Datos clave
- Fechas
- 8–12 mar 2027 (5 días)
- Dónde
- Bellevue Park Hotel, Riga, Letonia
- Tarifa por participante
- 4.560 £ (GBP)
- Pago
- Mediante factura y transferencia bancaria
- Cierre de inscripciones
- 17 ene 2027
- Certificado
- Certificado de finalización
- Opción interna
- Impártalo para su equipo, en sus fechas
Descripción del programa
Renewable power is now the lowest-cost option for most new generation. IRENA’s Renewable Power Generation Costs in 2024 reports that 91% of newly commissioned utility-scale renewable capacity produced electricity more cheaply than the cheapest new fossil fuel alternative. The global weighted average cost was USD 0.034 per kWh for onshore wind and USD 0.043 per kWh for solar PV, and 582 GW of renewable capacity was added worldwide in 2024.
Low technology costs do not make a project bankable on their own. Developers and public agencies still have to secure land and permits, grid connections and revenue contracts, manage environmental and social risks and present a financial structure that lenders accept. IRENA notes that financing costs have pushed up costs for some technologies, which makes structuring skills even more important.
Latvia shows these issues in practice. Renewables supplied 43.2% of the country’s gross final energy consumption in 2023, according to the Official Statistics Portal, and the national target is 57% by 2030. Recent transactions include the 112 MW Smiltene wind farm, financed through a EUR 92 million package from the EBRD, the Nordic Investment Bank and Luminor Bank, and a 329 MW programme of hybrid solar parks with battery storage developed by Sunly and co-financed by the EBRD, the EIB and SEB.
This five-day Renewable Energy Technology Project Development and Finance Training in Riga takes participants through the full project cycle: market and policy context, site and permitting work, contracts, financial modelling, debt structuring, risk allocation and development finance. The final day combines a technical visit with a capstone investment committee exercise.
Throughout the week, participants work with real Baltic cases, including the Latvia-Estonia ELWIND offshore wind project and the grid investments that allowed the Baltic states to synchronise with the Continental European grid in February 2025.
El programa fortalece la capacidad institucional en
- Screening and prioritising renewable energy project pipelines
- Assessing wind, solar, hydro, biomass and storage options
- Managing site selection, land rights and permitting
- Planning grid connection and working with transmission and distribution operators
- Running public consultation and building local acceptance
- Applying environmental and social standards, including the IFC Performance Standards
- Structuring special purpose vehicles and project contracts
- Negotiating power purchase agreements and other revenue contracts
- Building and reviewing project finance models
- Sizing and sculpting debt to cash flow
- Allocating construction, operating, market and regulatory risks
- Using guarantees and blended finance from development banks
- Preparing information memoranda and lender due diligence
- Designing public support schemes and auctions
The programme balances technical, financial and institutional content, so that developers, lenders and public officials leave with a shared view of what a bankable project needs.
The Growing Importance of Renewable Energy Project Finance
The Baltic states completed their synchronisation with the Continental European grid on 9 February 2025, after disconnecting from the Russian-controlled system. Latvia’s transmission system operator, AS Augstsprieguma tīkls (AST), reports that it upgraded or rebuilt more than 500 km of high-voltage lines and installed synchronous compensators and large battery systems as part of the preparation. A stronger, integrated grid opens room for more wind and solar.
Finance is following. The EIB lent Latvenergo EUR 200 million over 15 years to modernise its distribution network and speed up the integration of renewables, and the Nordic Investment Bank agreed a EUR 230 million loan to Latvenergo covering solar parks, hydropower refurbishment and network work. The EBRD made its first direct renewable project financing in Latvia in 2025, with InvestEU guarantees supporting its lending.
Barriers remain. The IEA’s 2024 review of Latvia recommends removing bottlenecks in permitting and regulatory hurdles for new investment. In August 2026 the Latvian Cabinet rejected a planned wind park in South Kurzeme, citing a lack of repeated public consultation and differing views on building in the coastal protection zone. Projects that handle consultation, permitting and risk well are the ones that reach financial close.
