Points clés
- Dates
- 7–10 Jun 2027 (4 days)
- Lieu
- Nadi, Fidji
- Frais par participant
- 3 100 £ (GBP)
- Paiement
- Sur facture et par virement bancaire
- Clôture des inscriptions
- 8 May 2027
- Certificat
- Certificat de participation
- Option intra
- Organisez-le pour votre équipe, à vos dates
Sur cette page 13 sections
Présentation du programme
Labour-intensive public works programmes serve as vital mechanisms for poverty reduction and municipal asset creation in secondary towns and expanding urban centres. Delivering these interventions requires rigorous operational systems that balance rapid youth employment creation with standard civil engineering specifications. Project teams must effectively navigate community-level contracting, targeting protocols, and technical quality controls to ensure built assets remain resilient, fit for purpose, and beneficial to vulnerable populations across rapidly expanding urban settlements.
This intensive four-day professional course equips urban practitioners with field-tested frameworks for planning, implementing, and supervising municipal cash-for-works activities. Participants examine verified approaches to transparent beneficiary selection, worksite occupational health and safety, and social risk management aligned with international development bank environmental and social frameworks. Special emphasis is placed on structuring labour output norms, integrating basic business and life-skills coaching, and transitioning from paper-based muster rolls to secure, accountable digital wage disbursement channels.
Held in Nadi, Fiji, the programme brings together municipal practitioners, technical works supervisors, and social inclusion specialists to exchange operational strategies tailored to Pacific Island operational realities. Attendees examine the full lifecycle of labour-based infrastructure delivery, from initial subproject screening and community engagement through to asset handover and maintenance planning. The training provides the practical governance instruments required to prevent elite capture, reduce fiduciary vulnerabilities, and verify tangible public benefits across municipal works portfolios.
Rapid urbanisation and climate vulnerability across Pacific island nations place unprecedented strain on basic municipal services, pedestrian access networks, and local drainage systems, while youth underemployment persists as a major socio-economic challenge. Implementing agencies delivering public works under the Community Access and Urban Services Enhancement Project II require standardized operational tools to accelerate labour-intensive capital delivery, reinforce environmental and social risk safeguards, and institutionalise transparent wage transfer mechanisms that withstand fiduciary scrutiny.
Delivered by Risalat Consultants International in Nadi, Fiji, it combines expert-led sessions, real cases and group work, so that participants can apply what they learn in their own institution.
The Programme Strengthens Institutional Capability
- Planification et priorisation des infrastructures
- Évaluation ex ante des projets et études de rentabilité
- Options de financement et partenariats public-privé
- Passation des marchés et contrats de travaux
- Supervision et qualité des travaux
- Gestion et maintenance des actifs
- Développement durable et résilience
- Stakeholder and community engagement
It is designed for project managers and implementation specialists from the CAUSE Project, municipal council works coordinators and town engineers, social development and gender inclusion officers and others who want practical, current skills in infrastructure, urban development and partnerships.
The Growing Importance of Cash-for-Works Urban Infrastructure & Youth Public Works Delivery in Nadi
- Besoins en infrastructures et objectifs de service
- Planification et priorisation à long terme
- Rôles des administrations nationales et locales
- Lessons from completed projects
- Case discussion: a project that changed a city
- Analyse des options
- Coûts, avantages et risques
- Structure d'une étude de rentabilité
- Social and environmental considerations
- Exercise: options appraisal for a project
- Financement public et prêts des bailleurs
- Modèles de partenariat public-privé
- Répartition des risques et mécanismes de paiement
- Engagements budgétaires et transparence
- Exercise: risk allocation matrix
- Passation des marchés et contrats de travaux
- Supervision et qualité des travaux
- Maîtriser les délais, les coûts et les modifications
- Santé, sécurité et impacts sur les communautés
- Case study: recovering a delayed project
Les infrastructures et les services urbains façonnent la croissance, la santé et les perspectives. Les projets sont vastes, complexes et durables, et les faiblesses de planification, de financement ou de réalisation coûtent cher à corriger par la suite.
Les gouvernements combinent de plus en plus investissement public, partenariats avec le secteur privé et nouvelles technologies. Les équipes capables de planifier, d'évaluer, d'acheter et de gérer ces investissements obtiennent de meilleurs actifs et services.
