Énergie et eauProgramme de 5 jours

Formation à la gestion des ressources en eau à Istanbul

Dates15–19 mars 2027
LieuIstanbul, Türkiye
LieuCommuniqué à l'inscription
S'inscrire avant le3 févr. 2027

Points clés

Dates
15–19 mars 2027 (5 jours)
Lieu
Shared on registration, Istanbul, Türkiye
Frais par participant
3 850 £ (GBP)
Paiement
Sur facture et par virement bancaire
Clôture des inscriptions
3 févr. 2027
Format
5-day short course: a practical capacity-building programme for government, NGO and project teams in Istanbul
Certificat
Certificat de participation
Sur cette page 17 sections

Présentation du programme

In short: Water resource management is the planning, allocation, measurement and financing of water so that a basin’s limited supply meets farming, cities, energy and the environment without exhausting it. For an irrigation agency it means knowing how much water enters each canal, where it is lost, who receives it, what it costs to deliver and how the system will cope with drought. This five-day programme turns those principles into working tools for ministries, project units and district water service bodies.

Water Resource Management Training in Istanbul is designed for the teams now carrying out Central Asia’s largest irrigation reforms. In Uzbekistan, the World Bank’s press release on the National Irrigation and Energy Efficiency Improvement Project (P504600) notes that agriculture uses about 90% of the country’s water, that about 2.4 million hectares (56% of irrigated land) depend on pumps, and that some 1,700 pumping stations consume around 7.2 billion kWh a year, roughly 16% of national electricity use. The same source expects water availability to fall by 30–40% while irrigation demand rises by about 25%.

Subproject documents show what this means on the ground. A June 2026 initial environmental examination for the R8 canal system in Khorezm, prepared under the ADB-financed Climate Adaptive Water Resources Management in the Aral Sea Basin Sector Project (53120-001), reports irrigation efficiency of about 40% in the area and water withdrawals above plan in every year from 2019 to 2022, by 65%, 19%, 24% and 48%. The works aim to raise system conveyance efficiency from about 0.56 to 0.80 across a command area of 19,992 hectares.

Les institutions changent en même temps. Le programme national de gestion des ressources en eau et de développement de l'irrigation pour 2025–2028, approuvé en août 2025, confirme 159 organes de « services d'approvisionnement en eau » de district formés à partir des anciens départements d'irrigation de district dotés d'une plus grande autonomie financière, prévoit des compteurs sur 5 200 pompes, des systèmes numériques sur 12 000 puits d'observation et un centre de formation sectoriel de 200 places. De nouveaux organes, de nouveaux compteurs et de nouvelles règles de financement nécessitent tous un personnel capable de les utiliser.

The programme brings these threads together: basin planning and allocation, irrigation efficiency, water accounting, pumping energy, user organisations, environmental and social risk, cost recovery and climate adaptation, all applied through the procedures of ADB- and World Bank-financed projects.

The Programme Strengthens Institutional Capability

  • Principes de gestion intégrée des ressources en eau appliqués aux bassins irrigués
  • Basin water balances and seasonal allocation plans
  • Limites des ressources en eau, plans de prélèvement et règles d'allocation en période de sécheresse
  • Analyse de l'efficacité de l'irrigation au niveau des canaux, du système et des champs
  • Canal lining and modernisation investment choices
  • Pumping station energy audits and efficiency planning
  • Service agreements between water service bodies and users
  • Water user associations and participatory management
  • Operation and maintenance planning and asset registers
  • Water fees, cost recovery and O&M budgeting
  • Environmental and social risk screening for irrigation works
  • Environmental management plans and grievance mechanisms
  • Climate risk, drought preparedness and adaptation planning
  • Cadres de résultats et indicateurs pour les projets d'irrigation

The result is a team that can show where its water goes and plan each season with evidence.

  1. Intrants
  2. Activités
  3. Produits
  4. Effets
  5. Impact
Des intrants à l'impactCe programme suit les étapes suivantes : intrants, extrants, résultats (mis en évidence).Des indicateurs sont définis à chaque niveau, ce qui permet de vérifier les progrès bien avant que l'impact ne soit visible.