Las organizaciones necesitan cada vez más profesionales capaces de:
- Assessing resource data and energy yield estimates
- Preparing feasibility studies that lenders accept
- Managing permitting and environmental impact assessment timelines
- Engaging communities and municipalities from the early stages
- Negotiating grid connection terms
- Structuring corporate and utility PPAs
- Building three-statement project finance models
- Running sensitivity, scenario and Monte Carlo analysis
- Sizing debt using debt service cover ratios
- Preparing documentation for development bank financing
- Applying IFC Performance Standards and Equator Principles requirements
- Evaluating hybrid and storage project economics
Strong renewable energy project finance systems help organisations:
- Reach financial close faster and with fewer surprises
- Lower the cost of capital through better risk allocation
- Attract development bank and commercial co-financing
- Reduce permitting and social acceptance delays
- Integrate projects smoothly into the grid
- Protect revenue against market price volatility
- Meet environmental and social requirements of lenders
- Build a repeatable pipeline of bankable projects
- Support national renewable and energy security targets
These skills matter for public agencies designing support schemes as much as for developers and lenders, because the quality of a project depends on the rules it is built under.
Who Should Attend This Renewable Energy Project Finance Training?
Este programa está dirigido a:
- Renewable energy project developers and project managers
- Investors, infrastructure fund managers and green fund analysts
- Commercial bank project and energy finance teams
- Development finance institution officers
- Ministry of energy and climate officials
- Energy regulators and market monitoring staff
- Transmission and distribution system operator planners
- State-owned utility investment and strategy teams
- Renewable energy agency and auction programme staff
- Unidades de asociaciones público-privadas
- Project implementation unit (PIU) staff on donor-funded energy projects
- Lawyers and contract managers working on energy projects
- Engineering, procurement and construction (EPC) contractors and suppliers
- Environmental and social specialists in the energy sector
- Consultants and transaction advisers
Participants do not need advanced finance training; modelling sessions start from first principles and build up step by step.
Marque lo que su equipo necesita ser capaz de hacer.
Renewable Energy Project Finance Training Objectives
Upon successful completion of this Renewable Energy Project Finance Training, participants will be able to:
- Explain current renewable technology costs and market trends
- Map the project development cycle from site to commercial operation
- Identify the main permitting, grid and social acceptance risks
- Describe the key project contracts and how they allocate risk
- Compare PPA structures and other revenue models
- Build a basic project finance model for a wind or solar project
- Size and sculpt debt using cover ratios
- Realizar análisis de sensibilidad, de escenarios y de Monte Carlo
- Explain how development banks, guarantees and blended finance support projects
- Apply the IFC Performance Standards in project preparation
- Prepare an investment case for lenders or an investment committee
The objectives follow the sequence of a real transaction, from early development to the decision to finance.
Source: IRENA, Renewable Power Generation Costs in 2024
1. What share of newly commissioned utility-scale renewable capacity in 2024 was cheaper than the cheapest new fossil alternative?
IRENA's Renewable Power Generation Costs in 2024 reports that 91% of new utility-scale renewable capacity had a lower cost than the cheapest new fossil option.
2. When did the Baltic states synchronise their power systems with the Continental European grid?
AST reports that Estonia, Latvia and Lithuania synchronised with Continental Europe on 9 February 2025.
3. What is Latvia's target for the renewable share of total final energy consumption by 2030?
The IEA's Latvia 2024 review cites a national target of 57% renewables in final consumption by 2030.
