Factos essenciais
- Datas
- 18–22 Oct 2027 (5 days)
- Local
- Kuala Lumpur, Malásia
- Preço por participante
- £3.000 (GBP)
- Pagamento
- Por fatura e transferência bancária
- Encerramento das inscrições
- 18 Sep 2027
- A quem se destina
- Highways department planners and geometric design engineers; Transport economists and investment appraisal officers; Regional economic corridor aut…
- Certificado
- Certificado de conclusão
- Opção interna
- Realize-o para a sua equipa, nas datas que preferir
Nesta página 13 secções
Visão geral do programa
Economic corridor development requires synchronising trunk transport infrastructure with trade facilitation, spatial planning, and industrial policies. This executive course in Kuala Lumpur examines the integration of primary regional road networks with economic zones and secondary logistics feeders. Participants will explore practical methodologies for inter-urban highway planning, traffic demand analysis, and corridor-wide spatial development. Through real-world models, the programme demonstrates how capital transport investments generate wider economic benefits when coordinated with local agricultural, manufacturing, and multimodal freight networks.
The curriculum addresses the critical operational phase of regional highways, focusing on long-term performance, asset preservation, and commercial sustainability. Officials will examine modern road asset management systems, lifecycle costing methodologies, and performance-based maintenance contracting structures. By reviewing highway concessions, tolling operational frameworks, and intelligent transport systems, delegates will learn how to maintain cross-border and regional connectivity corridors to international service standards while optimising fiscal allocations and managing operational risks across long asset lifecycles.
Hosted in Malaysia, a country recognized for advanced highway infrastructure and national corridor authorities, this programme offers strategic exposure to mature transport asset management. The course content bridges public sector mandates with donor requirements, including World Bank, Asian Development Bank, and Asian Infrastructure Investment Bank environmental, social, and procurement standards. Participants leave equipped with targeted strategies to implement economic corridor programmes that stimulate sub-regional trade, enhance border connectivity, and sustain highway performance over decades.
Major regional transport investments, such as those under the Western Economic Corridor and Regional Enhancement Programme, require public agencies to move beyond conventional road construction towards integrated corridor development. As secondary connectivity, border clearance points, and rural logistics networks link to national arterial roads, transport authorities face the dual challenge of generating wider economic returns and maintaining complex assets under constrained public budgets. Implementing structured asset management systems, cross-sectoral economic planning, and modern performance-based concession contracts is vital to safeguard regional connectivity investments and deliver sustained industrial growth.
Delivered by Risalat Consultants International in Kuala Lumpur, Malaysia, it combines expert-led sessions, real cases and group work, so that participants can apply what they learn in their own institution.
The Programme Strengthens Institutional Capability
- Principles of economic corridor transformation: from transport arteries to trade corridors
- Spatial planning and industrial cluster connectivity along primary regional highways
- Transport economics: demand forecasting, willingness-to-pay, and traffic diversion modelling
- Multimodal freight integration: linking rail terminals, inland ports, and highway networks
- Donor appraisal standards: economic internal rate of return and wider economic benefit analysis
- Integrating last-mile logistics: connecting agricultural hubs to national expressways
- Rural and secondary road network prioritisation for corridor catchment areas
- Cross-border transit facilitation and integrated border post connectivity
- Planeamento das aquisições e análise de mercado
- Escolha dos métodos e abordagens de contratação
- Redação de especificações e termos de referência
- Documentos de concurso e critérios de avaliação
It is designed for highways department planners and geometric design engineers, transport economists and investment appraisal officers, regional economic corridor authority executives and others who want practical, current skills in procurement and contract management.
The Growing Importance of Economic Corridor Development and Regional Highway Asset Operations in Kuala Lumpur
A contratação é o momento em que o dinheiro público se transforma em estradas, medicamentos, sistemas e serviços. Os atrasos, as especificações deficientes e uma má gestão dos contratos estão entre as razões mais comuns para os projetos se atrasarem ou falharem as auditorias.
Os financiadores e os governos esperam hoje uma boa relação custo-benefício, concorrência leal e decisões bem documentadas em todas as fases, do planeamento à conclusão do contrato. As equipas que gerem bem todo o ciclo executam mais depressa e com menos reclamações.