Les organisations ont de plus en plus besoin de professionnels capables de :
- Planifier et prioriser les investissements d'infrastructure
- Évaluer les projets et préparer des études de rentabilité
- Choisir les modèles de financement et de réalisation
- Superviser les travaux en matière de délais, de coûts et de qualité
- Gérer les actifs tout au long de leur cycle de vie
Des systèmes solides en matière d'infrastructures, de développement urbain et de partenariats aident les organisations à :
- Choisir les bons investissements
- Livrer les projets dans les délais et le budget
- Attirer des financements et des partenaires
- Prolonger la durée de service des actifs
This Cash-for-Works Urban Infrastructure & Youth Public Works Delivery in Nadi programme brings these elements together in a practical format, so that participants understand not only what good practice looks like but also how to introduce it in their own setting, with the people and resources they have.
Who Should Attend This Cash-for-Works Urban Infrastructure & Youth Public Works Delivery in Nadi Training?
Ce programme s'adresse à :
- Project managers and implementation specialists from the CAUSE Project
- Municipal council works coordinators and town engineers
- Social development and gender inclusion officers
- Community liaison and public consultation coordinators
- Public works site supervisors and district technical officers
- Monitoring, evaluation, and beneficiary registry specialists
- Financial management officers overseeing cash transfers and wage disbursements
- Government agency focal points managing youth employment and urban social safety nets
- Planificateurs d'infrastructures et urbanistes
- Ingénieurs et responsables techniques
- Gestionnaires de projets et de programmes
- Personnel des unités PPP
Le programme convient aussi bien aux professionnels expérimentés qu’à ceux qui prennent de nouvelles responsabilités. Les groupes réunissant plusieurs institutions et pays sont encouragés, car les participants apprennent beaucoup de l’expérience des autres.
Cochez ce que votre équipe doit être capable de faire.
Cash-for-Works Urban Infrastructure & Youth Public Works Delivery in Nadi Training Objectives
Upon successful completion of this Cash-for-Works Urban Infrastructure & Youth Public Works Delivery in Nadi Training, participants will be able to:
- Design labour-based urban subprojects using technical output norms aligned with international civil engineering practices
- Establish robust, transparent beneficiary targeting and selection registries to mitigate inclusion and exclusion errors
- Implement comprehensive site-level occupational health, safety, and environmental mitigation measures in urban settlements
- Structure secure digital wage delivery architectures and reconciliation processes to ensure transparent cash transfers
- Integrate practical life-skills, financial literacy, and employability modules into public works delivery calendars
- Apply community contracting procedures and dispute management protocols to prevent local conflicts during execution
- Establish asset handover and community-based maintenance mechanisms that ensure the longevity of completed urban infrastructure
- Expliquer comment les infrastructures sont planifiées et priorisées
- Évaluer des projets et préparer une étude de rentabilité
- Comparer les modèles de financement et de réalisation, y compris les partenariats
Chaque objectif est mis en pratique pendant le programme à travers des exercices, des études de cas ou des travaux de groupe, afin que les participants repartent capables de le faire, et pas seulement de le décrire.
Contenu et structure du programme
Le programme se déroule sur 4 jours. Chaque journée associe apports d'experts, travaux pratiques et un atelier ou une étude de cas de clôture :
- Premier jour : planification et hiérarchisation des priorités
- Deuxième jour : évaluation et dossiers d'investissement
- Troisième jour : financement et partenariats
- Quatrième jour : exécution et supervision
Contenu détaillé jour par jour
Jour 1 | Planification et priorisation
- Besoins en infrastructures et objectifs de service
- Planification et priorisation à long terme
- Rôles des administrations nationales et locales
- Lessons from completed projects
- Case discussion: a project that changed a city
Atelier : planification et hiérarchisation des priorités, application à votre institution
En petits groupes, les participants appliquent les méthodes du jour à des exemples tirés de leurs institutions et conviennent d'étapes concrètes pour la suite.
Jour 2 | Évaluation ex ante et études de rentabilité
- Analyse des options
- Coûts, avantages et risques
- Structure d'une étude de rentabilité
- Social and environmental considerations
- Exercise: options appraisal for a project
Atelier : évaluation et dossiers d'investissement, application à votre institution
En petits groupes, les participants appliquent les méthodes du jour à des exemples tirés de leurs institutions et conviennent d'étapes concrètes pour la suite.
Jour 3 | Financement et partenariats
- Financement public et prêts des bailleurs
- Modèles de partenariat public-privé
- Répartition des risques et mécanismes de paiement
- Engagements budgétaires et transparence
- Exercise: risk allocation matrix
Étude de cas : financement et partenariats en pratique
Les participants analysent un cas réaliste, comparent les choix effectués aux bonnes pratiques et en tirent des enseignements applicables à leur propre contexte.
