Factos essenciais
- Datas
- 15–19 mar. 2027 (5 dias)
- Local
- Partilhado no registo, Istambul, Turquia
- Preço por participante
- £3.850 (GBP)
- Pagamento
- Por fatura e transferência bancária
- Encerramento das inscrições
- 3 fev. 2027
- Formato
- 5-day short course: a practical capacity-building programme for government, NGO and project teams in Istanbul
- Certificado
- Certificado de conclusão
- Opção interna
- Realize-o para a sua equipa, nas datas que preferir
Nesta página 17 secções
Visão geral do programa
In short: Water resource management is the planning, allocation, measurement and financing of water so that a basin’s limited supply meets farming, cities, energy and the environment without exhausting it. For an irrigation agency it means knowing how much water enters each canal, where it is lost, who receives it, what it costs to deliver and how the system will cope with drought. This five-day programme turns those principles into working tools for ministries, project units and district water service bodies.
Water Resource Management Training in Istanbul is designed for the teams now carrying out Central Asia’s largest irrigation reforms. In Uzbekistan, the World Bank’s press release on the National Irrigation and Energy Efficiency Improvement Project (P504600) notes that agriculture uses about 90% of the country’s water, that about 2.4 million hectares (56% of irrigated land) depend on pumps, and that some 1,700 pumping stations consume around 7.2 billion kWh a year, roughly 16% of national electricity use. The same source expects water availability to fall by 30–40% while irrigation demand rises by about 25%.
Subproject documents show what this means on the ground. A June 2026 initial environmental examination for the R8 canal system in Khorezm, prepared under the ADB-financed Climate Adaptive Water Resources Management in the Aral Sea Basin Sector Project (53120-001), reports irrigation efficiency of about 40% in the area and water withdrawals above plan in every year from 2019 to 2022, by 65%, 19%, 24% and 48%. The works aim to raise system conveyance efficiency from about 0.56 to 0.80 across a command area of 19,992 hectares.
As instituições estão a mudar em simultâneo. O programa nacional para a gestão de recursos hídricos e desenvolvimento de irrigação para 2025–2028, aprovado em Agosto de 2025, confirma 159 órgãos distritais de “Serviços de Abastecimento de Água” formados a partir de antigos departamentos distritais de irrigação, com maior autonomia financeira, planeia contadores em 5.200 bombas, sistemas digitais em 12.000 poços de observação e um centro de formação setorial com 200 lugares. Novos órgãos, novos contadores e novas regras de financiamento necessitam de pessoal que os saiba utilizar.
O programa reúne estes tópicos: planeamento e afetação de bacias, eficiência de irrigação, contabilidade da água, energia de bombagem, organizações de utilizadores, risco ambiental e social, recuperação de custos e adaptação climática, tudo aplicado através dos procedimentos de projetos financiados pelo BAD e pelo Banco Mundial.
The Programme Strengthens Institutional Capability
- Princípios de gestão integrada de recursos hídricos aplicados a bacias irrigadas
- Balanços hídricos de bacias e planos de alocação sazonal
- Limites de água, planos de captação e regras de alocação em caso de seca
- Análise da eficiência de rega ao nível do canal, do sistema e do campo
- Canal lining and modernisation investment choices
- Auditorias energéticas de estações de bombagem e planeamento de eficiência
- Service agreements between water service bodies and users
- Associações de utilizadores de água e gestão participativa
- Operation and maintenance planning and asset registers
- Tarifas de água, recuperação de custos e orçamento de O&M
- Triagem de riscos ambientais e sociais para obras de irrigação
- Planos de gestão ambiental e mecanismos de reclamação
- Risco climático, preparação para a seca e planeamento de adaptação
- Quadros de resultados e indicadores para projetos de irrigação
The result is a team that can show where its water goes and plan each season with evidence.