As organizações precisam cada vez mais de profissionais capazes de:
- Planear uma contratação que corresponda às necessidades e aos prazos do projeto
- Preparar especificações e critérios de avaliação claros
- Avaliar as propostas de forma coerente e defender a decisão
- Gerir os contratos, as alterações e o desempenho
- Manter registos completos para auditoria e revisão
Sistemas sólidos de contratação e gestão de contratos ajudam as organizações a:
- Reduzir os atrasos na contratação e os concursos falhados
- Obter uma boa relação custo-benefício
- Reduzir o risco de reclamações e de constatações de auditoria
- Executar os contratos dentro do prazo e com qualidade
This Economic Corridor Development and Regional Highway Asset Operations in Kuala Lumpur programme brings these elements together in a practical format, so that participants understand not only what good practice looks like but also how to introduce it in their own setting, with the people and resources they have.
Who Should Attend This Economic Corridor Development and Regional Highway Asset Operations in Kuala Lumpur Training?
Este programa destina-se a:
- Highways department planners and geometric design engineers
- Transport economists and investment appraisal officers
- Regional economic corridor authority executives
- Road and bridge asset management directors
- Project directors managing donor-funded highway programmes
- Public-private partnership and highway concession managers
- Feeder logistics and multimodal transport planning specialists
- Cross-border infrastructure and trade facilitation coordinators
- Municipal and regional spatial development officers
- Técnicos e gestores de contratação pública
- Gestores e administradores de contratos
- Gestores de projetos e programas
O programa adequa-se tanto a profissionais experientes como a quem está a assumir novas responsabilidades. Incentivamos grupos que juntem instituições e países diferentes, pois os participantes aprendem muito com a experiência uns dos outros.
Assinale o que a sua equipa precisa de ser capaz de fazer.
Economic Corridor Development and Regional Highway Asset Operations in Kuala Lumpur Training Objectives
Upon successful completion of this Economic Corridor Development and Regional Highway Asset Operations in Kuala Lumpur Training, participants will be able to:
- Formulate integrated economic corridor frameworks linking primary highway corridors to regional economic zones and feeder roads
- Appraise transport infrastructure investments using international economic and financial cost-benefit analysis methodologies
- Design long-term highway operational maintenance concessions incorporating performance-based indicators and risk allocation mechanisms
- Apply asset management principles conforming to ISO 55000 standards across inter-urban road and bridge networks
- Structure institutional coordination mechanisms between transport departments, trade agencies, and local government authorities
- Implement traffic monitoring, toll collection, and Intelligent Transport Systems to optimize corridor operations and freight transit times
- Align corridor infrastructure programmes with multilateral development bank procurement guidelines and environmental and social frameworks
- Explicar o ciclo de contratação e as regras que lhe são aplicáveis
- Preparar um plano de contratação ligado aos prazos do projeto
- Escolher um método e uma abordagem ao mercado adequados
Cada objetivo é praticado durante o programa através de exercícios, casos ou trabalho de grupo, para que os participantes saiam capazes de o pôr em prática, e não apenas de o descrever.