L'importance croissante de la gestion des ressources en eau

Money for irrigation modernisation is arriving faster than the systems to manage it. The World Bank’s USD 200 million credit for P504600, with USD 23.2 million of government co-financing, will concrete-line 259 km of eight primary canals linked to the Amu Darya and Syr Darya, build about 470 hydraulic structures and install gated outlets with flowmeters and a SCADA system across five regions. The Bank expects water losses to fall by about 540 million cubic meters a year and electricity use by more than 165 million kWh a year.

ADB’s Aral Sea Basin sector project, recorded at about USD 154 million including grant resources, finances climate-adaptive irrigation and drainage in the Amu Darya and Zarafshan basins. Its subproject documents also list an output to strengthen the capacity of water management organisations and water consumer associations on infrastructure management and water use efficiency. A draft Uzbekistan 2030 strategy, reported in January 2026, notes that 66% of the 18,700 km of main and inter-farm canals still have earthen beds.

Les organisations ont de plus en plus besoin de professionnels capables de :

  • Building basin and system water balances from field data
  • Setting and enforcing withdrawal limits by canal and season
  • Comparing planned and actual withdrawals and explaining the gap
  • Prioritising canal sections for lining using loss and cost data
  • Running energy audits on pumping stations
  • Designing service agreements with water users
  • Soutenir les associations d'usagers de l'eau pour recouvrer les redevances et entretenir les actifs
  • Preparing O&M budgets linked to asset condition
  • Screening irrigation works for environmental and social risk
  • Preparing drought response and allocation rules
  • Rapports sur les résultats par rapport aux indicateurs de laBAD et de la Banque mondiale

De robustes systèmes de gestion des ressources en eau aident les organisations à :

  • Deliver the water savings that financiers and government expect
  • Reduce electricity bills for pumped irrigation
  • Allocate water fairly between upstream and downstream users
  • Plan for dry years before they arrive
  • Protect new canal assets through proper maintenance
  • Give farmers a reliable and predictable service
  • Réussir les audits grâce à des registres clairs de l'eau et des flux financiers
  • Attract further investment and private operators

Le revêtement des canaux n'économise l'eau que lorsque quelqu'un mesure les débits avant et après, ajuste les allocations et entretient le canal. Cette formation construit cette chaîne de preuves, du point de mesure jusqu'au rapport ministériel.

Prélèvements d'eau supérieurs aux prévisions, réseau du canal R8, Khorezm (Ouzbékistan)
201965% above plan
202019% above plan
202124% above plan
202248% above plan

Source: ADB Climate Adaptive Water Resources Management in the Aral Sea Basin Sector Project, R8 subproject initial environmental examination (June 2026)

Testez-vous 3 questions rapides

1. Quelle est, grosso modo, la part de l'électricité de l'Ouzbékistan consommée par les stations de pompage pour l'irrigation ?

2. What irrigation efficiency does the June 2026 assessment report for the R8 canal area in Khorezm?

3. Combien d'organismes de « services d'approvisionnement en eau » de district le programme de l'eau 2025-2028 de l'Ouzbékistan décrit-il ?


Who Should Attend This Water Resource Management Training?

Ce programme s'adresse à :

  • Hauts fonctionnaires des ministères des Ressources en eau et de l'Agriculture
  • Responsables de l'administration des bassins et des irrigations régionales
  • Responsables et ingénieurs des organismes de services d'eau de district
  • Project implementation unit directors and coordinators
  • PIU engineers, monitoring and evaluation specialists
  • Spécialistes des sauvegardes environnementales et sociales
  • Procurement and contract management staff of water projects
  • Pumping station managers and energy engineers
  • Water user association leaders and federation staff
  • Responsables des finances et des tarifs responsables des budgets d'exploitation et de maintenance (O&M)
  • Planning and climate adaptation officers
  • Supervision consultants and design engineers
  • PPP unit staff and private operators of water facilities

Les équipes mixtes d'une même institution en tirent le plus grand profit.