Contenido y estructura del programa
- Global renewable cost trends from IRENA’s 2024 data
- Electricity market basics: wholesale prices, balancing and capacity
- Baltic grid synchronisation and what it means for new projects
- Latvia’s NECP targets and renewable energy policy
- Wind, solar, hydro, biomass and storage technologies compared
- Hybrid parks and battery storage economics
- Key stakeholders: developers, utilities, TSOs, lenders, regulators
- Site selection, resource assessment and energy yield
- Land rights and lease agreements
- Environmental impact assessment and biodiversity studies
- Public consultation and municipal engagement
- Grid connection applications and agreements
- EPC, turbine supply and operations and maintenance contracts
- Shareholder agreements and SPV structures
- Structure of a project finance model
- Capital cost, operating cost and degradation assumptions
- Revenue modelling under PPAs and merchant exposure
- Financial statements and cash flow waterfall
- Capital structure: debt, equity and mezzanine
- Debt sizing with debt service cover ratios
- Debt sculpting and reserve accounts
- Utility, corporate and virtual PPAs
- Price, volume and shape risk in revenue contracts
- Contracts for difference and auction-based support
- Construction, technology and operating risks
- Grid curtailment and balancing cost risks
- Insurance, guarantees and credit enhancement
- Role of the EBRD, EIB and NIB in Baltic renewables
- Morning technical visit to a renewable energy or grid site
- Discussion with project teams on development and financing challenges
- Debrief on lessons from the visit
- Sensitivity and scenario analysis on the Day 3 model
- Introduction to Monte Carlo analysis for yield and price risk
- Preparing an investment memorandum
- Presenting to an investment or credit committee
Contenido completo día a día
The week follows the life of a renewable energy transaction from market context to the financing decision.
- Day 1: markets, technologies and project pipelines
- Day 2: site development, permitting and contracts
- Day 3: financial modelling and debt structuring
- Day 4: revenue contracts, risk and development finance
- Day 5: technical visit and investment decision
Contenido completo día a día
First Day | Energy Transition, Markets and Project Pipelines
- Global renewable cost trends from IRENA’s 2024 data
- Electricity market basics: wholesale prices, balancing and capacity
- Baltic grid synchronisation and what it means for new projects
- Latvia’s NECP targets and renewable energy policy
- Wind, solar, hydro, biomass and storage technologies compared
- Hybrid parks and battery storage economics
- Key stakeholders: developers, utilities, TSOs, lenders, regulators
- Public support schemes and renewable auctions
- Screening criteria for a project pipeline
Workshop: Screening a Renewable Project Pipeline
Teams receive profiles of six illustrative wind, solar and hybrid projects with different resource, grid and permitting conditions. They score each project against technical, commercial and social criteria, select two to advance and explain the evidence that would be needed before committing development funds.
Second Day | Site Development, Permitting and Project Contracts
- Site selection, resource assessment and energy yield
- Land rights and lease agreements
- Environmental impact assessment and biodiversity studies
- Public consultation and municipal engagement
- Grid connection applications and agreements
- EPC, turbine supply and operations and maintenance contracts
- Shareholder agreements and SPV structures
- IFC Performance Standards and lender requirements
- Development budgets and stage gates
Case Study: Permitting and Consultation in Baltic Wind
Participants compare the ELWIND offshore project, where EUR 18.7 million of EU funding covers environmental and grid studies, with the 2026 Cabinet decision rejecting a South Kurzeme onshore wind park over consultation and coastal zone issues. Teams draw up a consultation and permitting plan that addresses the gaps identified.
Third Day | Financial Modelling and Debt Structuring
- Structure of a project finance model
- Capital cost, operating cost and degradation assumptions
- Revenue modelling under PPAs and merchant exposure
- Financial statements and cash flow waterfall
- Capital structure: debt, equity and mezzanine
- Debt sizing with debt service cover ratios
- Debt sculpting and reserve accounts
- Returns: project IRR, equity IRR and NPV
- Tax, depreciation and financial reporting basics
Workshop: Building a Wind Farm Cash Flow Model
Using a guided Excel template, teams build a model for an illustrative 100 MW onshore wind farm, entering cost, yield and price assumptions, sizing senior debt to a target cover ratio and calculating equity returns. They then compare a fully contracted case with a partly merchant case.