Conteúdo e estrutura do programa
- Principles of economic corridor transformation: from transport arteries to trade corridors
- Spatial planning and industrial cluster connectivity along primary regional highways
- Transport economics: demand forecasting, willingness-to-pay, and traffic diversion modelling
- Multimodal freight integration: linking rail terminals, inland ports, and highway networks
- Donor appraisal standards: economic internal rate of return and wider economic benefit analysis
- Integrating last-mile logistics: connecting agricultural hubs to national expressways
- Rural and secondary road network prioritisation for corridor catchment areas
- Cross-border transit facilitation and integrated border post connectivity
- Road safety audits and geometric design considerations for mixed-traffic inter-urban corridors
- Stakeholder coordination: aligning national transport priorities with local economic needs
- ISO 55000 alignment for state highway agencies and national road authorities
- Pavement management systems: condition assessment, roughness index, and defect tracking
- Lifecycle cost analysis: balancing capital expenditure with long-term maintenance budgets
- Bridge and structures maintenance management: inspection regimes and resilience planning
- Establishing accurate asset registers and spatial highway inventory databases
- Structuring Performance-Based Road Maintenance Contracts: specifications and incentives
- Public-Private Partnerships in highway development: tolling models, availability payments, and hybrid annuities
- Risk allocation matrices in long-term highway operation and maintenance concessions
- Managing concessionaire performance: key performance indicators, penalties, and audit mechanisms
- Tolling operations: electronic toll collection systems, interoperability, and revenue leakage control
- Intelligent Transport Systems for highway operations, traffic control, and incident management
- Overload control frameworks: weigh-in-motion systems and axle load enforcement
- Institutional delivery models: dedicated corridor development authorities versus line ministries
- Multilateral development bank compliance: monitoring environmental and social management plans
- Action planning: drafting an economic corridor and asset management implementation roadmap
Conteúdo completo, dia a dia
O programa decorre ao longo de 5 dias. Cada dia combina contributos de especialistas, trabalho prático e um workshop ou estudo de caso final:
- First Day: Corridor Economics and Strategic Network Planning
- Second Day: Secondary Connectivity and Feeder Road Logistics
- Third Day: Highway Asset Management and Lifecycle Costing
- Fourth Day: Contracting Models and Concession Operations
- Fifth Day: Intelligent Operations and Institutional Governance
Conteúdo completo, dia a dia
First Day | Corridor Economics and Strategic Network Planning
- Principles of economic corridor transformation: from transport arteries to trade corridors
- Spatial planning and industrial cluster connectivity along primary regional highways
- Transport economics: demand forecasting, willingness-to-pay, and traffic diversion modelling
- Multimodal freight integration: linking rail terminals, inland ports, and highway networks
- Donor appraisal standards: economic internal rate of return and wider economic benefit analysis
Workshop: Corridor Economics and Strategic Network Planning: Applying It to Your Institution
Em pequenos grupos, os participantes aplicam os métodos do dia a exemplos das suas próprias instituições e acordam os próximos passos práticos.
Second Day | Secondary Connectivity and Feeder Road Logistics
- Integrating last-mile logistics: connecting agricultural hubs to national expressways
- Rural and secondary road network prioritisation for corridor catchment areas
- Cross-border transit facilitation and integrated border post connectivity
- Road safety audits and geometric design considerations for mixed-traffic inter-urban corridors
- Stakeholder coordination: aligning national transport priorities with local economic needs
Workshop: Secondary Connectivity and Feeder Road Logistics: Applying It to Your Institution
Em pequenos grupos, os participantes aplicam os métodos do dia a exemplos das suas próprias instituições e acordam os próximos passos práticos.
Third Day | Highway Asset Management and Lifecycle Costing
- ISO 55000 alignment for state highway agencies and national road authorities
- Pavement management systems: condition assessment, roughness index, and defect tracking
- Lifecycle cost analysis: balancing capital expenditure with long-term maintenance budgets
- Bridge and structures maintenance management: inspection regimes and resilience planning
- Establishing accurate asset registers and spatial highway inventory databases
Case Study: Highway Asset Management and Lifecycle Costing in Practice
Os participantes analisam um caso realista, comparam as escolhas feitas com as boas práticas e retiram lições que podem aplicar no seu próprio contexto.
Fourth Day | Contracting Models and Concession Operations
- Structuring Performance-Based Road Maintenance Contracts: specifications and incentives
- Public-Private Partnerships in highway development: tolling models, availability payments, and hybrid annuities
- Risk allocation matrices in long-term highway operation and maintenance concessions
- Managing concessionaire performance: key performance indicators, penalties, and audit mechanisms
- Tolling operations: electronic toll collection systems, interoperability, and revenue leakage control
Workshop: Contracting Models and Concession Operations: Applying It to Your Institution
Em pequenos grupos, os participantes aplicam os métodos do dia a exemplos das suas próprias instituições e acordam os próximos passos práticos.
Fifth Day | Intelligent Operations and Institutional Governance
- Intelligent Transport Systems for highway operations, traffic control, and incident management
- Overload control frameworks: weigh-in-motion systems and axle load enforcement
- Institutional delivery models: dedicated corridor development authorities versus line ministries
- Multilateral development bank compliance: monitoring environmental and social management plans
- Action planning: drafting an economic corridor and asset management implementation roadmap
Capstone Exercise: Economic Corridor Development and Regional Highway Asset Operations in Kuala Lumpur Action Plan for Your Institution
Os participantes sintetizam a semana num plano de ação para a sua instituição, com prioridades, responsáveis e primeiros passos, e apresentam-no para receber comentários dos colegas e dos formadores.
