Points clés
- Dates
- 12–15 avr. 2027 (4 jours)
- Lieu
- Almaty, Kazakhstan
- Frais par participant
- 2 200 £ (GBP)
- Paiement
- Sur facture et par virement bancaire
- Clôture des inscriptions
- 13 Mar 2027
- Certificat
- Certificat de participation
- Option intra
- Organisez-le pour votre équipe, à vos dates
Sur cette page 14 sections
Présentation du programme
This intensive four-day professional training programme addresses the critical nexus between early childhood physical environments and preventative health delivery. Participants examine engineering standards, architectural models, and institutional workflows required to design and manage preschool physical infrastructure. The curriculum emphasises child-centred spatial planning, inclusive access, and the integration of dedicated maternal-child health screening facilities within early learning environments. Technical sessions provide public sector professionals with actionable methodologies to align capital investments with international quality standards, ensuring resilient and safe spaces for young learners.
Delivered in Almaty, the course provides a practical platform for specialists to master cross-sectoral coordination between educational bodies and public health authorities. Participants analyse operational arrangements necessary to embed routine nutritional monitoring, growth tracking, and preventative healthcare directly into daily preschool management. Through detailed reviews of procurement frameworks, site supervision protocols, and facility maintenance strategies, delegates learn to mitigate common implementation risks encountered in large-scale social infrastructure developments, modernising early years provision across Central Asia.
By bridging the gap between educational infrastructure engineering and primary healthcare operations, this course equips public sector teams to manage multidisciplinary development schemes. Attendees explore statutory compliance, environmental health considerations, child safeguarding in infrastructure design, and the deployment of community-level referral mechanisms. The training incorporates practical design exercises and workflow mapping sessions that prepare project implementation units to deliver high-quality, durable early childhood facilities that support holistic child development outcomes.
Governments across Central Asia are rapidly scaling up investments in early years human capital, shifting from fragmented interventions to integrated service delivery models. This strategic transition directly aligns with the infrastructure and service delivery mandate of the US$73m Early Childhood Development to Build Tajikistan's Human Capital Project, which requires modern, energy-efficient preschools equipped with maternal and child health points. Public sector agencies need immediate, consolidated technical capacity to coordinate civil works, establish joint health-education operating procedures, and execute capital projects that meet stringent international development bank standards.
Delivered by Risalat Consultants International in Almaty, Kazakhstan, it combines expert-led sessions, real cases and group work, so that participants can apply what they learn in their own institution.
The Programme Strengthens Institutional Capability
- Principles of child-centred architecture, universal design, and accessibility for early childhood centres
- Spatial programming: Integrating early learning classrooms with maternal-child health screening units
- Water, Sanitation, and Hygiene (WASH) technical specifications tailored for early childhood cohorts
- Indoor environmental quality: Thermal comfort, natural ventilation, acoustic controls, and non-toxic materials
- Practical design clinic: Reviewing and rectifying baseline architectural layouts for multi-use centres
- Procurement fundamentals for social infrastructure under multilateral development bank guidelines
- Site selection criteria: Geological risks, environmental screening, accessibility, and community reach
- Construction supervision protocols, site safety records, and quality control of structural materials
- Planification et priorisation des infrastructures
- Évaluation ex ante des projets et études de rentabilité
- Options de financement et partenariats public-privé
- Passation des marchés et contrats de travaux
It is designed for ministry of Education and Science project engineers and technical supervisors, early childhood education specialists and pedagogical advisors, ministry of Health maternal and child healthcare coordinators and others who want practical, current skills in infrastructure, urban development and partnerships.
