跳至正文
Diagnostic Centre90 free tools: diagnostics, builders, planners, visa check · freeFree
关于我们
培训项目
Approach in Action
Blueprints
诊断免费
洞察
联系方式

首页 › Diagnostic Centre › Template Library for Donor-Financed Projects

Free templates · project teams

Template Library for Donor-Financed Projects

76 templates in Risalat format (.docx: opens in Microsoft Word, Apple Pages and Google Docs) that project staff use every day, in the office and on site: GCF concept notes and funding proposals, procurement plans and evaluation reports, IFRs and reconciliations, results frameworks, grievance logs, ESMPs, site diaries and payment certificates. Each follows a named financier requirement or standard, and the sources are checked every month.

  • 76 templates
  • 9 areas
  • Word format
  • Sources checked monthly
Climate finance and GCFOfficeGCF concept note working draftPlan a Green Climate Fund concept note section by section: climate rationale, the six investment criteria, financing, risks and readiness, before you fill in the official form.Follows: GCF Simplified Approval Process funding proposal and concept noteSources checked November 2026.docx Download →气候融资与 GCF办公室GCF 资助提案大纲(4.0版结构)当前 GCF 资助提案的结构,A至G节,每个叙述部分的字数限制,以及每节的撰写人、审阅人和截止日期。遵循:GCF 资助提案模板(各节字数限制)资料来源核实于 2026 年 11 月.docx 下载 →Climate finance and GCFOfficeClimate rationale and theory of change worksheetBuild the causal chain reviewers look for: climate problem, barriers, outputs, outcomes and paradigm shift, with the assumptions and the GCF results indicators.Follows: GCF Funding Proposal template (word limits per section)Sources checked November 2026.docx Download →Climate finance and GCFOfficeGender assessment and action planThe gender assessment summary and costed action plan that GCF and most climate funds ask for, with sex-disaggregated indicators and responsibilities.Follows: GCF Funding Proposal template (word limits per section)Sources checked November 2026.docx Download →Climate finance and GCFOfficeProject preparation funding request worksheetList the studies a climate proposal still needs (feasibility, ESIA, gender assessment, economic analysis), their cost and timing, before applying for preparation funding.Follows: GCF Funding Proposal template (word limits per section)Sources checked November 2026.docx Download →Climate finance and GCFOfficeAnnual performance report worksheet (climate fund project)Collect what an annual performance report to a climate fund needs: progress on indicators and activities, covenants, safeguards, gender, finance and changes.Follows: GCF Funding Proposal template (word limits per section)Sources checked November 2026.docx Download →Climate finance and GCFOfficeAdaptation finance tracking sheet (MDB three-step method)Record which parts of a project count as adaptation finance: vulnerability context, statement of intent and the direct link to activities and costs.Follows: Joint MDB approach to tracking climate finance (adaptation: three-step method).docx Download →Proposals and bidsOfficeExpression of interest for consulting servicesAn EOI structured the way development bank shortlisting works: core business, years, similar assignments with value and client, and technical and managerial capability. Key experts are usually not scored at this stage.Follows: World Bank Procurement Regulations and Standard Procurement DocumentsSources checked November 2026.docx Download →Proposals and bidsOfficeTechnical proposal for consulting services (TECH forms checklist)Plan a full technical proposal in the order of the standard request for proposals: submission form, experience, comments on the ToR, approach and work plan, schedule, team and CVs.Follows: World Bank Procurement Regulations and Standard Procurement DocumentsSources checked November 2026.docx Download →Proposals and bidsOfficeFinancial proposal for consulting services (FIN forms)A financial proposal laid out like the standard forms: summary of costs, remuneration by expert and reimbursable expenses, with checks against the technical proposal.Follows: World Bank Procurement Regulations and Standard Procurement DocumentsSources checked November 2026.docx Download →Proposals and bidsOfficeKey expert CV (development bank format)A CV in the order evaluators score it: position, education, employment record, and a table of assignments that show adequacy for this specific assignment.Follows: World Bank Procurement Regulations and Standard Procurement DocumentsSources checked November 2026.docx Download →建议书与投标办公室逻辑框架矩阵(欧盟格式)欧盟赠款和服务建议书中使用的干预逻辑矩阵:影响、成果和产出,配有指标、基线、目标、来源和假设。