Fourth Day | Revenue Contracts, Risk and Development Finance
- Utility, corporate and virtual PPAs
- Price, volume and shape risk in revenue contracts
- Contracts for difference and auction-based support
- Construction, technology and operating risks
- Grid curtailment and balancing cost risks
- Insurance, guarantees and credit enhancement
- Role of the EBRD, EIB and NIB in Baltic renewables
- InvestEU guarantees and blended finance
- Lender due diligence and conditions precedent
Case Study: Smiltene Wind and Sunly Hybrid Solar
Teams analyse two Latvian transactions: the 112 MW Smiltene wind farm, financed by a EUR 92 million package from the EBRD, NIB and Luminor, and Sunly’s 329 MW hybrid solar parks, co-financed by the EBRD, EIB and SEB. They identify how risks were shared and how guarantees supported lending.
Fifth Day | Technical Visit and Investment Decision
- Morning technical visit to a renewable energy or grid site
- Discussion with project teams on development and financing challenges
- Debrief on lessons from the visit
- Sensitivity and scenario analysis on the Day 3 model
- Introduction to Monte Carlo analysis for yield and price risk
- Preparing an investment memorandum
- Presenting to an investment or credit committee
- Planes de acción personales
- Programme review and closing
Capstone Exercise: Investment Committee Pitch
Each team completes its model with sensitivity and Monte Carlo results, then presents an investment case to a mock credit committee. The panel tests assumptions on yield, prices, permitting and grid risk, and teams receive written feedback that they can apply to live projects in their own institutions.
Renewable Energy Project Finance Training Methodology
The training uses short expert inputs followed by hands-on practice. Most sessions centre on a model, a contract extract or a real transaction rather than slides.
El programa combina:
- Expert presentations on technology, markets and finance
- Case studies of financed projects in Latvia and the Baltic region
- Step-by-step Excel modelling exercises
- Contract review of PPA, EPC and grid connection terms
- Risk allocation workshops
- Group work in mixed developer, lender and public sector teams
- Role play of lender and investment committee meetings
- A technical visit with structured debrief
- Resumen diario y comprobaciones de conocimientos
- Plantillas y listas de verificación para usar después del programa
- Planificación de acciones individual
Participants should bring a laptop with Excel. Teams are mixed so that developers, lenders and officials see each other’s priorities.
Institutions can review their project management practice beforehand with the free Risalat project health check.
Visitas técnicas y programa en terreno
The fifth day includes a technical visit so that participants can see how renewable projects operate and discuss real development and financing issues with project teams. Visits are confirmed with host organisations closer to the programme dates and may include an operating wind, solar or hydropower site, a grid or control facility, or an institution involved in renewable energy finance. A structured debrief links what participants saw to the modelling and risk sessions.
Resultados esperados
Upon completion of this Renewable Energy Project Finance Training, participants will be able to:
- Screen renewable projects for technical, commercial and social viability
- Plan permitting, consultation and grid connection steps
- Review the main project contracts and their risk allocation
- Build and test a basic project finance model
- Size debt and assess returns for equity investors
- Compare PPA and support scheme options
- Identify suitable development bank instruments and guarantees
- Apply lender environmental and social requirements
- Present a clear investment case to decision-makers
These outcomes help institutions move projects from concept to financial close with fewer delays.
4.560 £ por participante · factura y transferencia bancaria · los grupos de 5 o más personas reciben un descuento
Cinco o más personas de una misma organización: solicite la tarifa de grupo al pedir la factura.
Ten or more: an in-house version for your institution may cost less per person. Ask for an in-house quote.
Registration closes in 76 days (17 Jan 2027)
Institutional Application of Renewable Energy Project Finance Training
Este programa ayuda a las organizaciones a fortalecer:
- Project pipeline management
- Feasibility study quality
- Permitting and consultation planning
- Grid connection coordination
- Contract management for energy projects
- Financial modelling and appraisal
- Credit and investment decision processes
- Gestión de riesgos ambientales y sociales
- Design of support schemes and auctions
- Engagement with development finance institutions
- Monitoring of project delivery
Los participantes regresan con herramientas prácticas para mejorar:
- Project screening scorecards
- Permitting and consultation plans
- Project finance model templates
- Debt sizing calculators
- Risk allocation matrices
- PPA term sheet checklists
- Lender due diligence checklists
- Investment memorandum outlines
Organisations can also assess wider institutional readiness through the Risalat institutional capacity assessment.
