Énergie et eauProgramme de 4 jours

Substation Equipment Testing, Commissioning & High-Voltage Safety in Muscat

Dates7–10 Jun 2027
LocationMuscat, Oman
LieuCommuniqué à l'inscription
Register by8 May 2027

Points clés

Dates
7–10 Jun 2027 (4 days)
Lieu
Muscat, Oman
Frais par participant
2 200 £ (GBP)
Paiement
Sur facture et par virement bancaire
Clôture des inscriptions
8 May 2027
Certificat
Certificat de participation
Sur cette page 14 sections

Présentation du programme

Substation infrastructure forms the backbone of reliable electricity transmission and distribution networks across the Middle East. Operating in severe climatic conditions with extreme ambient temperatures, high humidity, and dust exposure places substantial thermal and dielectric stresses on primary assets. This intensive four-day programme in Muscat equips engineering personnel with practical competence in equipment testing, commissioning oversight, and high-voltage safety. Participants analyse international standards to ensure newly installed and rehabilitated substations achieve operational integrity and resilience against severe environmental factors.

The curriculum centres on industry-standard methodologies for testing power transformers, gas-insulated switchgear, air-insulated switchgear, and associated instrument transformers. Participants review standard test sequences, insulation diagnostic techniques, and protection coordination schemes required to transition assets safely from installation to energisation. Emphasising compliance with IEC and IEEE standards, the course equips engineers to identify manufacturing or construction non-conformities before handover. Rigorous quality assurance during pre-commissioning eliminates hidden vulnerabilities that otherwise cause premature failures, unbudgeted downtime, and network instability.

High-voltage safety protocols and operational risk management form an indispensable component of this technical course. Attendees evaluate safe isolation procedures, earthing design verification, permit-to-work systems, and arc-flash mitigation strategies. By bridging the gap between theoretical specifications and physical site execution, this training strengthens institutional capacity to manage contractor performance, review factory acceptance documentation, and enforce rigorous site acceptance testing regimes. The practical focus ensures power utilities and implementing units safeguard both critical capital investments and engineering personnel.

Electric utilities across the region are executing capital investments and rehabilitation schemes to stabilise network transmission and expand distribution capacity, directly aligning with delivery requirements seen in major initiatives such as the Basra Electricity Dissemination and Development Project. Rapid infrastructure deployment often encounters severe operational challenges due to extreme summer temperatures, which accelerate insulation degradation and heighten thermal stress on switchgear and transformers. Engineering personnel require updated competencies in international testing standards, commissioning schedules, and high-voltage safety enforcement to prevent catastrophic equipment failures, avoid project delays, and maintain grid reliability under harsh environmental conditions.

Delivered by Risalat Consultants International in Muscat, Oman, it combines expert-led sessions, real cases and group work, so that participants can apply what they learn in their own institution.

The Programme Strengthens Institutional Capability

  • International standards framework: IEC 60076, IEC 62271, and IEEE guidelines for transmission substations
  • Power transformer pre-commissioning: Vector group verification, turns ratio, and magnetic balance testing
  • Dielectric evaluation: Insulation resistance, polarisation index, and capacitance and dissipation factor testing
  • Insulating oil sampling, dielectric breakdown testing, and dissolved gas analysis interpretation
  • Mitigating thermal stress: Transformer cooling system verification in high-ambient temperature regions
  • Air-insulated and gas-insulated switchgear: Contact resistance, breaker timing, and motion analysis
  • Gas-insulated switchgear integrity: SF6 gas quality parameters, moisture limits, and leak detection protocols
  • Current and voltage transformer verification: Ratio, polarity, excitation curves, and secondary burden checks
  • Évaluation des risques de fraude et registres des risques de fraude
  • Conception et test des contrôles internes
  • Le modèle des trois lignes et le rôle du contrôle
  • Planification de l'audit, preuves et documentation

It is designed for high-voltage electrical engineers and substation project engineers, substation operations managers and district maintenance directors, safety inspectors and electrical compliance officers from regional power directorates and others who want practical, current skills in fraud, audit and internal control.