- Recursos
- Atividades
- Produtos
- Resultados
- Impacto
A Crescente Importância da Gestão de Recursos Hídricos
Os fundos para a modernização da irrigação estão a chegar mais depressa do que os sistemas para os gerir. O crédito de 200 milhões de USD do Banco Mundial para o P504600, com 23,2 milhões de USD de cofinanciamento governamental, irá revestir a betão 259 km de oito canais primários ligados ao Amu Dária e ao Sir Dária, construir cerca de 470 estruturas hidráulicas e instalar descarregadores com comportas, com caudalímetros e um sistema SCADA, em cinco regiões. O Banco prevê que as perdas de água diminuam em cerca de 540 milhões de metros cúbicos por ano e o consumo de eletricidade em mais de 165 milhões de kWh por ano.
ADB’s Aral Sea Basin sector project, recorded at about USD 154 million including grant resources, finances climate-adaptive irrigation and drainage in the Amu Darya and Zarafshan basins. Its subproject documents also list an output to strengthen the capacity of water management organisations and water consumer associations on infrastructure management and water use efficiency. A draft Uzbekistan 2030 strategy, reported in January 2026, notes that 66% of the 18,700 km of main and inter-farm canals still have earthen beds.
As organizações precisam cada vez mais de profissionais capazes de:
- Construção de balanços hídricos de bacias e sistemas a partir de dados de campo
- Setting and enforcing withdrawal limits by canal and season
- Comparing planned and actual withdrawals and explaining the gap
- Priorização de secções de canais para revestimento utilizando dados de perdas e custos
- Running energy audits on pumping stations
- Designing service agreements with water users
- Apoiar associações de usuários de água na cobrança de taxas e manutenção de ativos
- Preparação de orçamentos de O&M associados à condição dos ativos
- Rastreio de trabalhos de irrigação quanto ao risco ambiental e social
- Preparing drought response and allocation rules
- Relatar resultados em relação aos indicadores do ADB e do Banco Mundial
Sistemas fortes de gestao de recursos hidricos ajudam as organizacoes a:
- Deliver the water savings that financiers and government expect
- Reduce electricity bills for pumped irrigation
- Distribuir a água de forma equitativa entre os utilizadores a montante e a jusante
- Planear para os anos secos antes de eles chegarem
- Protect new canal assets through proper maintenance
- Give farmers a reliable and predictable service
- Passar em auditorias com registos claros de água e dinheiro
- Attract further investment and private operators
O revestimento de canais economiza água apenas quando alguém mede os fluxos antes e depois, ajusta as alocações e mantém o canal. Este treinamento constrói essa cadeia de evidências, desde o ponto de medição até o relatório do ministério.
Source: ADB Climate Adaptive Water Resources Management in the Aral Sea Basin Sector Project, R8 subproject initial environmental examination (June 2026)
1. Aproximadamente qual é a quota de eletricidade do Usbequistão utilizada pelas estações de bombagem de irrigação?
O Banco Mundial relata que cerca de 1.700 estações de bombeamento consomem cerca de 7,2 bilhões de kWh por ano, o que equivale a aproximadamente 16% do consumo nacional de eletricidade.
2. Qual é a eficiência de irrigação do relatório de avaliação de junho de 2026 para a área do canal R8 em Khorezm?
A avaliação do subprojeto R8 financiado pelo ADB reporta uma eficiência de irrigação de cerca de 40% e visa aumentar a eficiência de transporte do sistema de cerca de 0,56 para 0,80.
3. Quantos órgãos distritais de 'Serviços de Abastecimento de Água' descreve o programa de água do Uzbequistão para 2025–2028?
O programa aprovado em agosto de 2025 descreve 159 organismos formados a partir de departamentos distritais de irrigação e dotados de maior autonomia financeira.
Who Should Attend This Water Resource Management Training?
Este programa destina-se a:
- Altos funcionários dos ministérios dos recursos hídricos e da agricultura
- Gestores de administração de irrigação regional e de bacias
- Chefes e engenheiros de órgãos de serviços de água distritais
- Diretores e coordenadores de unidades de implementação de projetos
- PIU engineers, monitoring and evaluation specialists
- Especialistas em salvaguardas ambientais e sociais
- Pessoal de aquisições e gestão de contratos de projetos de água
- Pumping station managers and energy engineers
- Líderes de associações de utentes de água e pessoal de federações
- Responsáveis financeiros e tarifários encarregues dos orçamentos de O&M
- Planning and climate adaptation officers
- Supervision consultants and design engineers
- PPP unit staff and private operators of water facilities
Equipas mistas de uma única instituição obtêm o máximo proveito.