Jour 4 | Réalisation et supervision
- Passation des marchés et contrats de travaux
- Supervision et qualité des travaux
- Maîtriser les délais, les coûts et les modifications
- Santé, sécurité et impacts sur les communautés
- Case study: recovering a delayed project
Capstone Exercise: Cash-for-Works Urban Infrastructure & Youth Public Works Delivery in Nadi Action Plan for Your Institution
Les participants synthétisent la semaine dans un plan d'action pour leur institution, avec des priorités, des responsables et des premières étapes, puis le présentent à leurs pairs et aux animateurs pour recueillir leurs retours.
Cash-for-Works Urban Infrastructure & Youth Public Works Delivery in Nadi Training Methodology
The training uses interactive operational simulations, technical case studies of urban public works, and hands-on tool development. Participants work directly in teams to draft subproject screening matrices, safety inspection sheets, and wage payment workflows. Peer review sessions enable municipal engineers and social specialists to stress-test their procedures against standard donor compliance requirements, ensuring that frameworks developed during the course are directly applicable to ongoing municipal infrastructure operations.
Le programme associe :
- Sessions animées par des experts sur les pratiques actuelles
- Études de cas régionales et internationales
- Travaux de groupe et exercices pratiques
- Simulations et jeux de rôle le cas échéant
- Discussion des défis rencontrés par les participants dans l'exercice de leurs fonctions
- Apprentissage entre pairs, d'institutions et de pays différents
- Des outils et modèles pratiques à réutiliser au travail
- Réflexion quotidienne et plan d'action
Avant le programme, une courte pré-évaluation aide les animateurs à comprendre le rôle et les priorités de chaque participant, afin d’adapter les exemples et les exercices au groupe. Chaque journée se termine par une brève réflexion au cours de laquelle les participants notent ce qu’ils appliqueront dans leur travail.
- Fonds
- Entité
- Projet
- Résultats
- MRV
Résultats attendus
Upon completion of this Cash-for-Works Urban Infrastructure & Youth Public Works Delivery in Nadi Training, participants will be able to:
- Produce fully compliant, climate-resilient labour-based subproject designs and bills of quantities
- Manage objective, fraud-resistant beneficiary enrolment registries for vulnerable urban youth
- Deploy operational health and safety risk mitigation protocols across dispersed urban worksites
- Execute secure, fully reconciled digital wage transfer cycles adhering to donor standards
- Deliver synchronized life-skills and basic business training within routine public works schedules
- Execute formal municipal asset handover protocols with functional community maintenance plans
- Planifier et prioriser les investissements d'infrastructure
- Évaluer les projets et préparer des études de rentabilité
Les participants repartent avec un plan d'action personnel et des outils pratiques utilisables dans leur institution dès la première semaine de retour. Les institutions qui envoient plusieurs participants peuvent s'appuyer sur le programme pour convenir de méthodes et de modèles communs entre équipes, ce qui facilite la pérennité des améliorations.
3 100 £ par participant · facture et virement bancaire · remise pour les groupes de 5 personnes ou plus
Cinq personnes ou plus d'une même organisation : demandez le tarif de groupe lors de votre demande de facture.
À partir de dix participants, une version intra pour votre institution peut revenir moins cher par personne. Demander un devis intra.
Registration closes in 176 days (8 May 2027)
Institutional Application of Cash-for-Works Urban Infrastructure & Youth Public Works Delivery in Nadi Training
Ce programme aide les organisations à renforcer :
- Planification des investissements
- Évaluation ex ante des projets
- Gestion des partenariats
- Supervision des travaux
- Gestion des actifs
Les participants repartent avec des outils pratiques pour améliorer :
- Études de rentabilité
- Répartition des risques
- Gestion des contrats
- Planification de la maintenance
- Suivi des services
Le programme est conçu pour que l'apprentissage passe de la salle de formation à l'institution. Les participants travaillent, dans la mesure du possible, sur leurs propres processus et documents, et repartent avec un plan d'action que leurs responsables peuvent examiner et soutenir.
Pertinence régionale & mise en application
Europe
Les institutions européennes mettent en œuvre les infrastructures, le développement urbain et les partenariats dans des cadres réglementaires détaillés et des programmes de réforme. Les participants venus d'Europe peuvent comparer leurs pratiques avec celles de collègues d'autres régions et vérifier comment des méthodes éprouvées fonctionnent dans d'autres conditions.