Economic Corridor Development and Regional Highway Asset Operations in Kuala Lumpur Training Methodology
The training uses interactive adult-learning methods including case studies of highway concessions and economic corridor agencies in Southeast Asia, group work on asset management data, and peer-to-peer reviews. Participants will evaluate corridor appraisal models, review actual contract conditions for performance-based maintenance, and develop institutional implementation frameworks applicable to their home country programmes.
O programa combina:
- Sessões conduzidas por especialistas sobre as práticas atuais
- Estudos de caso regionais e internacionais
- Trabalho de grupo e exercícios práticos
- Simulações e dramatizações, quando relevante
- Discussão dos desafios dos próprios participantes
- Aprendizagem entre pares de várias instituições e países
- Ferramentas e modelos práticos para levar para o trabalho
- Reflexão diária e planeamento de ações
Antes do programa, uma breve avaliação prévia ajuda os formadores a compreender a função e as prioridades de cada participante, para que os exemplos e exercícios possam ser ajustados ao grupo. Cada dia termina com uma breve reflexão em que os participantes registam o que vão aplicar no trabalho.
Resultados esperados
Upon completion of this Economic Corridor Development and Regional Highway Asset Operations in Kuala Lumpur Training, participants will be able to:
- Ability to design comprehensive corridor strategies connecting primary highway networks with local industrial and agricultural zones
- Competence in selecting and structuring performance-based maintenance contracts and highway concession agreements
- Proficiency in applying lifecycle cost analysis to optimize national and regional road asset management budgets
- Capability to set up weigh-in-motion, tolling, and intelligent traffic management systems to protect corridor infrastructure
- Skill in conducting economic appraisals that satisfy the scrutiny of international funding institutions
- Preparedness to coordinate multi-agency institutions for cross-border corridor operations and secondary connectivity programmes
- Planear uma contratação adequada às necessidades e aos prazos do projeto
- Preparar especificações e critérios de avaliação claros
Os participantes saem com um plano de ação pessoal e ferramentas práticas que podem utilizar na sua instituição logo na primeira semana após o regresso. As instituições que enviam vários participantes podem aproveitar o programa para acordar métodos e modelos comuns entre equipas, o que torna as melhorias mais fáceis de manter.
£3.000 por participante · fatura e transferência bancária · desconto para grupos de 5 ou mais pessoas
Cinco ou mais participantes da mesma organização: peça a tarifa de grupo no pedido de fatura.
Dez ou mais participantes: uma versão interna para a sua instituição pode custar menos por pessoa. Peça um orçamento para formação interna.
Registration closes in 310 days (18 Sep 2027)
Institutional Application of Economic Corridor Development and Regional Highway Asset Operations in Kuala Lumpur Training
Este programa ajuda as organizações a reforçar:
- Planeamento e estratégia de contratação
- Prática de avaliação
- Gestão de contratos
- Tratamento de reclamações
- Registos de contratação e preparação para auditoria
Os participantes regressam com ferramentas práticas para melhorar:
- Planos e prazos de contratação
- Especificações e critérios de avaliação
- Relatórios de avaliação
- Monitorização de contratos
- Gestão de alterações e reclamações contratuais
O programa foi construído para que a aprendizagem passe da sala de formação para a instituição. Sempre que possível, os participantes trabalham sobre os seus próprios processos e documentos e saem com um plano de ação que as chefias podem analisar e apoiar.
Relevância regional e aplicação
Europa
As instituições europeias aplicam a contratação e a gestão de contratos no âmbito de quadros regulamentares detalhados e de agendas de reforma. Os participantes da Europa podem comparar a sua prática com a de colegas de outras regiões e testar o funcionamento de métodos consolidados em condições diferentes.
África
Em toda a África, os ministérios, os organismos e as equipas de projeto que trabalham em contratação e gestão de contratos operam cada vez mais em paralelo com programas financiados por doadores que exigem sistemas e evidências claros. O programa ajuda os participantes a adaptar as boas práticas às instituições e aos recursos com que trabalham.