Assinale o que a sua equipa precisa de ser capaz de fazer.
Objetivos da Formação em Gestão de Recursos Hídricos
Upon successful completion of this Water Resource Management Training, participants will be able to:
- Explicar a gestão integrada de recursos hídricos no contexto de bacias hidrográficas
- Build a simple water balance for a canal system
- Draft seasonal allocation and drought rules
- Calculate conveyance and field application efficiency
- Classificar opções de modernização de canais por economia de água e custo
- Conceber um plano de medição e contabilidade da água
- Identify energy savings in pumping stations
- Prepare a service agreement between a water service body and users
- Planear apoio para associações de utentes de água
- Triagem de subprojetos quanto a riscos ambientais e sociais
- Preparar um plano orçamentado de O&M e recuperação de custos
- Reportar resultados no formato esperado pelos financiadores
Each objective is linked to a workshop output, so participants leave with drafts they can finish at home.
Conteúdo e estrutura do programa
- Gestão integrada de recursos hídricos: princípios e prática
- A bacia hidrográfica como unidade de planeamento: exemplos de Amu Darya e Syr Darya
- Building a basin and system water balance
- Usos concorrentes: irrigação, água potável, energia e ecossistemas
- Limites de levantamento e planeamento de alocação sazonal
- Porque é que os levantamentos reais excedem os planos: causas e controlos
- National strategies: the 2025–2028 programme and 2030 targets
- Eficiência de transporte, distribuição e aplicação em campo
- Medição de perdas: infiltrações, perdas operacionais e uso não autorizado
- Canal lining: where it pays and where it does not
- Estruturas hidráulicas, descarregadores com comportas e controlo de caudal
- Abastecimento por gravidade versus bombeamento: compensações de projeto
- Drenagem, salinidade e empantanamento
- Asset condition surveys and prioritisation
- Water accounting concepts: inflow, consumption and return flow
- Métodos de medição de caudal para canais e descarregadores
- Contadores de bombagem, contadores de electricidade e qualidade dos dados
- SCADA, telemetria e poços de observação digital
- Auditorias energéticas de estações de bombagem e indicadores de eficiência
- From data to decisions: dashboards and monthly reports
- Verificação de poupanças reivindicadas por projetos
- Water service bodies with financial autonomy: roles and accountability
- Acordos de serviço e padrões de serviço para utilizadores de água
- Associações de utentes de água: constituição, governação e federações
- Transferência da gestão de regadio: lições internacionais
- Orçamentos de O&M, registos de ativos, taxas e recuperação de custos
- Gestão PPP de instalações de água: supervisão e contratos
- Triagem ambiental e social ao abrigo das políticas do BAD e do Banco Mundial
- Climate projections and reduced water availability
- Planos de preparação para secas e níveis de ativação
- Risco de inundação e alerta precoce em bacias hidrográficas
- Quadros de resultados e indicadores para projetos de irrigação
- Procurement and contract oversight for canal works
- Supervision, quality control and handover
- Reporting to ADB and the World Bank
Conteúdo completo, dia a dia
Os cinco dias avançam da bacia para o canal, a bomba, o utilizador e o financiador.
- Dia 1: planeamento de bacias, balanços hídricos e alocação
- Dia 2: eficiência de irrigação e modernização de canais
- Dia 3: contabilidade da água, medição e energia de bombagem
- Dia 4: entidades gestoras de água, utilizadores, financiamento e risco
- Day 5: climate adaptation, project delivery and action plans
Conteúdo completo, dia a dia
Primeiro Dia | Planificação de Bacias e Alocação de Água
- Gestão integrada de recursos hídricos: princípios e prática
- A bacia hidrográfica como unidade de planeamento: exemplos de Amu Darya e Syr Darya
- Building a basin and system water balance
- Usos concorrentes: irrigação, água potável, energia e ecossistemas
- Limites de levantamento e planeamento de alocação sazonal
- Porque é que os levantamentos reais excedem os planos: causas e controlos
- National strategies: the 2025–2028 programme and 2030 targets
- Papéis dos ministérios, organismos de bacia e serviços distritais
Workshop: Lendo um Balanço Hídrico
As equipas recebem um conjunto de dados simplificado modelado com base num sistema de canais onde as captações superaram o plano durante quatro anos. Constroem um balanço hídrico, identificam onde surge a diferença entre o plano e o uso, e propõem três regras de alocação para a época seguinte. Os resultados são comparados e discutidos em função dos limites com que cada equipa trabalha no seu país de origem.