Afrique
Partout en Afrique, les ministères, les agences et les équipes de projet qui travaillent dans les infrastructures, le développement urbain et les partenariats opèrent de plus en plus aux côtés de programmes financés par les bailleurs, qui exigent des systèmes clairs et des éléments probants. Le programme aide les participants à adapter les bonnes pratiques aux institutions et aux ressources avec lesquelles ils travaillent.
Moyen-Orient
Au Moyen-Orient, les stratégies nationales de développement et les plans de diversification imposent des exigences croissantes en matière d'infrastructures, de développement urbain et de partenariats. Les participants examinent comment bâtir, au sein des organismes publics et des entreprises, les capacités dont ces plans ont besoin.
Asie
Les institutions asiatiques conjuguent croissance rapide et programmes de modernisation ambitieux. Les participants venus d'Asie peuvent partager leur expérience du déploiement rapide de systèmes à grande échelle et découvrir les approches adoptées ailleurs.
Pacifique
Les petits États insulaires et du Pacifique sont confrontés à des contraintes particulières de taille, d'éloignement et de capacités. Le programme met en avant des approches pratiques et proportionnées des infrastructures, du développement urbain et des partenariats, adaptées aux institutions de plus petite taille.
Holding the programme in Nadi, Fiji brings participants together away from their daily pressures, so they can compare how infrastructure, urban development and partnerships is handled in different settings. The same programme can also be delivered in-house for one institution, in its own country or online, with cases taken from its current work.
Host Country Profile – Fiji
Programmes in Nadi suit professionals, government officials and project teams focused on climate resilience, public sector administration, regional logistics, and environmental protection.
Se former hors de son pays permet aux participants de se concentrer, de porter un regard neuf sur leur propre institution et de constituer un réseau avec des collègues d'autres pays.
Cash-for-Works Urban Infrastructure & Youth Public Works Delivery in Nadi Training Deliverables
Les participants sont accompagnés avant, pendant et après le programme, afin que la préparation, l'apprentissage et le suivi forment une expérience continue.
Avant le programme
- Pré-évaluation des participants
- Cash-for-Works Urban Infrastructure & Youth Public Works Delivery in Nadi Readiness Assessment
- Cash-for-Works Urban Infrastructure & Youth Public Works Delivery in Nadi Resource Pack
- Lectures préparatoires
- Aide et conseils gratuits pour le visa
Pendant le programme
- Accueil à l'aéroport & assistance à l'arrivée
- Hébergement avec petit-déjeuner
- Dîner de bienvenue et de réseautage
- Kit de formation Risalat (sac, gourde, mug, t-shirt, casquette, protège-passeport, stylos, carnet, magnet & porte-clés)
- Comprehensive Cash-for-Works Urban Infrastructure & Youth Public Works Delivery in Nadi Training Manual
- Modèle d'évaluation ex ante de projet
- Matrice de répartition des risques en PPP
- Liste de contrôle de la supervision des travaux
- Modèle de plan de gestion des actifs
- Ateliers pratiques & simulations
- Discussions de groupe & apprentissage entre pairs
- Déjeuner et pauses-café quotidiens
- Accès complet aux installations du lieu de formation
- Mini tablette avec supports pédagogiques numériques
- Visite de terrain (le cas échéant)
- Visite récréative de la ville
Après le programme
- Certificat de participation
- Distinction Risalat de participation au programme
- Documents de référence après la formation
- Liste de contrôle pour la revue des études de rentabilité
- Modèle de plan de maintenance
- Accompagnement après la formation & conseils de suivi
- Rapport du programme
Les institutions peuvent aussi demander une version intra sur mesure de ce programme, dispensée dans leurs locaux ou en ligne. Demander une proposition.
Common Challenges in Cash-for-Works Urban Infrastructure & Youth Public Works Delivery in Nadi, And How This Training Helps
Comment les institutions peuvent-elles planifier et hiérarchiser leurs investissements d'infrastructure ?
Le programme aborde directement ce point le premier jour (Planification et hiérarchisation des priorités) : les participants s'exercent aux méthodes concernées, les adaptent à leur propre institution, puis les intègrent à leur plan d'action.
Comment les institutions peuvent-elles évaluer des projets et préparer des dossiers d'investissement ?
