Home › Financed projects › Nigeria
Front End Engineering Design (FEED) for Nigeria Morocco Gas Pipeline (NMGP) – Nigeria Segment
In short: Front End Engineering Design (FEED) for Nigeria Morocco Gas Pipeline (NMGP) – Nigeria Segment is a project financed by the Islamic Development Bank in Nigeria (US$29.8 million, approved February 2025, closing February 2027). It is in the final stretch before closing.
What the project is about
The proposed project aims at preparing the studies and design needed for the construction works of the gas pipeline and improving its bankability to attract potential international sponsors from the private sector.
Project summary, the Islamic Development Bank
Project facts
| Project | Front End Engineering Design (FEED) for Nigeria Morocco Gas Pipeline (NMGP) – Nigeria Segment (XM-DAC-46025-ISDB-NGA1038) |
|---|---|
| Country | Nigeria |
| Financier | the Islamic Development Bank |
| Commitment | US$29.8 million |
| Start | February 2025 |
| Planned end | February 2027 |
| Status | Active |
Where projects at this stage usually need help
Projects in their last 18 months usually concentrate on completing contracts, final audits, evidence of results, the implementation completion report and handing over what was built so it keeps working.
- Completing and closing contracts
- Final audits and financial close
- Results evidence for the completion report
- Handover and sustainability of assets and systems
Facts from the Islamic Development Bank’s published aid data (IATI): XM-DAC-46025-ISDB-NGA1038. Checked 29 November 2026. The needs above describe what projects at this stage typically face, not findings about this project.
How Risalat can support the team
Risalat works with project units and ministries as a consulting and implementation partner (a procurement, financial management, monitoring or safeguards desk working alongside the unit) and through practical training for the staff who carry the work.
Programmes on these subjects
- Rural Feeder Road Engineering and Low-Volume Sealed Pavement Design in Cape Town
- Water Treatment Process Engineering & Urban Pipeline Quality Supervision in Muscat
- Rural Feeder Road Engineering & Climate-Resilient Culvert Design in Nadi
Free tools the team can use today
- Problem Tree and Objective Tree Builder
- Paris Alignment and Climate Readiness Assessment
- Climate Finance Practice Test
Free mini report for this project's team: where projects at this stage usually get stuck and how to stay on schedule, written for Front End Engineering Design (FEED) for Nigeria Morocco Gas Pipeline (NMGP) – Nigeria Segment.
Training for teams from Nigeria · All active financed projects in Nigeria · All free tools