Capability and practice
The team may need applied learning or coaching: practical work on its own files, so people can apply the rules and methods with confidence.
在任意页面按/键即可搜索 · 按Esc键关闭
需要经过核验的结果?申请由Risalat开展独立评估。
内容与本工具所衡量领域相匹配的近期培训项目。您的结果将显示哪些项目最适合您的薄弱环节。
数字的可靠程度取决于假设。默认值刻意设置为宽泛的占位值。发帖四周后,请用您自己数据分析中的平均值替换。
受监管或面向公众的行业通常需要更多的审核和审批时间。默认比例已显示,您可以修改。
可以。输入代理机构的小时费率区间和计划的内容组合,即可查看报价是否与计划所需工时相符。
信息来源核查时间:2026年11月。我们每月核查一次官方来源。
Update November 2026: The link no longer works (404). Replace it with the current official page. Source
以上为基于既定假设的估算,并非预测或基准。触达取决于主题、质量、时机以及平台变化,这些都是任何计算器无法预测的。请用您自己的数据替换默认值。
We use essential cookies to run this website securely. With your permission we also use cookies to remember your choices and to measure our advertising. To understand how the site is used we count visits with Google Analytics: in the EU, the UK and Switzerland only after you accept, elsewhere unless you reject it. You can change your choice at any time from “Cookie settings” at the bottom of every page. Privacy and cookie policy
Most likely fit
Also worth a look
Less indicated by this result
Bid document issued
Bids opened
Evaluation and award decision
Contract signed
Bid validity
Bid document issued late in {n} package(s): preparing specifications, estimates and documents is a skill the team can build.
Bid document issued late in {n} package(s): check internal clearance and prior review timing as well.
Bid opening moved in {n} package(s): check how addenda, clarifications and deadline extensions are approved.
Evaluation and award decision late in {n} package(s): check committee appointment, report approval and no-objection steps.
Evaluation and award decision late in {n} package(s): evaluation reports may need practice with real cases.
Contract signature late in {n} package(s): check signature approvals, securities and other dependencies.
Long gaps between stages in {n} package(s): look for steps that wait on another unit.
{x} late in {n} packages: a recurring pattern often points to a practice gap.
Evaluation outlasted the bid validity in {n} package(s): confirm extensions and their effect on bids before any award.
More than half of the bid validity used in {n} package(s): plan extensions before the deadline.
Bid preparation period below the minimum in {n} package(s): an independent check before award is advisable.
Signature soon after the award decision in {n} package(s): confirm the standstill period was respected.
{x}: {n}%
Matched from the type of tool, as this result has no scores by area.
Nothing in this result points here.
No clear gap in this result. If problems persist, a short conversation helps locate them.
Overall result: {n}%
Lowest areas: {x}
{n} package(s) analysed, {x} behind plan
{x}: late in {n} package(s)
Bid validity and rule flags: {n}
Score: {x}
Result: {x}
Please complete the highlighted fields.
Connection problem. Please try again.
Sending…
A work email helps us confirm your institution and reply faster. A personal address is accepted.
See your result ↓
Back to questions ↑
A late stage or a low score shows where time or quality is being lost. It does not, on its own, show why. The cards below suggest which kind of support is most likely to fit, so a first conversation starts in the right place.
The team may need applied learning or coaching: practical work on its own files, so people can apply the rules and methods with confidence.
The institution may need to review its steps, approvals and dependencies: who signs, in what order, how long each step takes and what waits on what.
Dates, deadlines or validity periods are under pressure. A verified independent assessment is advisable before acting, so decisions rest on confirmed facts.
Screening aid, not a verified assessment. The matching uses your answers and a few fixed rules. Our specialists confirm the cause with you before recommending anything.
A confirmation is on its way to your inbox.
The Risalat Brief: one short report a week on a real delivery problem in procurement, safeguards, M&E or public finance, its causes and what works. No adverts; unsubscribe any time.
订阅即表示您同意接收我们的简报。隐私政策