Segundo Dia | Eficiência de Irrigação e Modernização de Canais
- Eficiência de transporte, distribuição e aplicação em campo
- Medição de perdas: infiltrações, perdas operacionais e uso não autorizado
- Canal lining: where it pays and where it does not
- Estruturas hidráulicas, descarregadores com comportas e controlo de caudal
- Abastecimento por gravidade versus bombeamento: compensações de projeto
- Drenagem, salinidade e empantanamento
- Asset condition surveys and prioritisation
- Lições da modernização de canais do Banco Mundial e do ADB
Workshop: Prioritising Canal Sections for Lining
Using loss estimates, command areas and cost figures, teams rank ten canal sections for investment. They test how the ranking changes when energy savings from reduced pumping are included, and prepare a one-page justification suitable for a project steering committee.
Third Day | Water Accounting, Measurement and Pumping Energy
- Water accounting concepts: inflow, consumption and return flow
- Métodos de medição de caudal para canais e descarregadores
- Contadores de bombagem, contadores de electricidade e qualidade dos dados
- SCADA, telemetria e poços de observação digital
- Auditorias energéticas de estações de bombagem e indicadores de eficiência
- From data to decisions: dashboards and monthly reports
- Verificação de poupanças reivindicadas por projetos
- Data governance between agencies and districts
Workshop: Conceção de um Plano de Mensuração
Cada equipa concebe um plano de medição e relato para um sistema de canais com uma estação de bombagem. O plano define os pontos de medição, as frequências, as responsabilidades e um formato de relatório mensal, e demonstra como os dados comprovarão a poupança de água e de energia que um financiador espera ver.
Quarto Dia | Órgãos de Serviço, Utilizadores, Finanças e Risco
- Water service bodies with financial autonomy: roles and accountability
- Acordos de serviço e padrões de serviço para utilizadores de água
- Associações de utentes de água: constituição, governação e federações
- Transferência da gestão de regadio: lições internacionais
- Orçamentos de O&M, registos de ativos, taxas e recuperação de custos
- Gestão PPP de instalações de água: supervisão e contratos
- Triagem ambiental e social ao abrigo das políticas do BAD e do Banco Mundial
- Mecanismos de reclamação, questões de compensação de terras e árvores
- Participação das mulheres na gestão da água
Case Study: Strengthening Water User Organisations
Os participantes estudam um projeto de irrigacao regional onde uma revisao constatou que as organizacoes de agricultores precisavam de mais apoio para assumir a operacao e manutencao, e onde aresolucao de reclamacoes ficou atrasada em relacao ao objetivo. As equipas concebem um pacote de apoio que abrange formacao, cobranca de taxas, planejamento de manutencao e tratamento de reclamacoes para o seu proprio contexto.
Fifth Day | Climate Adaptation and Project Delivery
- Climate projections and reduced water availability
- Planos de preparação para secas e níveis de ativação
- Risco de inundação e alerta precoce em bacias hidrográficas
- Quadros de resultados e indicadores para projetos de irrigação
- Procurement and contract oversight for canal works
- Supervision, quality control and handover
- Reporting to ADB and the World Bank
- Building a 12-month institutional action plan
Exercício de Síntese: Um Plano de Melhoria da Gestão da Água
Teams combine the week’s outputs into one improvement plan for their organisation: an allocation rule, a measurement plan, a canal priority list, a user support package and an O&M budget outline. Each plan is presented to a panel, which tests whether the actions are realistic, costed and linked to project indicators.