Ce programme convient-il à votre équipe ?

Cochez ce que votre équipe doit être capable de faire.

Cochez les éléments qui s'appliquent

Water Resource Management Training Objectives

Upon successful completion of this Water Resource Management Training, participants will be able to:

  • Explain integrated water resource management in a basin context
  • Build a simple water balance for a canal system
  • Draft seasonal allocation and drought rules
  • Calculate conveyance and field application efficiency
  • Classer les options de modernisation des canaux par économies d'eau et de coûts
  • Design a measurement and water accounting plan
  • Identify energy savings in pumping stations
  • Prepare a service agreement between a water service body and users
  • Planifier le soutien aux associations d'usagers de l'eau
  • Screen subprojects for environmental and social risk
  • Préparer un plan budgétisé d'exploitation et de maintenance ainsi qu'un plan de recouvrement des coûts.
  • Rendre compte des résultats dans le format attendu par les bailleurs de fonds

Each objective is linked to a workshop output, so participants leave with drafts they can finish at home.


Contenu et structure du programme

Votre parcours de 5 jours touchez un jour pour voir les sessions
    • Integrated water resource management: principles and practice
    • Le bassin comme unité de planification : exemples de l'Amou-Daria et du Syr-Daria
    • Building a basin and system water balance
    • Usages concurrents : irrigation, eau potable, énergie et écosystèmes
    • Withdrawal limits and seasonal allocation planning
    • Why actual withdrawals exceed plans: causes and controls
    • National strategies: the 2025–2028 programme and 2030 targets
Contenu détaillé jour par jour

The five days move from the basin to the canal, the pump, the user and the financier.

  • Day 1: basin planning, water balances and allocation
  • Jour 2 : efficacité de l'irrigation et modernisation des canaux
  • Day 3: water accounting, measurement and pumping energy
  • Day 4: water service bodies, users, finance and risk
  • Day 5: climate adaptation, project delivery and action plans

Contenu détaillé jour par jour

Premier jour | Planification des bassins et allocation de l'eau

  • Integrated water resource management: principles and practice
  • Le bassin comme unité de planification : exemples de l'Amou-Daria et du Syr-Daria
  • Building a basin and system water balance
  • Usages concurrents : irrigation, eau potable, énergie et écosystèmes
  • Withdrawal limits and seasonal allocation planning
  • Why actual withdrawals exceed plans: causes and controls
  • National strategies: the 2025–2028 programme and 2030 targets
  • Rôles des ministères, des organismes de bassin et des services de district

Atelier : Lecture d'un bilan hydrique

Teams receive a simplified data set modelled on a canal system where withdrawals ran above plan for four years. They build a water balance, identify where the difference between plan and use arises, and propose three allocation rules for the next season. Results are compared and discussed against the limits each team works with at home.

Second Day | Irrigation Efficiency and Canal Modernisation

  • Conveyance, distribution and field application efficiency
  • Mesure des pertes : infiltrations, fuites opérationnelles et utilisation non autorisée
  • Canal lining: where it pays and where it does not
  • Ouvrages hydrauliques, exutoires vannés et régulation des flux
  • Alimentation par gravité versus pompage : compromis de conception
  • Drainage, salinité et engorgement
  • Asset condition surveys and prioritisation
  • Lessons from World Bank and ADB canal modernisation

Workshop: Prioritising Canal Sections for Lining

Using loss estimates, command areas and cost figures, teams rank ten canal sections for investment. They test how the ranking changes when energy savings from reduced pumping are included, and prepare a one-page justification suitable for a project steering committee.

Third Day | Water Accounting, Measurement and Pumping Energy

  • Water accounting concepts: inflow, consumption and return flow
  • Flow measurement methods for canals and outlets
  • Compteurs de pompes, compteurs d'électricité et qualité des données
  • SCADA, télémétrie et puits d'observation numérique
  • Audits énergétiques des stations de pompage et indicateurs d'efficacité
  • From data to decisions: dashboards and monthly reports
  • Vérification des économies revendiquées par les projets
  • Data governance between agencies and districts

Atelier : conception d'un plan de mesure

Each team designs a measurement and reporting plan for one canal system with a pumping station. The plan sets measuring points, frequencies, responsibilities and a monthly report format, and shows how the data will prove the water and energy savings a financier expects to see.