The Growing Importance of Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty
- Principles of child-centred architecture, universal design, and accessibility for early childhood centres
- Spatial programming: Integrating early learning classrooms with maternal-child health screening units
- Water, Sanitation, and Hygiene (WASH) technical specifications tailored for early childhood cohorts
- Indoor environmental quality: Thermal comfort, natural ventilation, acoustic controls, and non-toxic materials
- Practical design clinic: Reviewing and rectifying baseline architectural layouts for multi-use centres
- Procurement fundamentals for social infrastructure under multilateral development bank guidelines
- Site selection criteria: Geological risks, environmental screening, accessibility, and community reach
- Construction supervision protocols, site safety records, and quality control of structural materials
- Child safeguarding protocols and labour management standards on social sector construction sites
- Developing defect liability inspection routines and commissioning protocols for integrated preschools
- Designing infrastructure for nutrition: Kitchen ergonomics, cold chains, safe food storage, and clean preparation
- Formulating joint operational procedures between preschool staff and community primary health posts
- Protocols for regular growth monitoring, micronutrient distribution, and early developmental screening
- Infection prevention and control (IPC) standards within communal preschool dining and screening spaces
- Workflow mapping: Establishing standard referral pathways for acute malnutrition and developmental delays
- Institutional governance models for shared education-health facilities: Roles, mandates, and accountability
- Preventative maintenance planning: Developing operations manuals, asset registers, and repair schedules
- Budget formulation for facility upkeep, utility resilience, and continuous supply of clinical consumables
- Community engagement, parent-teacher-health committees, and local oversight of preschool health standards
- Action planning: Finalising institutional implementation blueprints for cross-sectoral facility management
Les infrastructures et les services urbains façonnent la croissance, la santé et les perspectives. Les projets sont vastes, complexes et durables, et les faiblesses de planification, de financement ou de réalisation coûtent cher à corriger par la suite.
Les gouvernements combinent de plus en plus investissement public, partenariats avec le secteur privé et nouvelles technologies. Les équipes capables de planifier, d'évaluer, d'acheter et de gérer ces investissements obtiennent de meilleurs actifs et services.
Les organisations ont de plus en plus besoin de professionnels capables de :
- Planifier et prioriser les investissements d'infrastructure
- Évaluer les projets et préparer des études de rentabilité
- Choisir les modèles de financement et de réalisation
- Superviser les travaux en matière de délais, de coûts et de qualité
- Gérer les actifs tout au long de leur cycle de vie
Des systèmes solides en matière d'infrastructures, de développement urbain et de partenariats aident les organisations à :
- Choisir les bons investissements
- Livrer les projets dans les délais et le budget
- Attirer des financements et des partenaires
- Prolonger la durée de service des actifs
This Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty programme brings these elements together in a practical format, so that participants understand not only what good practice looks like but also how to introduce it in their own setting, with the people and resources they have.
Who Should Attend This Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Training?
Ce programme s'adresse à :
- Ministry of Education and Science project engineers and technical supervisors
- Early childhood education specialists and pedagogical advisors
- Ministry of Health maternal and child healthcare coordinators
- Project Implementation Unit (PIU) infrastructure and civil works specialists
- Municipal and district education department capital works planners
- Public sector procurement officers handling social infrastructure contracts
- Primary health care administrators liaising with community preschool networks
- Quality assurance officers and building inspectors for public educational facilities
- Donor-financed project officers managing early childhood development portfolios
- Planificateurs d'infrastructures et urbanistes
- Ingénieurs et responsables techniques
- Gestionnaires de projets et de programmes
Le programme convient aussi bien aux professionnels expérimentés qu’à ceux qui prennent de nouvelles responsabilités. Les groupes réunissant plusieurs institutions et pays sont encouragés, car les participants apprennent beaucoup de l’expérience des autres.
Cochez ce que votre équipe doit être capable de faire.
Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Training Objectives
Upon successful completion of this Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Training, participants will be able to:
- Plan inclusive and climate-resilient preschool infrastructure in accordance with international child-safety guidelines and universal design principles
- Design integrated layout plans that combine early learning classrooms with dedicated maternal-child health screening and growth monitoring rooms
- Supervise civil works and contractor compliance using structured site inspection checklists, quality assurance protocols, and environmental standards
- Formulate cross-sectoral operational routines connecting preschool administrations with local primary healthcare centres and community health posts
- Establish institutional guidelines for hygiene, potable water supply, sanitation, and child food safety within early childhood centres
- Apply international social and environmental risk management standards during the site selection, design, and construction phases
- Structure ongoing operations and maintenance budgets to guarantee the structural integrity, safety, and operational longevity of integrated preschool facilities
- Expliquer comment les infrastructures sont planifiées et priorisées
- Évaluer des projets et préparer une étude de rentabilité
- Comparer les modèles de financement et de réalisation, y compris les partenariats
Chaque objectif est mis en pratique pendant le programme à travers des exercices, des études de cas ou des travaux de groupe, afin que les participants repartent capables de le faire, et pas seulement de le décrire.
Contenu et structure du programme
Le programme se déroule sur 4 jours. Chaque journée associe apports d'experts, travaux pratiques et un atelier ou une étude de cas de clôture :
- First Day: Child-Centred Architectural Planning and Integrated Facility Design
- Second Day: Civil Works Supervision, Safety Compliance, and Procurement
- Third Day: Early Child Nutrition and Integrated Health Operational Routines
- Fourth Day: Cross-Sectoral Governance, Maintenance, and Sustainability
Contenu détaillé jour par jour
First Day | Child-Centred Architectural Planning and Integrated Facility Design
- Principles of child-centred architecture, universal design, and accessibility for early childhood centres
- Spatial programming: Integrating early learning classrooms with maternal-child health screening units
- Water, Sanitation, and Hygiene (WASH) technical specifications tailored for early childhood cohorts
- Indoor environmental quality: Thermal comfort, natural ventilation, acoustic controls, and non-toxic materials
- Practical design clinic: Reviewing and rectifying baseline architectural layouts for multi-use centres
Workshop: Child-Centred Architectural Planning and Integrated Facility Design: Applying It to Your Institution
En petits groupes, les participants appliquent les méthodes du jour à des exemples tirés de leurs institutions et conviennent d'étapes concrètes pour la suite.
Second Day | Civil Works Supervision, Safety Compliance, and Procurement
- Procurement fundamentals for social infrastructure under multilateral development bank guidelines
- Site selection criteria: Geological risks, environmental screening, accessibility, and community reach
- Construction supervision protocols, site safety records, and quality control of structural materials
- Child safeguarding protocols and labour management standards on social sector construction sites
- Developing defect liability inspection routines and commissioning protocols for integrated preschools
Workshop: Civil Works Supervision, Safety Compliance, and Procurement: Applying It to Your Institution
En petits groupes, les participants appliquent les méthodes du jour à des exemples tirés de leurs institutions et conviennent d'étapes concrètes pour la suite.
Third Day | Early Child Nutrition and Integrated Health Operational Routines
- Designing infrastructure for nutrition: Kitchen ergonomics, cold chains, safe food storage, and clean preparation
- Formulating joint operational procedures between preschool staff and community primary health posts
- Protocols for regular growth monitoring, micronutrient distribution, and early developmental screening
- Infection prevention and control (IPC) standards within communal preschool dining and screening spaces
- Workflow mapping: Establishing standard referral pathways for acute malnutrition and developmental delays
Case Study: Early Child Nutrition and Integrated Health Operational Routines in Practice
Les participants analysent un cas réaliste, comparent les choix effectués aux bonnes pratiques et en tirent des enseignements applicables à leur propre contexte.
Fourth Day | Cross-Sectoral Governance, Maintenance, and Sustainability
- Institutional governance models for shared education-health facilities: Roles, mandates, and accountability
- Preventative maintenance planning: Developing operations manuals, asset registers, and repair schedules
- Budget formulation for facility upkeep, utility resilience, and continuous supply of clinical consumables
- Community engagement, parent-teacher-health committees, and local oversight of preschool health standards
- Action planning: Finalising institutional implementation blueprints for cross-sectoral facility management
Capstone Exercise: Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Action Plan for Your Institution
Les participants synthétisent la semaine dans un plan d'action pour leur institution, avec des priorités, des responsables et des premières étapes, puis le présentent à leurs pairs et aux animateurs pour recueillir leurs retours.
Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Training Methodology
The training employs an applied, hands-on learning methodology tailored to civil servants and technical specialists. Delivery combines interactive expert presentations with practical engineering reviews, real-world case analysis from Central Asian public infrastructure projects, and technical studio exercises. Participants work in cross-disciplinary groups to audit architectural blueprints, draft joint institutional protocols, and simulate site inspection tasks, ensuring direct applicability to ongoing donor-funded investment programmes.
Le programme associe :
- Sessions animées par des experts sur les pratiques actuelles
- Études de cas régionales et internationales
- Travaux de groupe et exercices pratiques
- Simulations et jeux de rôle le cas échéant
- Discussion des défis rencontrés par les participants dans l'exercice de leurs fonctions
- Apprentissage entre pairs, d'institutions et de pays différents
- Des outils et modèles pratiques à réutiliser au travail
- Réflexion quotidienne et plan d'action
Avant le programme, une courte pré-évaluation aide les animateurs à comprendre le rôle et les priorités de chaque participant, afin d’adapter les exemples et les exercices au groupe. Chaque journée se termine par une brève réflexion au cours de laquelle les participants notent ce qu’ils appliqueront dans leur travail.
Résultats attendus
Upon completion of this Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Training, participants will be able to:
- Produce integrated preliminary site and layout plans that incorporate education spaces and maternal-child health consultation rooms
- Apply standardised site supervision checklists to monitor contractor compliance with international child-safety benchmarks
- Execute cross-sectoral standard operating procedures connecting preschool service delivery to primary healthcare networks
- Establish compliant nutritional hygiene and food handling monitoring routines within community early learning facilities
- Draft comprehensive facility operations and preventative maintenance plans complete with resource allocation schedules
- Implement environmental and social risk mitigation measures across all stages of the infrastructure project lifecycle
- Planifier et prioriser les investissements d'infrastructure
- Évaluer les projets et préparer des études de rentabilité
Les participants repartent avec un plan d'action personnel et des outils pratiques utilisables dans leur institution dès la première semaine de retour. Les institutions qui envoient plusieurs participants peuvent s'appuyer sur le programme pour convenir de méthodes et de modèles communs entre équipes, ce qui facilite la pérennité des améliorations.
2 200 £ par participant · facture et virement bancaire · remise pour les groupes de 5 personnes ou plus
Cinq personnes ou plus d'une même organisation : demandez le tarif de groupe lors de votre demande de facture.
À partir de dix participants, une version intra pour votre institution peut revenir moins cher par personne. Demander un devis intra.
Registration closes in 120 days (13 Mar 2027)
Institutional Application of Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Training
Ce programme aide les organisations à renforcer :
- Planification des investissements
- Évaluation ex ante des projets
- Gestion des partenariats
- Supervision des travaux
- Gestion des actifs
Les participants repartent avec des outils pratiques pour améliorer :
- Études de rentabilité
- Répartition des risques
- Gestion des contrats
- Planification de la maintenance
- Suivi des services
Le programme est conçu pour que l'apprentissage passe de la salle de formation à l'institution. Les participants travaillent, dans la mesure du possible, sur leurs propres processus et documents, et repartent avec un plan d'action que leurs responsables peuvent examiner et soutenir.
Pertinence régionale & mise en application
Europe
Les institutions européennes mettent en œuvre les infrastructures, le développement urbain et les partenariats dans des cadres réglementaires détaillés et des programmes de réforme. Les participants venus d'Europe peuvent comparer leurs pratiques avec celles de collègues d'autres régions et vérifier comment des méthodes éprouvées fonctionnent dans d'autres conditions.