遵循:欧盟合同程序实用指南(PRAG)及其附件.docx 下载 →Proposals and bidsOfficeGrant budget (EU budget headings)A grant budget laid out in the EU headings, with unit, number of units and unit value, and the indirect cost and contingency lines.Follows: EU Practical Guide to contract procedures (PRAG) and its annexes.docx Download →Proposals and bidsOfficeImplementing partner capacity assessmentAssess or prepare for a partner capacity review in the areas UN agencies look at: organisation, programme management, finance, assets, reporting and procurement.Follows: UN Harmonized Approach to Cash Transfers (HACT): micro-assessment.docx Download →ProcurementOfficeProcurement plan (STEP fields)A procurement plan with the fields STEP asks for: method, market approach, review, estimate and planned dates for each step, so it can be entered in STEP without rework.Follows: World Bank STEP (Systematic Tracking of Exchanges in Procurement)Sources checked November 2026.docx Download →ProcurementOfficeProcurement strategy summary (PPSD)The short version of a Project Procurement Strategy for Development: context, market, risks, options and the recommended approach per main contract.Follows: World Bank Procurement Regulations and Standard Procurement DocumentsSources checked November 2026.docx Download →采购办公室技术规格符合性表逐行比较要求与各投标人的实际响应,并标明其在投标书中的对应页码。遵循:世界银行采购法规和标准采购文件资料核查于2026年11月.docx 下载 →ProcurementOfficeRequest for quotations (small goods)A request for quotations for small purchases: items, delivery, validity, payment, how quotes are compared, and a comparison table for at least three quotes.Follows: World Bank Procurement Regulations and Standard Procurement DocumentsSources checked November 2026.docx Download →ProcurementOfficeBid opening recordThe record read out and signed at a public bid opening: bidders, prices, discounts, alternatives, bid security, withdrawals and modifications.Follows: World Bank Procurement Regulations and Standard Procurement DocumentsSources checked November 2026.docx Download →ProcurementOfficeBid evaluation report (goods and works)A full evaluation report: preliminary examination, qualification, detailed evaluation, corrections, comparison and recommendation, ready for prior review.Follows: World Bank Procurement Regulations and Standard Procurement DocumentsSources checked November 2026.docx Download →ProcurementOfficeConsultant selection evaluation sheets (QCBS)Individual and summary technical scoring sheets with sub-criteria, and the combined quality and cost score.Follows: World Bank Procurement Regulations and Standard Procurement DocumentsSources checked November 2026.docx Download →ProcurementOfficeEvaluation committee declaration of impartialityA declaration each evaluator signs before seeing the bids: no conflict of interest, confidentiality and what to do if a conflict appears.Follows: World Bank Procurement Regulations and Standard Procurement Documents.docx Download →ProcurementOfficeContract register and management trackerOne line per contract: value, dates, deliverables, payments, variations, securities and their expiry, and performance, so nothing lapses unnoticed.Follows: World Bank STEP (Systematic Tracking of Exchanges in Procurement)Sources checked November 2026.docx Download →ProcurementSiteGoods received and inspection certificateRecord delivery, inspection and acceptance of goods against the contract, with shortages and defects, signed by the receiving committee.Follows: World Bank Procurement Regulations and Standard Procurement DocumentsSources checked November 2026.docx Download →Financial managementOfficeInterim financial report (IFR)A quarterly or semester IFR: sources and uses of funds for the period and cumulative, uses by component against budget, and the designated account statement.Follows: World Bank Disbursement Handbook for clientsSources checked November 2026.docx Download →Financial managementOfficeDesignated account reconciliationReconcile the advance to the designated account with what has been documented and what is still outstanding, with the explanation of each difference.Follows: World Bank Disbursement Handbook for clientsSources checked November 2026.docx Download →Financial managementOfficeStatement of expenditure (SOE) and withdrawal summaryList eligible payments by disbursement category to document an advance or claim reimbursement, with the contract and payment references auditors check.Follows: World Bank Disbursement Handbook