Quatrième jour | Organismes de services, utilisateurs, finances et risques

  • Organismes de services d'eau dotés d'une autonomie financière : rôles et responsabilisation
  • Accords de service et normes de service pour les usagers de l'eau
  • Associations d'usagers de l'eau : création, gouvernance et fédérations
  • Transfert de la gestion de l'irrigation : leçons internationales
  • O&M budgets, asset registers, fees and cost recovery
  • PPP management of water facilities: oversight and contracts
  • Environmental and social screening under ADB and World Bank policies
  • Mécanismes de recours, questions d'indemnisation des terres et des arbres
  • Participation des femmes à la gestion de l'eau

Case Study: Strengthening Water User Organisations

Participants study a regional irrigation project where a review found that farmer organisations needed more support to take over operation and maintenance, and where grievance resolution lagged behind target. Teams design a support package covering training, fee collection, maintenance planning and grievance handling for their own context.

Fifth Day | Climate Adaptation and Project Delivery

  • Climate projections and reduced water availability
  • Drought preparedness plans and trigger levels
  • Flood risk and early warning in river basins
  • Cadres de résultats et indicateurs pour les projets d'irrigation
  • Procurement and contract oversight for canal works
  • Supervision, quality control and handover
  • Reporting to ADB and the World Bank
  • Building a 12-month institutional action plan

Capstone Exercise: A Water Management Improvement Plan

Teams combine the week’s outputs into one improvement plan for their organisation: an allocation rule, a measurement plan, a canal priority list, a user support package and an O&M budget outline. Each plan is presented to a panel, which tests whether the actions are realistic, costed and linked to project indicators.


Water Resource Management Training Methodology

The training is built around documents participants use at work: water balances, allocation plans, environmental assessments and results frameworks, with short inputs followed by exercises on realistic data.

Le programme associe :

  • Short expert presentations with clear frameworks
  • Case studies from ADB- and World Bank-financed projects
  • Exercices de bilan hydrique, d'efficacité et de priorisation des canaux
  • Measurement and reporting plan design
  • Pumping energy audit practice
  • Role plays between service bodies and water users
  • Environmental and social screening exercises
  • Revue par les pairs des travaux d'équipe
  • Un plan de synthèse présenté devant un jury

Sessions can be supported in English and Russian where the group needs it. Facilitators adapt examples to the participants’ basins and projects, and every tool is shared in editable form.


Visites techniques et programme sur site

Lorsqu'un organisme d'accueil le confirme à l'avance, le programme comprend une visite d'une demi-journée d'une installation d'infrastructure hydraulique dans la région d'Istanbul pour observer la mesure, le contrôle et la maintenance en fonctionnement. Les organismes d'accueil sont confirmés pour chaque cohorte ; si aucune visite n'est possible, une session d'étude de cas approfondie sur l'expérience de la gestion de l'irrigation en Türkiye la remplace.


Résultats attendus

Upon completion of this Water Resource Management Training, participants will be able to:

  • Présenter un bilan hydrique pour leur propre système
  • Explain the gap between planned and actual withdrawals
  • Propose allocation and drought rules for the next season
  • Rank canal investments using loss, energy and cost data
  • Set up a measurement and monthly reporting routine
  • Identify quick energy savings at pumping stations
  • Support water user associations with a clear package
  • Screen subprojects for environmental and social risk
  • Rendre compte des progrès conformément aux exigences des bailleurs de fonds

Participants also return with a 12-month action plan agreed within their team.

