dentro de marcos normativos detallados y agendas de reforma. Los participantes de Europa pueden comparar su práctica con la de colegas de otras regiones y comprobar cómo funcionan los métodos consolidados en condiciones diferentes.
África
En toda África, los ministerios, organismos y equipos de proyecto que trabajan en infraestructura, desarrollo urbano y alianzas operan cada vez más junto a programas financiados por donantes que esperan sistemas y evidencias claros. El programa ayuda a los participantes a adaptar las buenas prácticas a las instituciones y los recursos con los que trabajan.
Oriente Medio
En Oriente Medio, las estrategias nacionales de desarrollo y los planes de diversificación plantean exigencias crecientes en materia de infraestructura, desarrollo urbano y alianzas. Los participantes analizan cómo desarrollar dentro de los organismos públicos y las empresas las capacidades que requieren estos planes.
Asia
Las instituciones de toda Asia combinan un rápido crecimiento con ambiciosos programas de modernización. Los participantes de Asia pueden compartir su experiencia en el escalamiento rápido de sistemas y conocer los enfoques utilizados en otros lugares.
Pacífico
Los pequeños Estados insulares y del Pacífico afrontan limitaciones particulares de tamaño, distancia y capacidad. El programa destaca enfoques prácticos y proporcionados de infraestructura, desarrollo urbano y alianzas adaptados a instituciones más pequeñas.
Holding the programme in Almaty, Kazakhstan brings participants together away from their daily pressures, so they can compare how infrastructure, urban development and partnerships is handled in different settings. The same programme can also be delivered in-house for one institution, in its own country or online, with cases taken from its current work.
Perfil del país anfitrión: Kazajistán
Programas, talleres, visitas técnicas y cursos de formación en Almaty, Kazajistán, de Risalat Consultants International
Estudiar fuera de su país ofrece a los participantes tiempo para concentrarse, una mirada nueva sobre su propia institución y la oportunidad de crear una red con colegas de otros países.
Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Training Deliverables
Los participantes reciben apoyo antes, durante y después del programa, de modo que la preparación, el aprendizaje y el seguimiento formen una experiencia continua.
Antes del programa
- Evaluación previa del participante
- Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Readiness Assessment
- Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Resource Pack
- Materiales de lectura preparatoria
- Apoyo y asesoramiento gratuitos para el visado
Durante el programa
- Recogida en el aeropuerto y asistencia de bienvenida
- Alojamiento con desayuno
- Cena de bienvenida y networking
- Kit de formación de Risalat (bolsa, botella, taza, camiseta, gorra, funda de pasaporte, bolígrafos, cuaderno, imán y llavero)
- Comprehensive Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Training Manual
- Plantilla de evaluación de proyectos
- Matriz de asignación de riesgos de APP
- Lista de verificación para la supervisión de obras
- Plantilla de plan de gestión de activos
- Talleres prácticos y simulaciones
- Debates en grupo y aprendizaje entre pares
- Almuerzo y refrigerios diarios
- Acceso completo a las instalaciones de la sede de formación
- Mini Pad / tableta con materiales didácticos digitales
- Visita de campo (cuando proceda)
- Recorrido turístico por la ciudad
Después del programa
- Certificado de finalización
- Reconocimiento a la participación en programas de Risalat
- Materiales de consulta posteriores a la formación
- Lista de verificación para la revisión del caso de negocio
- Plantilla de plan de mantenimiento
- Apoyo posterior a la formación y orientación de seguimiento
- Informe del programa
Las instituciones también pueden solicitar una versión interna de este programa adaptada a sus necesidades, impartida en sus instalaciones o en línea. Solicitar una propuesta.
Common Challenges in Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty, And How This Training Helps
¿Cómo pueden las instituciones planificar y priorizar las inversiones en infraestructura?
The programme addresses this directly on the first day (Child-Centred Architectural Planning and Integrated Facility Design), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
¿Cómo pueden las instituciones evaluar proyectos y preparar su justificación económica?
The programme addresses this directly on the second day (Civil Works Supervision, Safety Compliance, and Procurement), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
¿Cómo pueden las instituciones elegir los modelos de financiación y ejecución?