Médio Oriente
No Médio Oriente, as estratégias nacionais de desenvolvimento e os planos de diversificação colocam exigências crescentes à contratação e à gestão de contratos. Os participantes exploram como criar, nos organismos públicos e nas empresas, as capacidades de que esses planos necessitam.
Ásia
As instituições da Ásia aliam um crescimento rápido a programas de modernização ambiciosos. Os participantes asiáticos podem partilhar a sua experiência de expansão rápida de sistemas e aprender com abordagens utilizadas noutros contextos.
Pacífico
Os pequenos Estados insulares e do Pacífico enfrentam restrições específicas de dimensão, distância e capacidade. O programa destaca abordagens práticas e proporcionadas à contratação e à gestão de contratos, adequadas a instituições de menor dimensão.
Holding the programme in Kuala Lumpur, Malaysia brings participants together away from their daily pressures, so they can compare how procurement and contract management is handled in different settings. The same programme can also be delivered in-house for one institution, in its own country or online, with cases taken from its current work.
Perfil do país anfitrião – Malásia
Programas, workshops, visitas de estudo e cursos de formação em Kuala Lumpur, Malásia, pela Risalat Consultants International
Estudar fora do seu país dá aos participantes tempo para se concentrarem, um olhar novo sobre a sua própria instituição e a oportunidade de criar uma rede com colegas de outros países.
Economic Corridor Development and Regional Highway Asset Operations in Kuala Lumpur Training Deliverables
Os participantes recebem apoio antes, durante e depois do programa, para que a preparação, a aprendizagem e o acompanhamento formem uma experiência contínua.
Antes do programa
- Avaliação prévia dos participantes
- Economic Corridor Development and Regional Highway Asset Operations in Kuala Lumpur Readiness Assessment
- Economic Corridor Development and Regional Highway Asset Operations in Kuala Lumpur Resource Pack
- Materiais de leitura preparatória
- Apoio e aconselhamento gratuitos em matéria de vistos
Durante o programa
- Recolha no aeroporto e apoio de boas-vindas
- Alojamento com pequeno-almoço
- Jantar de boas-vindas e networking
- Kit de formação Risalat (saco, garrafa, caneca, t-shirt, boné, capa de passaporte, canetas, bloco de notas, íman e porta-chaves)
- Comprehensive Economic Corridor Development and Regional Highway Asset Operations in Kuala Lumpur Training Manual
- Modelo de plano de contratação
- Grelha de pontuação para avaliação de propostas
- Modelo de Plano de Gestão de Contratos
- Registo de alterações e reclamações contratuais
- Workshops práticos e simulações
- Discussões de grupo e aprendizagem entre pares
- Almoço e pausas para café diários
- Acesso total às instalações do local de formação
- Mini tablet com materiais de aprendizagem digitais
- Visita de campo (quando aplicável)
- Passeio recreativo pela cidade
Depois do programa
- Certificado de Conclusão
- Prémio Risalat de Reconhecimento da Participação no Programa
- Materiais de referência pós-formação
- Lista de verificação dos registos de contratação
- Ferramenta de acompanhamento do desempenho contratual
- Apoio pós-formação e orientação de acompanhamento
- Relatório do programa
As instituições podem também solicitar uma versão interna e adaptada deste programa, realizada nas suas instalações ou online. Pedir uma proposta.
Common Challenges in Economic Corridor Development and Regional Highway Asset Operations in Kuala Lumpur, And How This Training Helps
Como podem as instituições planear uma contratação adequada às necessidades e aos prazos do projeto?
The programme addresses this directly on the first day (Corridor Economics and Strategic Network Planning), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
Como podem as instituições preparar especificações e critérios de avaliação claros?
The programme addresses this directly on the second day (Secondary Connectivity and Feeder Road Logistics), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
Como podem as instituições avaliar as propostas de forma coerente e defender a decisão?
The programme addresses this directly on the third day (Highway Asset Management and Lifecycle Costing), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
Como podem as instituições gerir os contratos, as alterações e o desempenho?
The programme addresses this directly on the fourth day (Contracting Models and Concession Operations), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
Como podem as instituições manter registos completos para auditoria e revisão?