Metodologia de Formacao em Gestao de Recursos Hidricos
O treinamento baseia-se em documentos que os participantes utilizam no trabalho: balanços hídricos, planos de alocação, avaliações ambientais e quadros de resultados, com breves exposições seguidas de exercícios com dados reais.
O programa combina:
- Short expert presentations with clear frameworks
- Case studies from ADB- and World Bank-financed projects
- Exercícios de balanço hídrico, eficiência e priorização de canais
- Measurement and reporting plan design
- Prática de auditoria energética de bombagem
- Jogos de papel entre entidades prestadoras de serviços e utilizadores de água
- Environmental and social screening exercises
- Revisão entre pares dos resultados das equipas
- Um plano final apresentado a um painel
Sessions can be supported in English and Russian where the group needs it. Facilitators adapt examples to the participants’ basins and projects, and every tool is shared in editable form.
Visitas técnicas e programa no terreno
Caso a entidade de acolhimento confirme com antecedência, o programa inclui uma visita de meio dia a uma instalação de infraestruturas de água na área de Istambul para observar a medição, o controlo e a manutenção em funcionamento. As entidades de acolhimento são confirmadas para cada coorte; caso não seja possível realizar uma visita, esta é substituída por uma sessão de estudo prolongada sobre a experiência de gestão de regadio da Turquia.
Resultados esperados
Após a conclusão desta Formação em Gestão de Recursos Hídricos, os participantes estarão aptos a:
- Apresentar um balanço hídrico para o seu próprio sistema
- Explain the gap between planned and actual withdrawals
- Propor regras de alocação e seca para a próxima época
- Rank canal investments using loss, energy and cost data
- Set up a measurement and monthly reporting routine
- Identificar poupanças rápidas de energia em estações de bombagem
- Support water user associations with a clear package
- Triagem de subprojetos quanto a riscos ambientais e sociais
- Reportar o progresso de acordo com os requisitos dos financiadores
Participants also return with a 12-month action plan agreed within their team.
£3.850 por participante · fatura e transferência bancária · grupos de 5 ou mais pessoas beneficiam de desconto
Cinco ou mais participantes da mesma organização: peça a tarifa de grupo no pedido de fatura.
Dez ou mais: uma versão interna para a sua instituição pode custar menos por pessoa. Pedir um orçamento interno.
As inscrições encerram em 72 dias (3 Fev 2027)
Aplicação Institucional de Treinamento em Gestão de Recursos Hídricos
Este programa ajuda as organizações a reforçar:
- Planejamento de alocação de água de bacias e distritos
- Water accounting and data management
- Gestão de ativos de canais e bombas
- Energy management in pumped irrigation
- Prestação de serviços aos agricultores
- Apoio a associações de utentes de água
- Financiamento de O&M e recuperação de custos
- Gestão de riscos ambientais e sociais
- Project monitoring and reporting
- Contractor and PPP oversight
Os participantes regressam com ferramentas práticas para melhorar:
- Modelos de balanço hídrico
- Allocation and drought rule formats
- Matrizes de priorização de canais
- Modelos de planos de medição
- Listas de verificação de auditoria energética de bombagem
- Esboços de acordos de serviço
- Calculadoras de orçamento e taxas de O&M
- Listas de verificação de triagem ambiental e social
As instituições que pretendem identificar lacunas de competências antes de nomear funcionários podem utilizar a avaliação de necessidades de formação da Risalat ou a avaliação de capacidade institucional. Para uma visão mais ampla da situação do Uzbequistão, leia o nosso artigo sobre a gestão de recursos hídricos no Uzbequistão.
Relevância regional e aplicação
Ásia Central
O Uzbequistão é o foco principal. O projeto P504600 do Banco Mundial foca-se nas perdas em canais e na energia de bombagem em Karakalpakstan, Bukhara, Kashkadarya, Namangan e Surkhandarya, enquanto o projeto para a Bacia do Mar de Aral do ADB atua nas bacias do Amu Dária e do Zarafshan. A avaliação R8 em Khorezm demonstra o problema central de gestão: captações acima do plano, baixa eficiência e a necessidade de comprovar poupanças. Uma preocupação de contratação pública levantada junto do ADB no início de 2026 foi remetida aos seus gabinetes de contratos e integridade, um lembrete de que os processos contratuais exigem o mesmo rigor que a hidráulica.