Pertinencia y aplicación regionales
Europa
Across the Baltic states, grid synchronisation, EU co-financing and InvestEU-backed lending are supporting new wind, solar and storage projects, while permitting and local acceptance remain decisive. The Latvian cases studied in Riga apply directly to other EU and neighbouring markets.
África
IRENA’s cost data show that onshore wind and solar are now the cheapest new options in most markets, yet higher financing costs can erode that advantage. African developers and agencies benefit from the sessions on risk allocation, guarantees and development bank co-financing.
Oriente Medio
Utility-scale solar and wind procurement in the region relies on long-term PPAs and competitive tenders. The contract, modelling and storage sessions help officials and developers compare structures and integrate battery systems.
Asia
With most of the 582 GW of renewable capacity added globally in 2024 coming from solar and wind, Asian institutions are managing larger pipelines and grid integration challenges. The pipeline screening and grid connection content addresses these needs.
América Latina
Corporate PPAs, auctions and merchant exposure are common features of renewable markets in the region. Sessions on revenue risk and Monte Carlo analysis help teams assess price uncertainty.
Wherever participants work, the same disciplines decide bankability: credible data, sound contracts, managed risks and early engagement with communities.
Perfil del país anfitrión: Letonia
Riga, Latvia’s capital, is the largest city in the Baltic states and a convenient regional meeting point, with a compact historic centre, modern hotels and good conference facilities. Its size makes it easy to combine classroom sessions with visits and networking.
Latvia is a useful benchmark for renewable project finance. Its power system has long relied on hydropower and bioenergy, and the IEA notes that renewables provide around three-quarters of domestic electricity generation. The country is now adding wind and solar: the Smiltene wind farm is expected to raise installed wind capacity by about 80%, and the Sunly hybrid parks are expected to raise solar capacity by about 50%. AST, Latvenergo and partners have invested heavily in the grid, and Latvia and Estonia are preparing the ELWIND offshore wind project of at least 1,000 MW.
Latvia is in the Schengen Area and Riga International Airport offers direct flights to many European cities. Participants who need a Schengen visa should apply early through the relevant Latvian mission or visa centre; Risalat provides invitation letters and visa guidance. Spring weather in Riga can be cool, so layered clothing is advised for site visits.
Renewable Energy Project Finance Training Deliverables
Every participant receives a full package of preparation, learning tools and follow-up support.
Antes del programa
- Evaluación previa del participante
- Renewable Energy Project Finance Readiness Assessment
- Renewable Energy Project Finance Resource Pack
- Materiales de lectura preparatoria
- Apoyo y asesoramiento gratuitos para el visado
- Recogida en el aeropuerto y asistencia de bienvenida
- Alojamiento con desayuno
- Cena de bienvenida y networking
Durante el programa
- Kit de formación de Risalat (bolsa, botella, taza, camiseta, gorra, funda de pasaporte, bolígrafos, cuaderno, imán y llavero)
- Comprehensive Renewable Energy Project Finance Training Manual
- Renewable Project Screening Scorecard
- Project Finance Model Template (Wind and Solar)
- Debt Sizing and Sculpting Calculator
- Risk Allocation Matrix for Renewable Projects
- PPA Term Sheet Checklist
- Permitting and Consultation Planning Template
- Lender Due Diligence and IFC Performance Standards Checklist
- Talleres prácticos y simulaciones
- Debates en grupo y aprendizaje entre pares
- Almuerzo y refrigerios diarios
- Acceso completo a las instalaciones de la sede de formación
- Mini Pad / tableta con materiales didácticos digitales
- Visita de campo (cuando proceda)
- Recorrido turístico por la ciudad
Después del programa
- Certificado de finalización
- Reconocimiento a la participación en programas de Risalat
- Materiales de consulta posteriores a la formación
- Investment Memorandum Template
- Monte Carlo Risk Analysis Worksheet
- Apoyo posterior a la formación y orientación de seguimiento
- Informe del programa
Ministries, utilities, banks and project teams can request a tailored in-house version of this programme, built around their own projects and financing structures, through the Risalat proposal request form.