for clientsSources checked November 2026.docx Download →Financial managementOfficeAnnual work plan and budget (AWPB)Plan activities, outputs, quarters, costs and funding source for the year, linked to the procurement plan and the results framework.Follows: World Bank Disbursement Handbook for clientsSources checked November 2026.docx Download →Financial managementOfficeSix-month cash forecastForecast payments by month and source for the next six months, to size the advance or the next withdrawal application.Follows: World Bank Disbursement Handbook for clientsSources checked November 2026.docx Download →Financial managementOffice and siteFixed asset registerRecord each asset bought with project funds: tag, location, custodian, cost, source and condition at the last physical check.Follows: UN Harmonized Approach to Cash Transfers (HACT): micro-assessment.docx Download →Financial managementOffice and siteTravel authorisation and expense claimApprove a trip before it starts and settle it after: purpose, itinerary, per diem, advance, actual costs and receipts.Follows: UN Harmonized Approach to Cash Transfers (HACT): micro-assessment.docx Download →Financial managementOfficeAudit and management letter trackerFollow every audit finding to closure: rating, agreed action, owner, deadline and evidence that it is fixed.Follows: World Bank Disbursement Handbook for clientsSources checked November 2026.docx Download →Monitoring, evaluation and reportingOfficeResults framework and monitoring planThe results framework financiers expect: objective and intermediate indicators with baseline, yearly targets, frequency, source, method and responsibility.Follows: USAID Performance Indicator Reference Sheet (ADS 201, archived guidance).docx Download →Monitoring, evaluation and reportingOfficeIndicator reference sheet (PIRS)One page per indicator: definition, unit, disaggregation, data source, collection method, frequency, data quality limits, baseline and targets.Follows: USAID Performance Indicator Reference Sheet (ADS 201, archived guidance).docx Download →Monitoring, evaluation and reportingOffice and siteData quality assessment checklistCheck an indicator against the five data quality standards: validity, integrity, precision, reliability and timeliness, and plan the fixes.Follows: USAID ADS 201: data quality standards (archived guidance).docx Download →Monitoring, evaluation and reportingOfficeQuarterly progress report to the financierA short progress report: summary, progress by component against plan, indicators, procurement, finance, safeguards, risks and decisions needed.Follows: EU grant contract: interim narrative report template.docx Download →Monitoring, evaluation and reportingSiteField monitoring visit reportWhat was checked on site, what was found, evidence (photos, documents, interviews) and agreed follow-up actions.Follows: EU grant contract: interim narrative report template.docx Download →Monitoring, evaluation and reportingOfficeTerms of reference for an evaluationToR for a mid-term or final evaluation using the six OECD DAC criteria, with an evaluation matrix, methods, deliverables and team profile.Follows: OECD DAC evaluation criteria (relevance, coherence, effectiveness, efficiency, impact, sustainability).docx Download →Monitoring, evaluation and reportingOffice and siteLessons learned and after-action reviewA 45-minute structured review after a milestone, mission or incident: what was planned, what happened, why, and what we will change.Follows: OECD DAC evaluation criteria (relevance, coherence, effectiveness, efficiency, impact, sustainability).docx Download →Monitoring, evaluation and reportingOfficeManagement response to an evaluation or missionRespond to each recommendation from an evaluation, audit or supervision mission: agree or not, action, owner, date, and progress.Follows: OECD DAC evaluation criteria (relevance, coherence, effectiveness, efficiency, impact, sustainability).docx Download →Environmental and socialOffice and siteEnvironmental and social management plan (ESMP) matrixImpacts, mitigation, who does it, when, cost, and how it is monitored: the core table of every ESMP and contractor ESMP.Follows: World Bank Environmental and Social Framework (ESS1 to ESS10)Sources checked November 2026.docx Download →Environmental and socialOffice and siteGrievance register (GRM log)Record and track every complaint from receipt to closure, with channels, categories, deadlines and whether the complainant was satisfied.Follows: World Bank Environmental and Social Framework (ESS1 to ESS10)Sources checked November 2026.docx Download →Environmental and socialOfficeStakeholder identification and engagement planIdentify affected and interested parties, including vulnerable groups, and plan how, when and in which language each is engaged (ESS10).Follows: World Bank Environmental and Social Framework (ESS1 to ESS10)Sources checked November 2026.docx Download →Environmental and socialSitePublic consultation recordEvidence that a consultation took place: purpose, information shared, attendance by sex, questions raised, answers given and follow-up.Follows: World Bank Environmental and Social Framework (ESS1 to ESS10)Sources checked November 2026.docx Download →Environmental and socialSiteEnvironmental, social, health and safety incident notificationFirst notification of an incident: what happened, classification, immediate actions and who was told, within the deadline in your ESCP.Follows: World Bank Environmental and Social Framework (ESS1 to ESS10)Sources checked November 2026.docx Download →Environmental and socialOffice and siteIncident investigation and corrective action planFind the root cause of an incident (five whys) and agree corrective and preventive actions with owners and dates.Follows: World Bank Environmental and Social Framework (ESS1 to ESS10)Sources checked November 2026.docx Download →Environmental and socialSiteContractor monthly environmental, social and OHS reportThe monthly figures a supervising engineer and PIU need from a contractor: workforce, safety statistics, training, inspections, grievances and non-conformities.Follows: World Bank Environmental and Social Framework (ESS1 to ESS10)Sources checked November 2026.docx Download →Environmental and socialSiteWorker code of conduct acknowledgementThe commitments every worker signs on a financed site, including the prohibition of SEA and SH, with the reporting channels and consequences.Follows: World Bank Environmental and Social Framework (ESS1 to ESS10)Sources checked November 2026.docx Download →Environmental and socialSiteAffected household census and asset inventoryRecord each household and asset affected by land acquisition (ESS5): occupants, land, structures, crops and trees, livelihoods and vulnerability, on the cut-off date.Follows: World Bank Environmental and Social Framework (ESS1 to ESS10)Sources checked November 2026.docx Download →Environmental and socialOfficeEntitlement matrix (land acquisition and resettlement)Set out, for each type of loss and each category of affected person, the compensation and assistance they are entitled to.Follows: World Bank Environmental and Social Framework (ESS1 to ESS10)Sources checked November 2026.docx Download →Works supervision and siteSiteSite daily diaryThe engineer's daily record that later settles claims: weather, labour, plant, work done, instructions, visitors, delays and safety.Follows: FIDIC Conditions of Contract for Construction (Red Book, 2017 edition)Sources checked November 2026.docx Download →Works supervision and siteSiteEngineer's site instructionA written instruction to the contractor with the contract clause, whether it is a variation, the effect on time and cost, and acknowledgement.Follows: FIDIC Conditions of Contract for Construction (Red Book, 2017 edition)Sources checked November 2026.docx Download →Works supervision and siteSiteNon-conformance report (NCR)Record work, materials or practices that do not meet the specification, the required correction, and its verification and close-out.Follows: FIDIC Conditions of Contract for Construction (Red Book, 2017 edition)Sources checked November 2026.docx Download →Works supervision and siteOffice and siteInterim payment certificate summaryCalculate the amount due to a works contractor: work done to date, variations, price adjustment, retention, advance recovery and previous certificates.Follows: FIDIC Conditions of Contract for Construction (Red Book, 2017 edition)Sources checked November 2026.docx Download →Works supervision and siteOffice and siteVariation request and valuationJustify, value and approve a change to a contract: reason, scope, cost and time effect, cumulative variations, and financier no-objection where needed.Follows: FIDIC Conditions of Contract for Construction (Red Book, 2017 edition)Sources checked November 2026.docx Download →Works supervision and siteSiteHealth and safety site inspection checklistA weekly walk-round checklist: PPE, excavations, work