The programme addresses this directly on the third day (Early Child Nutrition and Integrated Health Operational Routines), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
¿Cómo pueden las instituciones supervisar las obras en cuanto a plazos, costes y calidad?
The programme addresses this directly on the fourth day (Cross-Sectoral Governance, Maintenance, and Sustainability), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
¿Cómo pueden las instituciones gestionar los activos a lo largo de su vida útil?
The programme addresses this directly on the first day (Child-Centred Architectural Planning and Integrated Facility Design), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
Preguntas frecuentes
When and where does the Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty programme take place?
It runs from 12 Apr 2027 to 15 Apr 2027, in Almaty, Kazakhstan. The registration deadline is shown at the top of this page.
¿Quién debería asistir?
The programme is designed for ministry of Education and Science project engineers and technical supervisors, early childhood education specialists and pedagogical advisors, ministry of Health maternal and child healthcare coordinators, project Implementation Unit (PIU) infrastructure and civil works specialists, and others who want practical skills in infrastructure, urban development and partnerships.
¿Recibiré un certificado?
Sí. Los participantes que completan el programa reciben un Certificado de finalización de Risalat Consultants International.
¿Puede impartirse este programa solo para nuestra institución?
Sí. Podemos impartir una versión interna a medida en sus instalaciones, en otra ciudad o en línea, construida en torno a sus propios casos. Utilice la solicitud de propuesta de esta página.
¿Necesito experiencia previa en infraestructura, desarrollo urbano y alianzas?
No se requiere formación especializada más allá de la experiencia en un puesto afín. Una breve evaluación previa ayuda a los facilitadores a adaptar las sesiones al grupo.
Who Will Deliver This Programme
Each date is delivered by a team assigned from Risalat's expert network for this subject. For this programme we assign:
How we choose them: Experience in the region of the participants or comparable settings; Command of the financier rules that apply (World Bank, ADB, AfDB, EU, UN) where relevant; Delivery in English; other languages on request for in-house groups; No conflict of interest with participants' institutions.
Names and short CVs of the assigned experts are shared with registered participants and sponsoring organisations before the programme, on request. Are you an expert in this subject? Join our expert network.
Training courses in AlmatyEducation training courses
Por qué Almaty para este programa
Almaty es un nodo práctico para las delegaciones de Asia Central, con buenas sedes y una buena relación calidad-precio.
The Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty programme in April 2027 brings together officials and professionals from across the Central Asia region and beyond. Sessions combine short inputs, case studies and group work on participants' own files, and the city's institutions can be added as a study visit on request.
Cómo llegar: Aeropuerto Internacional de Almaty (ALA).
Compruebe si necesita visado con el Verificador de visados gratuito y solicite una carta de invitación una vez inscrito.
El mismo tema en otras ciudades
- Inclusive Education and Early Learning Quality Standards in Prague (Prague)
- Early Childhood Education Quality Assurance & Teacher Mentoring in Kuala Lumpur (Kuala Lumpur)
Otros programas en Almaty
- Resilient School Construction and Seismic Retrofitting Supervision in Almaty
- Power Transmission Asset Reliability and SCADA Modernisation in Almaty
- Apprenticeship Systems and Work-Based Learning Frameworks in Almaty
- TVET Curriculum Development and Industry Alignment in Almaty
- Agribusiness Value Chain Aggregation and Post-Harvest Logistics in Almaty
- Marco y Regulaciones de Adquisiciones para Proyectos Banco Mundial
- MAPS: Metodología para la Evaluación de los Sistemas de Adquisiciones Iniciativa MAPS
- Open Contracting Partnership Open Contracting Partnership
For teams and institutions
Bring your team
Teams that learn together apply more at work. Tell us how many people and how you would like to take part: we reply with a group quote within two working days.
Other dates and cities for this subject: Infrastructure, Roads and Transport Projects training courses (161 upcoming dates).
Más cursos de formación en Kazajistán · Todos los programas en Asia · Calendario de formación completo
Plan this programme in a roadmap: why it matters, why to approve it, the dates to plan and the career it builds.