Afrique
Partout en Afrique, les ministères, les agences et les équipes de projet qui travaillent dans les infrastructures, le développement urbain et les partenariats opèrent de plus en plus aux côtés de programmes financés par les bailleurs, qui exigent des systèmes clairs et des éléments probants. Le programme aide les participants à adapter les bonnes pratiques aux institutions et aux ressources avec lesquelles ils travaillent.
Moyen-Orient
Au Moyen-Orient, les stratégies nationales de développement et les plans de diversification imposent des exigences croissantes en matière d'infrastructures, de développement urbain et de partenariats. Les participants examinent comment bâtir, au sein des organismes publics et des entreprises, les capacités dont ces plans ont besoin.
Asie
Les institutions asiatiques conjuguent croissance rapide et programmes de modernisation ambitieux. Les participants venus d'Asie peuvent partager leur expérience du déploiement rapide de systèmes à grande échelle et découvrir les approches adoptées ailleurs.
Pacifique
Les petits États insulaires et du Pacifique sont confrontés à des contraintes particulières de taille, d'éloignement et de capacités. Le programme met en avant des approches pratiques et proportionnées des infrastructures, du développement urbain et des partenariats, adaptées aux institutions de plus petite taille.
Holding the programme in Almaty, Kazakhstan brings participants together away from their daily pressures, so they can compare how infrastructure, urban development and partnerships is handled in different settings. The same programme can also be delivered in-house for one institution, in its own country or online, with cases taken from its current work.
Profil du pays d'accueil – Kazakhstan
Programmes, ateliers, immersions et formations à Almaty, Kazakhstan, par Risalat Consultants International
Se former hors de son pays permet aux participants de se concentrer, de porter un regard neuf sur leur propre institution et de constituer un réseau avec des collègues d'autres pays.
Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Training Deliverables
Les participants sont accompagnés avant, pendant et après le programme, afin que la préparation, l'apprentissage et le suivi forment une expérience continue.
Avant le programme
- Pré-évaluation des participants
- Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Readiness Assessment
- Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Resource Pack
- Lectures préparatoires
- Aide et conseils gratuits pour le visa
Pendant le programme
- Accueil à l'aéroport & assistance à l'arrivée
- Hébergement avec petit-déjeuner
- Dîner de bienvenue et de réseautage
- Kit de formation Risalat (sac, gourde, mug, t-shirt, casquette, protège-passeport, stylos, carnet, magnet & porte-clés)
- Comprehensive Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty Training Manual
- Modèle d'évaluation ex ante de projet
- Matrice de répartition des risques en PPP
- Liste de contrôle de la supervision des travaux
- Modèle de plan de gestion des actifs
- Ateliers pratiques & simulations
- Discussions de groupe & apprentissage entre pairs
- Déjeuner et pauses-café quotidiens
- Accès complet aux installations du lieu de formation
- Mini tablette avec supports pédagogiques numériques
- Visite de terrain (le cas échéant)
- Visite récréative de la ville
Après le programme
- Certificat de participation
- Distinction Risalat de participation au programme
- Documents de référence après la formation
- Liste de contrôle pour la revue des études de rentabilité
- Modèle de plan de maintenance
- Accompagnement après la formation & conseils de suivi
- Rapport du programme
Les institutions peuvent aussi demander une version intra sur mesure de ce programme, dispensée dans leurs locaux ou en ligne. Demander une proposition.
Common Challenges in Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty, And How This Training Helps
Comment les institutions peuvent-elles planifier et hiérarchiser leurs investissements d'infrastructure ?
The programme addresses this directly on the first day (Child-Centred Architectural Planning and Integrated Facility Design), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
Comment les institutions peuvent-elles évaluer des projets et préparer des dossiers d'investissement ?
The programme addresses this directly on the second day (Civil Works Supervision, Safety Compliance, and Procurement), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
Comment les institutions peuvent-elles choisir leurs modèles de financement et d'exécution ?
The programme addresses this directly on the third day (Early Child Nutrition and Integrated Health Operational Routines), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
Comment les institutions peuvent-elles superviser les travaux en matière de délais, de coûts et de qualité ?