at height, traffic, electricity, welfare, first aid and community safety.Follows: World Bank Environmental and Social Framework (ESS1 to ESS10)Sources checked November 2026.docx Download →Works supervision and siteOffice and siteMonthly progress report (works contract)The monthly report a works contract asks for: progress against programme, resources, quality, safety, environment, delays, payments and photos.Follows: FIDIC Conditions of Contract for Construction (Red Book, 2017 edition)Sources checked November 2026.docx Download →Works supervision and siteSiteTaking-over inspection and defects listRecord the joint inspection before taking over: outstanding work and defects, deadlines within the defects notification period, and sign-off.Follows: FIDIC Conditions of Contract for Construction (Red Book, 2017 edition)Sources checked November 2026.docx Download →Project office and HROfficeTerms of reference for an individual consultantToR for an individual consultant: background, objective, tasks, deliverables with dates, reporting, qualifications and the selection criteria.Follows: World Bank Procurement Regulations and Standard Procurement DocumentsSources checked November 2026.docx Download →Project office and HROffice and siteConsultant timesheetMonthly time record by day and task, signed by the consultant and the supervisor, as required for time-based contracts.Follows: World Bank Procurement Regulations and Standard Procurement DocumentsSources checked November 2026.docx Download →Project office and HROffice and siteMission or back-to-office reportReport a mission in one or two pages: purpose, people met, findings, agreements and follow-up actions.Follows: EU grant contract: interim narrative report template.docx Download →Project office and HROffice and siteMeeting minutes and action trackerMinutes that drive action: decisions, owners and dates, with last meeting's actions checked first.Follows: EU grant contract: interim narrative report template.docx Download →项目办公室与人力资源办公室项目风险登记册追踪风险的可能性、影响、评分、所有者、应对措施和趋势,每月审查一次。遵循:欧盟合同程序实用指南(PRAG)及其附件.docx 下载 →Project office and HROfficeStaff handover noteHand over a role without losing knowledge: open tasks, deadlines, contacts, files, passwords to reset and assets.Follows: UN Harmonized Approach to Cash Transfers (HACT): micro-assessment.docx Download →Project office and HRSiteVehicle log bookRecord every trip and refuelling for project vehicles: purpose, kilometres, driver and fuel, which auditors check against fuel payments.Follows: UN Harmonized Approach to Cash Transfers (HACT): micro-assessment.docx Download →Project office and HROfficeStaff attendance and leave recordA monthly record of attendance, leave and field days per staff member, used to support payroll charged to the project.Follows: UN Harmonized Approach to Cash Transfers (HACT): micro-assessment.docx Download →Training and capacityOfficeTraining needs surveyA short survey for staff and managers: tasks, confidence, priority skills and preferred formats..docx Download →Training and capacityOfficeNomination formOne page for the employer to nominate a participant, with approval and funding lines..docx Download →培训与能力办公室工作坊议程(5天)一份包含时间安排、方法和每日反思的实用五天议程。.docx 下载 →Training and capacityOfficePre- and post-testA ten-question test structure to measure learning before and after training..docx Download →培训与能力办公室培训后评估表带评分量表和评论的反应与学习问题。.docx 下载 →Training and capacityOfficeIndividual action planThree changes each participant commits to, with dates, support needed and a 90-day check..docx Download →Training and capacityOfficeTOR for a training providerTerms of reference to buy training: objectives, scope, deliverables, timeline, qualifications and payment..docx Download →Training and capacityOfficeStudy visit planObjectives, hosts, daily programme, logistics and reporting for an exposure visit..docx Download →Training and capacityOfficeAttendance sheetDaily attendance with signature columns, for donor reporting..docx Download →Training and capacityOfficeTraining completion reportA report structure for the client or donor: what was delivered, results, evidence and next steps..docx Download →

No template matches. Try another word, or ask us for one.

如何使用这些模板。每个模板都是由Risalat编写的工作草案。它遵循卡片和文件中命名的资助方或标准已发布要求的结构,并链接到官方来源。您的融资协议、征求建议书或合同中的版本始终具有最高效力:请在提交前进行核对。

Need it done, not just the template?We set up procurement, financial management, M&E and safeguards systems for project teams, and train the people who run them. Request a proposal →