Ásia do Sul
No Nepal, o Banco Mundial aprovou 137 milhões de dólares em maio de 2025 para a terceira fase da modernização da irrigação de Rani Jamara Kulariya (P507433), levando irrigação durante todo o ano a mais 17.500 hectares em Kailali e incluindo apoio à associação de utentes de água. A revisão de dezembro de 2024 da fase anterior relatou 629 hectares de nova área irrigada face a uma meta de 2.000 hectares e apenas 29,4% das reclamações resolvidas face a uma meta de 60%. No Bangladesh, um empréstimo proposto pelo Banco Asiático de Desenvolvimento de 150 milhões de dólares para a gestão adaptativa de sistemas fluviais (59172-001) reabilitaria cerca de 104 km de margens fluviais sob uma Categoria A ambiental preliminar.
África
No Ruanda, o Projeto de Resiliência Comunitária dos Vulcões, promovido pelo Conselho de Recursos Hídricos do Ruanda com o Banco Mundial e outros parceiros, combina controlo de cheias, recuperação de bacias hidrográficas, alerta precoce e capacitação. O BEI assinou 65 milhões de euros para o efeito em agosto de 2026. A sua combinação de questões relacionadas com a água, a terra e as comunidades espelha a coordenação multiinstitucional de que as reformas de irrigação necessitam.
Nestes regiões, as mesmas questões repetem-se: quanta água é realmente utilizada, quem mantém os novos ativos e como mostrar resultados.
Perfil do país anfitrião – Turquia
Istambul é a maior cidade da Turquia e um ponto de encontro entre a Ásia Central, a Europa e o Médio Oriente. As suas instalações para conferências, hotéis e ligações de transporte são adequadas para delegações de várias agências, e as equipas podem planear em conjunto longe das operações diárias.
A Turquia oferece parâmetros de referência úteis para a gestão de regadio. A Direção-Geral de Obras Hidráulicas Estatais (DSI) planeia e constrói os principais sistemas de irrigação e, a partir de 1993, com o apoio do governo e do Banco Mundial, transferiu a gestão de muitos sistemas para organizações de utilizadores de água. Uma revisão publicada pelas Academias Nacionais dos EUA relatou que estas organizações geriam 91% dos sistemas de irrigação construídos pela DSI, com indicadores de desempenho melhores do que antes da transferência, mas também que gastavam apenas uma pequena parte dos seus orçamentos em manutenção. Tanto o sucesso como a lacuna de manutenção são diretamente relevantes para os novos órgãos distritais de serviços de água do Uzbequistão. O Projeto da Anatólia do Sudeste (GAP) no Eufrates e no Tigre, planeado com 22 barragens, 19 centrais hidroelétricas e cerca de 1,82 milhões de hectares de irrigação, demonstra a escala do planeamento ao nível da bacia.
As viagens são diretas para delegações usbeques. A Uzbekistan Airways opera serviços diretos diários entre Tashkent e Istambul, e outras companhias aéreas também fazem a rota; verifique os horários atuais ao reservar. A Turquia introduziu a entrada sem visto para titulares de passaportes comuns do Usbequistão em 2018, e o Kun.uz relatou uma permissão de até 90 dias; os participantes devem confirmar as regras atuais com a Embaixada da Turquia em Tashkent antes de viajar. Meados de março são habitualmente amenos em Istambul e as datas ocorrem após o Ramadão e o Eid al-Fitr em 2027.
Entregas da Formação em Gestão de Recursos Hídricos
A Risalat fornece um serviço completo antes, durante e após o programa para que os participantes possam concentrar-se na aprendizagem e no planeamento.