The programme addresses this directly on the fifth day (Intelligent Operations and Institutional Governance), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
Perguntas frequentes
When and where does the Economic Corridor Development and Regional Highway Asset Operations in Kuala Lumpur programme take place?
It runs from 18 Oct 2027 to 22 Oct 2027, in Kuala Lumpur, Malaysia. The registration deadline is shown at the top of this page.
Quem deve participar?
The programme is designed for highways department planners and geometric design engineers, transport economists and investment appraisal officers, regional economic corridor authority executives, road and bridge asset management directors, and others who want practical skills in procurement and contract management.
Vou receber um certificado?
Sim. Os participantes que concluírem o programa recebem um Certificado de Conclusão da Risalat Consultants International.
Este programa pode ser realizado apenas para a nossa instituição?
Sim. Podemos realizar uma versão interna adaptada nas suas instalações, noutra cidade ou online, construída em torno dos seus próprios casos. Utilize o pedido de proposta nesta página.
Preciso de experiência prévia em contratação e gestão de contratos?
Não é necessária formação especializada além de experiência numa função relacionada. Uma breve avaliação prévia ajuda os formadores a adaptar as sessões ao grupo.
Who Will Deliver This Programme
Each date is delivered by a team assigned from Risalat's expert network for this subject. For this programme we assign:
How we choose them: Experience in the region of the participants or comparable settings; Command of the financier rules that apply (World Bank, ADB, AfDB, EU, UN) where relevant; Delivery in English; other languages on request for in-house groups; No conflict of interest with participants' institutions.
Names and short CVs of the assigned experts are shared with registered participants and sponsoring organisations before the programme, on request. Are you an expert in this subject? Join our expert network.
Training courses in Kuala LumpurInfrastructure, Planning, and Development training courses
Porquê Kuala Lumpur para este programa
Kuala Lumpur alia uma boa relação qualidade-preço, vistos fáceis para muitos países e exemplos de unidades de execução do setor público.
The Economic Corridor Development and Regional Highway Asset Operations in Kuala Lumpur programme in October 2027 brings together officials and professionals from across the Asia region and beyond. Sessions combine short inputs, case studies and group work on participants' own files, and the city's institutions can be added as a study visit on request.
Como chegar: Aeroporto Internacional de Kuala Lumpur (KUL).
Verifique se precisa de visto com o Verificador de Vistos gratuito e peça uma carta-convite depois de se inscrever.
O mesmo tema noutras cidades
- Cross-Border Road Transport Corridor Monitoring and Border Post Works in Accra (Accra)
- Emergency Road Corridor Spot Improvement and Slope Protection in Muscat (Muscat)
- Bus Rapid Transit Planning and Integrated Fare Systems in Casablanca (Casablanca)
- Safe System Road Engineering and Blackspot Remediation in Lisbon (Lisbon)
- Rural Feeder Road Engineering and All-Weather Asset Maintenance in Nairobi (Nairobi)
- Logistics Park Planning, Multimodal Freight & Corridor Operations in Dubai (Dubai)
Outros programas em Kuala Lumpur
- Public Administration Reform and Civil Service Management in Kuala Lumpur
- Public Hospital Infectious Disease Infrastructure & Biosafety in Kuala Lumpur
- Urban Pumping Station Modernisation & Solid Waste Interception in Kuala Lumpur
- Industry-Led TVET Dual-Training Schemes and Apprenticeship Governance in Kuala Lumpur
- Vaccine Cold Chain Fleet Monitoring and Temperature Integrity in Kuala Lumpur
- Quadro e regulamentos de contratação para projetos Banco Mundial
- MAPS: Metodologia de Avaliação de Sistemas de Contratação Pública Iniciativa MAPS
- Open Contracting Partnership Open Contracting Partnership
For teams and institutions
Bring your team
Teams that learn together apply more at work. Tell us how many people and how you would like to take part: we reply with a group quote within two working days.
Other dates and cities for this subject: Infrastructure, Roads and Transport Projects training courses (161 upcoming dates).
Mais cursos de formação na Malásia · Todos os programas na Ásia · Calendário de formação completo
Plan this programme in a roadmap: why it matters, why to approve it, the dates to plan and the career it builds.