The programme addresses this directly on the fourth day (Cross-Sectoral Governance, Maintenance, and Sustainability), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
Comment les institutions peuvent-elles gérer leurs actifs tout au long de leur cycle de vie ?
The programme addresses this directly on the first day (Child-Centred Architectural Planning and Integrated Facility Design), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
Questions fréquentes
When and where does the Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty programme take place?
It runs from 12 Apr 2027 to 15 Apr 2027, in Almaty, Kazakhstan. The registration deadline is shown at the top of this page.
Qui devrait participer ?
The programme is designed for ministry of Education and Science project engineers and technical supervisors, early childhood education specialists and pedagogical advisors, ministry of Health maternal and child healthcare coordinators, project Implementation Unit (PIU) infrastructure and civil works specialists, and others who want practical skills in infrastructure, urban development and partnerships.
Recevrai-je un certificat ?
Oui. Les participants qui terminent le programme reçoivent un certificat de participation délivré par Risalat Consultants International.
Ce programme peut-il être dispensé pour notre seule institution ?
Oui. Nous pouvons proposer une version intra sur mesure dans vos locaux, dans une autre ville ou en ligne, construite autour de vos propres cas. Utilisez la demande de proposition sur cette page.
Faut-il une expérience préalable en infrastructures, développement urbain et partenariats ?
Aucune formation spécialisée n'est requise au-delà d'une expérience dans une fonction similaire. Une courte pré-évaluation aide les animateurs à adapter les sessions au groupe.
Who Will Deliver This Programme
Each date is delivered by a team assigned from Risalat's expert network for this subject. For this programme we assign:
How we choose them: Experience in the region of the participants or comparable settings; Command of the financier rules that apply (World Bank, ADB, AfDB, EU, UN) where relevant; Delivery in English; other languages on request for in-house groups; No conflict of interest with participants' institutions.
Names and short CVs of the assigned experts are shared with registered participants and sponsoring organisations before the programme, on request. Are you an expert in this subject? Join our expert network.
Training courses in AlmatyEducation training courses
Pourquoi Almaty pour ce programme
Almaty est une plateforme pratique pour les délégations d'Asie centrale, avec de bons lieux de formation à des prix intéressants.
The Preschool Physical Infrastructure and Early Child Nutrition Systems in Almaty programme in April 2027 brings together officials and professionals from across the Central Asia region and beyond. Sessions combine short inputs, case studies and group work on participants' own files, and the city's institutions can be added as a study visit on request.
Accès : aéroport international d'Almaty (ALA).
Vérifiez si vous avez besoin d'un visa avec le vérificateur de visa gratuit, et demandez une lettre d'invitation une fois inscrit.
Le même thème dans d'autres villes
- Inclusive Education and Early Learning Quality Standards in Prague (Prague)
- Early Childhood Education Quality Assurance & Teacher Mentoring in Kuala Lumpur (Kuala Lumpur)
Autres programmes à Almaty
- Resilient School Construction and Seismic Retrofitting Supervision in Almaty
- Power Transmission Asset Reliability and SCADA Modernisation in Almaty
- Apprenticeship Systems and Work-Based Learning Frameworks in Almaty
- TVET Curriculum Development and Industry Alignment in Almaty
- Agribusiness Value Chain Aggregation and Post-Harvest Logistics in Almaty
- Cadre de passation des marchés et Règlement applicable aux projets Banque mondiale
- MAPS : méthodologie d'évaluation des systèmes de passation des marchés Initiative MAPS
- Open Contracting Partnership Open Contracting Partnership
For teams and institutions
Bring your team
Teams that learn together apply more at work. Tell us how many people and how you would like to take part: we reply with a group quote within two working days.
Other dates and cities for this subject: Infrastructure, Roads and Transport Projects training courses (161 upcoming dates).
Plus de formations au Kazakhstan · Tous les programmes en Asie · Calendrier complet des formations
Plan this programme in a roadmap: why it matters, why to approve it, the dates to plan and the career it builds.