Antes do programa
- Avaliação prévia dos participantes
- Avaliação de Prontidão para a Gestão de Recursos Hídricos
- Pacote de Recursos para a Gestão de Recursos Hídricos
- Materiais de leitura preparatória
- Apoio e aconselhamento gratuitos em matéria de vistos
Durante o programa
- Recolha no aeroporto e apoio de boas-vindas
- Alojamento com pequeno-almoço: 6 noites, entrada a domingo, 14 de março de 2027, saída a sábado, 20 de março de 2027 (uma noite antes e uma noite depois do programa)
- Jantar de boas-vindas e networking
- Kit de formação Risalat (saco, garrafa, caneca, t-shirt, boné, capa de passaporte, canetas, bloco de notas, íman e porta-chaves)
- Manual de Formação em Gestão Abrangente de Recursos Hídricos
- Water Balance Template
- Canal Prioritisation Matrix
- Measurement and Reporting Plan Template
- Lista de Verificação de Auditoria Energética de Bombagem
- Service Agreement Outline
- Calculadora de Orçamento e Taxas de O&M
- Workshops práticos e simulações
- Discussões de grupo e aprendizagem entre pares
- Almoço e pausas para café diários
- Acesso total às instalações do local de formação
- Mini tablet com materiais de aprendizagem digitais
- Visita de campo (quando aplicável)
- Passeio recreativo pela cidade
Depois do programa
- Certificado de Conclusão
- Prémio Risalat de Reconhecimento da Participação no Programa
- Materiais de referência pós-formação
- Modelo de Regras de Alocação em Caso de Seca
- 12-Month Institutional Action Plan
- Apoio pós-formação e orientação de acompanhamento
- Relatório do programa
Ministérios, entidades de serviços de água e unidades de projetos também podem solicitar este programa como um curso interno personalizado, estruturado em torno das suas próprias bacias, canais e projetos, ministrado em inglês ou russo. Solicite uma proposta personalizada e a Risalat desenhá-la-á com a sua equipa.
Desafios Comuns na Gestão de Recursos Hídricos e Como Esta Formação Ajuda
How can we explain why actual withdrawals exceed the plan?
A lacuna decorre habitualmente da falta de medição, limites pouco claros e libertações informais. O 1.º dia constrói um balanço hídrico que mostra onde surge a diferença e o 3.º dia acrescenta os pontos de medição necessários para a monitorizar todos os meses.
Como decidimos que canais revestir primeiro?
Os orçamentos de revestimento são limitados e as perdas variam por troço. O workshop do Dia 2 classifica os troços por água poupada, energia poupada e custo, produzindo uma justificação que um comité de direção pode aprovar.
How can pumping costs be reduced without cutting supply?
A irrigação por bombeamento utiliza cerca de 16% da eletricidade do Uzbequistão, segundo o World Bank. O Dia 3 aborda auditorias energéticas, programação de bombas e opções de reabilitação que reduzem os kWh por metro cúbico fornecido.
Como devem os novos órgãos distritais de serviços de água trabalhar com os agricultores?
A autonomia financeira traz deveres para os utilizadores. O Dia 4 aborda acordos de serviço, padrões de serviço e cobrança de taxas, utilizando lições internacionais da transferência de gestão de irrigação.
Como mantemos os novos canais conservados após o término do projeto?
Experience in Türkiye and elsewhere shows maintenance spending often falls short. Day 4 builds an asset register and O&M budget linked to cost recovery.
Como as questões ambientais e sociais podem ser tratadas sem atrasar as obras?
Tree cutting, encroachment and land issues can stall subprojects. Day 4 practises screening, management plans and grievance handling so issues are resolved early.
Como nos prepararmos para anos com muito menos água?
With water availability expected to fall by 30–40%, Day 5 develops drought trigger levels and allocation rules that can be agreed before a dry season starts.
Perguntas frequentes
O que é a gestão dos recursos hídricos?
It is the planning, allocation, measurement and financing of water so that a basin's limited supply meets farming, cities, energy and the environment over time. For irrigation agencies it covers water balances, allocation rules, canal efficiency, metering, user organisations, maintenance funding and drought planning.
Who should attend this water resource management training?
Funcionários dos ministérios da água e da agricultura, gestores de serviços de água de bacias e distritos, pessoal de unidades de implementação de projetos do Banco Asiático de Desenvolvimento e do Banco Mundial de projetos de irrigação, especialistas em salvaguardas e aquisições, gestores de estações de bombagem e líderes de associações de utilizadores de água.