Common Challenges in Renewable Energy Project Finance, And How This Training Helps
How can we tell which projects in our pipeline are worth developing?
Day 1 introduces screening criteria and the pipeline workshop gives teams a scorecard they can apply to their own projects.
How can we avoid permitting delays and local opposition?
Day 2 covers environmental assessment, consultation and municipal engagement, using the Baltic wind case to build a practical consultation plan.
How can we secure a grid connection on time?
Day 1 explains the grid context after synchronisation and Day 2 covers connection applications, agreements and coordination with system operators.
How can we make a project bankable for lenders?
Day 3 modelling and debt sizing, together with Day 4 sessions on due diligence and risk allocation, show what lenders test and how to prepare for it.
How can we manage electricity price risk?
Day 4 compares PPAs, contracts for difference and merchant exposure, and Day 5 uses scenario and Monte Carlo analysis to measure the impact.
How can development banks and guarantees lower our financing costs?
Day 4 reviews EBRD, EIB and NIB financing in Latvia and the use of InvestEU guarantees to support commercial lending.
How can we meet international environmental and social standards?
Day 2 applies the IFC Performance Standards to project preparation, and the deliverables include a lender due diligence checklist.
Preguntas frecuentes
Who should attend this renewable energy finance training?
Developers, investors, bankers, development finance officers, energy ministry and regulator staff, utility planners, PIU teams, lawyers and consultants working on renewable energy projects.
Do I need financial modelling experience?
No. The modelling sessions start from first principles using a guided Excel template. Participants should bring a laptop with Excel.
¿Qué proyectos reales se utilizan como estudios de caso?
The programme uses Latvian and Baltic examples, including the Smiltene wind farm, Sunly's hybrid solar parks, the ELWIND offshore wind project and the Baltic grid synchronisation of February 2025.
¿Hay una visita sobre el terreno?
Yes. Day 5 includes a technical visit to a renewable energy or grid facility. Visits are confirmed with host organisations closer to the programme dates.
¿Puede impartirse el programa a medida en la propia institución?
Yes. Institutions can request a tailored version built around their own projects through the Risalat proposal request form.
Todos los programas en RigaMás programas de Energía y agua
Por qué Riga para este programa
Se eligió Riga (Letonia) para este programa porque es de fácil acceso para los participantes previstos y cuenta con sedes adecuadas para una formación práctica e interactiva.
The Renewable Energy Project Development and Finance Training in Riga programme in March 2027 brings together officials and professionals. Sessions combine short inputs, case studies and group work on participants' own files, and the city's institutions can be added as a study visit on request.
Compruebe si necesita visado con el Verificador de visados gratuito y solicite una carta de invitación una vez inscrito.
El mismo tema en otras ciudades
- Gestión financiera para el desarrollo sostenible de proyectos (Sídney)
- Formación en prácticas sostenibles de la cadena de suministro en Singapur (Singapur)
- Formación en desarrollo de la energía marina: impulsar la energía oceánica sostenible para un crecimiento resiliente al clima (Seúl)
- Formación en investigación basada en evidencia sobre adaptación al cambio climático, seguridad alimentaria y transición energética en Berlín (Berlín)
- Formación ejecutiva en finanzas verdes & de transición en Pekín (Pekín)
- Taller y experiencia práctica en pensamiento creativo, planificación estratégica, comunicación eficaz y liderazgo (Reikiavik)
Otros programas en Riga
Relacionado: Programas de financiación climática y energía · Preparación de propuestas de financiación climática gratuita · todos los programas
Más cursos de formación en Letonia · Todos los programas en Europa · Calendario de formación completo



