Bataan-Cavite Interlink Bridge Project, Tranche 1

Philippinesthe Asian Development BankXM-DAC-46004-52310-002-LN4432US$650 million

In short: Bataan-Cavite Interlink Bridge Project, Tranche 1 is a project financed by the Asian Development Bank in the Philippines (US$650 million, approved December 2023, closing June 2027). It is in the final stretch before closing.

What the project is about

The BataanCavite Interlink Bridge (BCIB) project will provide a permanent road link between the provinces of Bataan and Cavite, the key missing link in the road network of NCR, Central Luzon and Carabarzon Regions. The BCIB will be approximately 32 km long, comprising two cable-stayed bridges with the main spans of 900 and 400 meters for navigation channels, 24 km of marine and land viaducts, and 5 km of approach roads.

Project summary, the Asian Development Bank

Project facts

ProjectBataan-Cavite Interlink Bridge Project, Tranche 1 (XM-DAC-46004-52310-002-LN4432)
CountryPhilippines
Financierthe Asian Development Bank
CommitmentUS$650 million
StartDecember 2023
Planned endJune 2027
StatusActive

Where projects at this stage usually need help

Projects in their last 18 months usually concentrate on completing contracts, final audits, evidence of results, the implementation completion report and handing over what was built so it keeps working.

Facts from the Asian Development Bank’s published aid data (IATI): XM-DAC-46004-52310-002-LN4432 and the financier’s project page. Checked 24 November 2026. The needs above describe what projects at this stage typically face, not findings about this project.

How Risalat can support the team

Risalat works with project units and ministries as a consulting and implementation partner (a procurement, financial management, monitoring or safeguards desk working alongside the unit) and through practical training for the staff who carry the work.

Free mini report for this project's team: where projects at this stage usually get stuck and how to stay on schedule, written for Bataan-Cavite Interlink Bridge Project, Tranche 1.

Ask for the mini report

Training for teams from the Philippines · All active financed projects in the Philippines · All free tools