Que projetos são utilizados como estudos de caso?
Principalmente o Projeto Nacional de Irrigação e Melhoria da Eficiência Energética financiado pelo Banco Mundial no Uzbequistão (P504600) e o projeto de Gestão Adaptativa dos Recursos Hídricos na Bacia do Mar de Aral do BAD, com casos regionais do Nepal, Bangladeche e Ruanda.
Porque é que a formação é realizada em Istambul?
Istambul tem voos diretos de Tashkent e entrada fácil para cidadãos uzbeques, e a experiência da Turquia na transferência da gestão de irrigação para organizações de usuários de água oferece lições práticas para novos órgãos de serviços de água de distrito.
O programa pode ser ministrado internamente ou em russo?
Yes. Institutions can request a tailored in-house version built around their own basins and projects, with delivery in English or Russian, through Risalat's proposal form.
Quem Ministrará Este Programa
Cada data é ministrada por uma equipa designada da rede de peritos da Risalat para este tema. Para este programa, designamos:
Como os escolhemos: Experiência na região dos participantes ou em contextos comparáveis; Domínio das regras dos financiadores aplicáveis (Banco Mundial, BAD, AfDB, UE, ONU) quando relevante; Lecionamento em inglês; outros idiomas a pedido para grupos internos; Sem conflito de interesses com as instituições dos participantes.
Cursos de formação em IstambulEnergy and Water training courses
Porquê Istambul para este programa
Istambul situa-se entre a Europa e a Ásia, com voos diretos a partir da maioria das capitais e vistos fáceis para muitas delegações.
O programa de Formação em Gestão de Recursos Hídricos em Istambul, em março de 2027, reúne funcionários e profissionais da região da Europa e Ásia e de outros locais. As sessões combinam breves exposições, estudos de caso e trabalho de grupo sobre os ficheiros dos próprios participantes, podendo as instituições da cidade ser adicionadas como visita de estudo a pedido.
Como chegar: Aeroporto de Istambul (IST).
Verifique se precisa de visto com o Verificador de Vistos gratuito e peça uma carta-convite depois de se inscrever.
O mesmo tema noutras cidades
- Inscrição de Beneficiários Deslocados por Desastres e Sistemas de Proteção de Dados em Istambul (Istambul)
- Reparação de Fugas em Tubagens de Redes de Água Municipais e Desinfeção de Poços em Istambul (Istambul)
- Urban Road Patching, Debris Removal and Municipal Drainage Repair in Istanbul (Istanbul)
- Agricultural Crop Pest Surveillance and Phytosanitary Lab Systems in Istanbul (Istanbul)
- Urban Flood Resilience and Municipal Drainage Planning in Istanbul (Istanbul)
- Avaliação E&S de Grandes Projetos de Irrigação e Auditorias de Reassentamento em Istambul (Istambul)
Outros programas em Istambul
- Mini Degree in Environmental and Social Safeguards in Istanbul
- Formação em IA para Contratação Pública e Gestão de Contratos em Istambul
- Auditoria Interna Baseada no Risco no Setor Público em Istambul
- AI Governance, Ethics and Risk in Istanbul
- Social Registry Dynamic Expansion and Shock-Triggered Cash Delivery in Istanbul
Teams often travel here from Pakistan, Afghanistan, Mongolia, Kazakhstan, Uzbekistan, Kyrgyzstan, Tajikistan, Turkmenistan. Funding, visa letters and group rates are explained on each country page.
Para equipas e instituições
Traga a sua equipa
Teams that learn together apply more at work. Tell us how many people and how you would like to take part: we reply with a group quote within two working days.
Watch: this programme in short
Outras datas e cidades para este assunto: Cursos de treinamento em gestão de abastecimento de água e saneamento (96 datas futuras).
Mais cursos de formação na Turquia · Todos os programas na Europa · Calendário de formação completo
Planear este programa num roteiro: porque importa, porque o aprovar, as datas a planear e a carreira que constrói.