Planifiez les places de votre équipe

3 850 £ par participant · facture et virement bancaire · réduction pour les groupes de 5 personnes ou plus

1participant(s)
3 850 £au tarif standard

Les inscriptions se terminent dans 72 jours (3 févr. 2027)


Institutional Application of Water Resource Management Training

Ce programme aide les organisations à renforcer :

  • Planification de l'allocation de l'eau à l'échelle des bassins et des districts
  • Water accounting and data management
  • Canal and pump asset management
  • Energy management in pumped irrigation
  • Service delivery to farmers
  • Water user association support
  • Financement de l'O&M et recouvrement des coûts
  • Gestion des risques environnementaux et sociaux
  • Project monitoring and reporting
  • Contractor and PPP oversight

Les participants repartent avec des outils pratiques pour améliorer :

  • Water balance templates
  • Allocation and drought rule formats
  • Matrices de priorisation des canaux
  • Measurement plan templates
  • Listes de contrôle pour l'audit énergétique des pompes
  • Service agreement outlines
  • O&M budget and fee calculators
  • Environmental and social screening checklists

Institutions that want to identify skill gaps before nominating staff can use Risalat’s training needs assessment or the institutional capacity assessment. For a wider view of Uzbekistan’s situation, read our article on water resource management in Uzbekistan.


Pertinence régionale & mise en application

Asie centrale

Uzbekistan is the main focus. The World Bank’s P504600 targets canal losses and pumping energy in Karakalpakstan, Bukhara, Kashkadarya, Namangan and Surkhandarya, while ADB’s Aral Sea Basin project works in the Amu Darya and Zarafshan basins. The R8 assessment in Khorezm shows the core management problem: withdrawals above plan, low efficiency and a need to prove savings. A procurement concern raised with ADB in early 2026 was referred to its procurement and integrity offices, a reminder that contract processes need the same care as hydraulics.

Asie du Sud

In Nepal, the World Bank approved USD 137 million in May 2025 for the third phase of the Rani Jamara Kulariya irrigation modernisation (P507433), bringing year-round irrigation to 17,500 more hectares in Kailali and including support for the water users association. The December 2024 review of the previous phase reported 629 hectares of new irrigated area against a 2,000-hectare target and only 29.4% of grievances resolved against a 60% target. In Bangladesh, a proposed ADB loan of USD 150 million for adaptive river system management (59172-001) would rehabilitate about 104 km of riverbanks under a preliminary environmental Category A.

Afrique

In Rwanda, the Volcanoes Community Resilience Project, promoted by the Rwanda Water Resources Board with World Bank and other partners, combines flood control, catchment restoration, early warning and capacity building. The EIB signed EUR 65 million for it in August 2026. Its mix of water, land and community issues mirrors the multi-agency coordination that irrigation reforms need.

Dans toutes ces régions, les mêmes questions reviennent : quelle est la quantité d'eau réellement consommée, qui entretient les nouveaux actifs et comment démontrer les résultats.


Profil du pays d'accueil – Türkiye

Istanbul is Türkiye’s largest city and a meeting point between Central Asia, Europe and the Middle East. Its conference facilities, hotels and transport links suit multi-agency delegations, and teams can plan together away from daily operations.

Türkiye offers useful benchmarks for irrigation management. The General Directorate of State Hydraulic Works (DSI) plans and builds the main irrigation systems, and from 1993, with government and World Bank support, it transferred the management of many systems to water user organisations. A review published by the US National Academies reported that these organisations managed 91% of DSI-built irrigation systems, with performance indicators better than before transfer, but also that they spent only a small share of their budgets on maintenance. Both the success and the maintenance gap are directly relevant to Uzbekistan’s new district water service bodies. The Southeastern Anatolia Project (GAP) on the Euphrates and Tigris, planned with 22 dams, 19 hydropower plants and about 1.82 million hectares of irrigation, shows the scale of basin-level planning.

Travel is straightforward for Uzbek delegations. Uzbekistan Airways has operated daily direct services between Tashkent and Istanbul, and other carriers also fly the route; check current schedules when booking. Türkiye introduced visa-free entry for ordinary Uzbek passport holders in 2018, and Kun.uz reported an allowance of up to 90 days; participants should confirm current rules with the Embassy of Türkiye in Tashkent before travel. Mid-March is usually mild in Istanbul and the dates fall after Ramadan and Eid al-Fitr in 2027.