Le programme aborde directement ce point le deuxième jour (Évaluation et dossiers d'investissement) : les participants s'exercent aux méthodes concernées, les adaptent à leur propre institution, puis les intègrent à leur plan d'action.
Comment les institutions peuvent-elles choisir leurs modèles de financement et d'exécution ?
Le programme aborde directement ce point le troisième jour (Financement et partenariats) : les participants s'exercent aux méthodes concernées, les adaptent à leur propre institution, puis les intègrent à leur plan d'action.
Comment les institutions peuvent-elles superviser les travaux en matière de délais, de coûts et de qualité ?
Le programme aborde directement ce point le quatrième jour (Exécution et supervision) : les participants s'exercent aux méthodes concernées, les adaptent à leur propre institution, puis les intègrent à leur plan d'action.
Comment les institutions peuvent-elles gérer leurs actifs tout au long de leur cycle de vie ?
Le programme aborde directement ce point le premier jour (Planification et hiérarchisation des priorités) : les participants s'exercent aux méthodes concernées, les adaptent à leur propre institution, puis les intègrent à leur plan d'action.
Questions fréquentes
When and where does the Cash-for-Works Urban Infrastructure & Youth Public Works Delivery in Nadi programme take place?
It runs from 7 Jun 2027 to 10 Jun 2027, in Nadi, Fiji. The registration deadline is shown at the top of this page.
Qui devrait participer ?
The programme is designed for project managers and implementation specialists from the CAUSE Project, municipal council works coordinators and town engineers, social development and gender inclusion officers, community liaison and public consultation coordinators, and others who want practical skills in infrastructure, urban development and partnerships.
Recevrai-je un certificat ?
Oui. Les participants qui terminent le programme reçoivent un certificat de participation délivré par Risalat Consultants International.
Ce programme peut-il être dispensé pour notre seule institution ?
Oui. Nous pouvons proposer une version intra sur mesure dans vos locaux, dans une autre ville ou en ligne, construite autour de vos propres cas. Utilisez la demande de proposition sur cette page.
Faut-il une expérience préalable en infrastructures, développement urbain et partenariats ?
Aucune formation spécialisée n'est requise au-delà d'une expérience dans une fonction similaire. Une courte pré-évaluation aide les animateurs à adapter les sessions au groupe.
Who Will Deliver This Programme
Each date is delivered by a team assigned from Risalat's expert network for this subject. For this programme we assign:
How we choose them: Experience in the region of the participants or comparable settings; Command of the financier rules that apply (World Bank, ADB, AfDB, EU, UN) where relevant; Delivery in English; other languages on request for in-house groups; No conflict of interest with participants' institutions.
Names and short CVs of the assigned experts are shared with registered participants and sponsoring organisations before the programme, on request. Are you an expert in this subject? Join our expert network.
Training courses in NadiCommunity Development training courses
Why Nadi for this programme
Nadi serves as the primary international transport hub for Fiji, offering straightforward flight connections across the Pacific region. Visiting delegations can examine transport infrastructure, regional aviation services, and local municipal operations. The area also provides exposure to coastal environmental management projects and sustainable tourism operations in surrounding districts.
The Cash-for-Works Urban Infrastructure & Youth Public Works Delivery in Nadi programme in June 2027 brings together officials and professionals from across the Oceania and the Pacific region and beyond. Sessions combine short inputs, case studies and group work on participants' own files, and the city's institutions can be added as a study visit on request.
Getting there: Nadi International Airport (NAN).
Vérifiez si vous avez besoin d'un visa avec le vérificateur de visa gratuit, et demandez une lettre d'invitation une fois inscrit.
Other programmes in Nadi
- Marine Spatial Planning and Inshore Coastal Fisheries Co-Management in Nadi
- Safe School Retrofitting and Resilient Educational Infrastructure in Nadi
- Health Facility Upgrading and Medical Waste System Compliance in Nadi
- Agribusiness Incubator Design and Smallholder Market Linkages in Nadi
- Emergency Bridge and Road Re-Opening Operations in Island States in Nadi
For teams and institutions
Bring your team
Teams that learn together apply more at work. Tell us how many people and how you would like to take part: we reply with a group quote within two working days.
Other dates and cities for this subject: Infrastructure, Roads and Transport Projects training courses (161 upcoming dates).
Plus de formations aux Fidji · Tous les programmes dans le Pacifique · Calendrier complet des formations
Plan this programme in a roadmap: why it matters, why to approve it, the dates to plan and the career it builds.



