Home › Financed projects › Albania
Project for Integrated Urban and Tourism Development (PIUTD)
In short: Project for Integrated Urban and Tourism Development (PIUTD) is a project financed by World Bank in Albania (US$71 million, approved November 2016, closing date July 2025 in the World Bank record), implemented by Albanian Development Fund. It is in the final stretch before closing.
What the project aims to do
The PDO of the proposed project is to improve urban infrastructure, enhance tourism assets, and strengthen institutional capacity to support tourism-related local economic development in selected areas in the south of Albania.
Project development objective, World Bank
Project facts
| Project | Project for Integrated Urban and Tourism Development (PIUTD) (P155875) |
|---|---|
| Country | Albania |
| Financier | World Bank |
| Commitment | US$71 million |
| Approved | November 2016 |
| Closing | July 2025 |
| Implementing agency | Albanian Development Fund |
| Main sector | Waste Management |
| Status | Active |
Where projects at this stage usually need help
Projects in their last 18 months usually concentrate on completing contracts, final audits, evidence of results, the implementation completion report and handing over what was built so it keeps working.
- Completing and closing contracts
- Final audits and financial close
- Results evidence for the completion report
- Handover and sustainability of assets and systems
- Works supervision, resettlement and road safety
Facts from the World Bank project database: P155875 on projects.worldbank.org. Checked 25 November 2026. The needs above describe what projects at this stage typically face, not findings about this project.
How Risalat can support the team
Risalat works with project units and ministries as a consulting and implementation partner (a procurement, financial management, monitoring or safeguards desk working alongside the unit) and through practical training for the staff who carry the work.
Programmes on these subjects
- Integrated Urban Drainage & Municipal Waste Infrastructure Operations in Istanbul
- Sub-National Industrial Cluster Planning and Local Economic Infrastructure in Cairo
- Electric Bus Fleet Integration and Urban Clean Transit Infrastructure in Istanbul
Free tools the team can use today
- Mega-Project PMO Maturity Assessment
- Utility Performance Blueprint (Power and Water)
- Certification Study Planner
Free mini report for this project's team: where projects at this stage usually get stuck and how to stay on schedule, written for Project for Integrated Urban and Tourism Development (PIUTD).
Training for teams from Albania · All active financed projects in Albania · All free tools