Water Resource Management Training Deliverables

Risalat provides a complete service before, during and after the programme so participants can focus on learning and planning.

Avant le programme

  • Pré-évaluation des participants
  • Évaluation de l'état de préparation à la gestion des ressources en eau
  • Water Resource Management Resource Pack
  • Lectures préparatoires
  • Aide et conseils gratuits pour le visa

Pendant le programme

  • Accueil à l'aéroport & assistance à l'arrivée
  • Hébergement avec petit-déjeuner : 6 nuits, arrivée le dimanche 14 mars 2027, départ le samedi 20 mars 2027 (une nuit avant et une nuit après le programme)
  • Dîner de bienvenue et de réseautage
  • Kit de formation Risalat (sac, gourde, mug, t-shirt, casquette, protège-passeport, stylos, carnet, magnet & porte-clés)
  • Comprehensive Water Resource Management Training Manual
  • Water Balance Template
  • Canal Prioritisation Matrix
  • Measurement and Reporting Plan Template
  • Liste de contrôle pour l'audit énergétique des pompes
  • Service Agreement Outline
  • Calculateur de budget d'O&M et de redevances
  • Ateliers pratiques & simulations
  • Discussions de groupe & apprentissage entre pairs
  • Déjeuner et pauses-café quotidiens
  • Accès complet aux installations du lieu de formation
  • Mini tablette avec supports pédagogiques numériques
  • Visite de terrain (le cas échéant)
  • Visite récréative de la ville

Après le programme

  • Certificat de participation
  • Distinction Risalat de participation au programme
  • Documents de référence après la formation
  • Drought Allocation Rule Template
  • 12-Month Institutional Action Plan
  • Accompagnement après la formation & conseils de suivi
  • Rapport du programme

Ministries, water service bodies and project units can also request this programme as a tailored in-house course built around their own basins, canals and projects, delivered in English or Russian. Request a tailored proposal and Risalat will design it with your team.


Common Challenges in Water Resource Management, And How This Training Helps

How can we explain why actual withdrawals exceed the plan?

The gap usually comes from missing measurement, unclear limits and informal releases. Day 1 builds a water balance that shows where the difference arises, and Day 3 adds the measuring points needed to track it each month.

How do we decide which canals to line first?

Les budgets de chemisage sont limités et les pertes varient selon les sections. L'atelier du Jour 2 classe les sections par eau économisée, énergie économisée et coût, produisant une justification qu'un comité de pilotage peut approuver.

How can pumping costs be reduced without cutting supply?

Pumped irrigation uses about 16% of Uzbekistan’s electricity according to the World Bank. Day 3 covers energy audits, pump scheduling and rehabilitation choices that cut kWh per cubic metre delivered.

Comment les nouveaux organismes de services d'eau de district doivent-ils travailler avec les agriculteurs ?

L'autonomie financière apporte des devoirs aux utilisateurs. Le jour 4 couvre les accords de service, les normes de service et la collecte des redevances, en utilisant les leçons internationales du transfert de gestion de l'irrigation.

How do we keep new canals maintained after the project ends?

Experience in Türkiye and elsewhere shows maintenance spending often falls short. Day 4 builds an asset register and O&M budget linked to cost recovery.

How can environmental and social issues be handled without delaying works?

Tree cutting, encroachment and land issues can stall subprojects. Day 4 practises screening, management plans and grievance handling so issues are resolved early.

How do we prepare for years with much less water?

With water availability expected to fall by 30–40%, Day 5 develops drought trigger levels and allocation rules that can be agreed before a dry season starts.


Questions fréquentes

Qu'est-ce que la gestion des ressources en eau ?

It is the planning, allocation, measurement and financing of water so that a basin's limited supply meets farming, cities, energy and the environment over time. For irrigation agencies it covers water balances, allocation rules, canal efficiency, metering, user organisations, maintenance funding and drought planning.

Who should attend this water resource management training?

Officials of water and agriculture ministries, basin and district water service managers, PIU staff of ADB and World Bank irrigation projects, safeguards and procurement specialists, pumping station managers and water user association leaders.

Quels projets sont utilisés comme études de cas ?

Mainly Uzbekistan's World Bank-financed National Irrigation and Energy Efficiency Improvement Project (P504600) and ADB's Climate Adaptive Water Resources Management in the Aral Sea Basin project, with regional cases from Nepal, Bangladesh and Rwanda.

Pourquoi la formation a-t-elle lieu à Istanbul ?

Istanbul has direct flights from Tashkent and easy entry for Uzbek citizens, and Türkiye's experience transferring irrigation management to water user organisations offers practical lessons for new district water service bodies.

Le programme peut-il être dispensé en interne ou en russe ?

Yes. Institutions can request a tailored in-house version built around their own basins and projects, with delivery in English or Russian, through Risalat's proposal form.

Who Will Deliver This Programme

Each date is delivered by a team assigned from Risalat's expert network for this subject. For this programme we assign:

Lead facilitatorA senior energy and water specialist with at least 10 years of practice on public-sector and donor-financed projects, who has done the work this programme teaches (Water Resource Management Training) and trained teams in it.
Practitioner co-facilitatorA current or recent practitioner from a project implementation unit, agency or consulting team, who brings live cases, documents and the mistakes to avoid.
Guest speakersWhere the programme allows, specialists from host-country institutions or financed projects who explain how the system works in practice.
Programme coordinatorA Risalat coordinator who handles the pre-assessment, logistics, visas and the follow-up after the programme.

How we choose them: Experience in the region of the participants or comparable settings; Command of the financier rules that apply (World Bank, ADB, AfDB, EU, UN) where relevant; Delivery in English; other languages on request for in-house groups; No conflict of interest with participants' institutions.

Cours de formation à IstanbulEnergy and Water training courses

Pourquoi Istanbul pour ce programme

Istanbul se trouve entre l'Europe et l'Asie, avec des vols directs depuis la plupart des capitales et un visa facile à obtenir pour de nombreuses délégations.

The Water Resource Management Training in Istanbul programme in March 2027 brings together officials and professionals from across the Europe and Asia region and beyond. Sessions combine short inputs, case studies and group work on participants' own files, and the city's institutions can be added as a study visit on request.

Accès : aéroport d'Istanbul (IST).

Vérifiez si vous avez besoin d'un visa avec le vérificateur de visa gratuit, et demandez une lettre d'invitation une fois inscrit.

Le même thème dans d'autres villes

Autres programmes à Istanbul

Teams often travel here from Pakistan, Afghanistan, Mongolia, Kazakhstan, Uzbekistan, Kyrgyzstan, Tajikistan, Turkmenistan. Funding, visa letters and group rates are explained on each country page.

Pour les équipes et les institutions

Bring your team

Teams that learn together apply more at work. Tell us how many people and how you would like to take part: we reply with a group quote within two working days.

How

No commitment. Invoices to your institution; payment from project or training budgets.

Watch: this programme in short

Autres dates et villes pour ce sujet : Formations en gestion de l'approvisionnement en eau et de l'assainissement (96 dates à venir).

Plus de formations en Türkiye · Tous les programmes en Europe · Calendrier complet des formations

Plan this programme in a roadmap: why it matters, why to approve it, the dates to plan and the career it builds.

Ce que comprennent les frais

Aide au visa (gratuite)
Évaluation des participants
Accueil à l'aéroport
Hébergement
Wi-Fi
Dîner de bienvenue
Petit-déjeuner
Kit d'atelier
Supports du programme
Experts du programme
Activités pratiques
Déjeuner
Pauses-café
Atelier interactif
Plan de la ville & itinéraires
T-shirt Risalat (offert)
Visite de terrain
Certificat du programme
Visite récréative
Rapport du programme
Fee per participant£3,850Register →