  1. Fonds
  2. Entité
  3. Projet
  4. Résultats
  5. MRV
Comment circule la finance climatiqueCe programme couvre : fonds, projet, résultats, MRV (mis en évidence).Les bailleurs suivent la justification climatique à chaque maillon : une proposition doit donc la démontrer à chaque étape.

The Growing Importance of Substation Equipment Testing, Commissioning & High-Voltage Safety in Muscat

Les organismes publics et les projets financés par les bailleurs doivent démontrer que les fonds sont utilisés aux fins prévues. Les auditeurs, les organes de contrôle et les bailleurs regardent de plus en plus au-delà des états financiers, vers les contrôles, les registres et les comportements qui les sous-tendent.

Les faiblesses en matière de fraude et de contrôle proviennent rarement d'une défaillance unique. Elles se développent là où les rôles sont flous, les registres incomplets et les signaux d'alerte non suivis. Les équipes qui comprennent comment la fraude se produit, et comment les contrôles l'empêchent, protègent à la fois leur institution et les personnes qu'elle sert.

Les organisations ont de plus en plus besoin de professionnels capables de :

  • Identifier et coter les risques de fraude et de contrôle dans leurs propres processus
  • Concevoir des contrôles proportionnés et testables
  • Recueillir et documenter des preuves d'audit fiables
  • Repérer tôt les signaux d'alerte et les signaler correctement
  • Transformer les constats en actions concrètes et convenues

Des systèmes solides de lutte contre la fraude, d'audit et de contrôle interne aident les organisations à :

  • Réduire les pertes et les dépenses inéligibles
  • Réussir les audits externes avec moins de constats
  • Renforcer la confiance des bailleurs et des citoyens
  • Traiter les allégations de manière équitable et documentée

This Substation Equipment Testing, Commissioning & High-Voltage Safety in Muscat programme brings these elements together in a practical format, so that participants understand not only what good practice looks like but also how to introduce it in their own setting, with the people and resources they have.


Who Should Attend This Substation Equipment Testing, Commissioning & High-Voltage Safety in Muscat Training?

Ce programme s'adresse à :

  • High-voltage electrical engineers and substation project engineers
  • Substation operations managers and district maintenance directors
  • Safety inspectors and electrical compliance officers from regional power directorates
  • Engineers and technical specialists deployed on the Basra Electricity Dissemination and Development Project
  • Testing and commissioning site engineers from national electric utilities
  • Project management unit technical specialists overseeing donor-funded energy portfolios
  • Quality assurance and quality control inspectors for transmission projects
  • Senior electrical technicians transitioning into high-voltage supervisory roles
  • Auditeurs internes et responsables d'audit
  • Responsables financiers et comptables
  • Responsables de la conformité et des risques
  • Responsables et chargés de la passation des marchés

Le programme convient aussi bien aux professionnels expérimentés qu’à ceux qui prennent de nouvelles responsabilités. Les groupes réunissant plusieurs institutions et pays sont encouragés, car les participants apprennent beaucoup de l’expérience des autres.

Ce programme convient-il à votre équipe ?

Cochez ce que votre équipe doit être capable de faire.

Cochez les éléments qui s'appliquent

Substation Equipment Testing, Commissioning & High-Voltage Safety in Muscat Training Objectives

Upon successful completion of this Substation Equipment Testing, Commissioning & High-Voltage Safety in Muscat Training, participants will be able to:

  • Evaluate international testing standards including IEC 62271 and IEC 60076 for high-voltage substation apparatus
  • Formulate comprehensive pre-commissioning checklists and site acceptance testing programmes for switchgear and transformers
  • Analyse transformer diagnostic procedures including insulation resistance, winding resistance, and dissolved gas analysis
  • Assess dielectric integrity and gas leakage management for gas-insulated switchgear operating under high ambient heat
  • Establish robust commissioning schedules to transition assets from construction to commercial operation without project slippage
  • Enforce high-voltage safety rules, isolation protocols, and permit-to-work systems during energisation phases
  • Design preventive maintenance and condition monitoring regimes to mitigate premature asset degradation and outage risks
  • Expliquer comment et pourquoi la fraude se produit, à l'aide de modèles reconnus de risque de fraude
  • Réaliser une évaluation des risques de fraude et de contrôle sur un processus réel
  • Rattacher les contrôles aux risques selon le modèle des trois lignes

Chaque objectif est mis en pratique pendant le programme à travers des exercices, des études de cas ou des travaux de groupe, afin que les participants repartent capables de le faire, et pas seulement de le décrire.


Contenu et structure du programme

Votre parcours de 4 jours touchez un jour pour voir les sessions
    • International standards framework: IEC 60076, IEC 62271, and IEEE guidelines for transmission substations
    • Power transformer pre-commissioning: Vector group verification, turns ratio, and magnetic balance testing
    • Dielectric evaluation: Insulation resistance, polarisation index, and capacitance and dissipation factor testing
    • Insulating oil sampling, dielectric breakdown testing, and dissolved gas analysis interpretation
    • Mitigating thermal stress: Transformer cooling system verification in high-ambient temperature regions
Contenu détaillé jour par jour

Le programme se déroule sur 4 jours. Chaque journée associe apports d'experts, travaux pratiques et un atelier ou une étude de cas de clôture :

  • First Day: High-Voltage Substation Equipment and Transformer Testing Protocols
  • Second Day: Switchgear Testing, Protection Coordination, and Instrument Transformers
  • Third Day: High-Voltage Safety, Earthing Systems, and Energisation Management
  • Fourth Day: Commissioning Schedules, Handover Quality Assurance, and Asset Integrity

Contenu détaillé jour par jour

First Day | High-Voltage Substation Equipment and Transformer Testing Protocols

  • International standards framework: IEC 60076, IEC 62271, and IEEE guidelines for transmission substations
  • Power transformer pre-commissioning: Vector group verification, turns ratio, and magnetic balance testing
  • Dielectric evaluation: Insulation resistance, polarisation index, and capacitance and dissipation factor testing
  • Insulating oil sampling, dielectric breakdown testing, and dissolved gas analysis interpretation
  • Mitigating thermal stress: Transformer cooling system verification in high-ambient temperature regions

Workshop: High-Voltage Substation Equipment and Transformer Testing Protocols: Applying It to Your Institution

En petits groupes, les participants appliquent les méthodes du jour à des exemples tirés de leurs institutions et conviennent d'étapes concrètes pour la suite.

Second Day | Switchgear Testing, Protection Coordination, and Instrument Transformers

  • Air-insulated and gas-insulated switchgear: Contact resistance, breaker timing, and motion analysis
  • Gas-insulated switchgear integrity: SF6 gas quality parameters, moisture limits, and leak detection protocols
  • Current and voltage transformer verification: Ratio, polarity, excitation curves, and secondary burden checks
  • Primary and secondary injection testing for protection relay schemes and interlock verification
  • High-voltage withstand testing: AC resonant and very low frequency dielectric site acceptance tests

Workshop: Switchgear Testing, Protection Coordination, and Instrument Transformers: Applying It to Your Institution

En petits groupes, les participants appliquent les méthodes du jour à des exemples tirés de leurs institutions et conviennent d'étapes concrètes pour la suite.

Third Day | High-Voltage Safety, Earthing Systems, and Energisation Management

  • Substation earthing grid verification: Earth resistance measurement and step and touch potential calculations
  • High-voltage safety rules: Safe systems of work, statutory clearances, and lock-out tag-out protocols
  • Personal protective equipment specifications and arc-flash risk mitigation during testing procedures
  • Permit-to-work administration, boundary control, and interface management with operational grids
  • Commissioning sequence planning: Developing step-by-step pre-energisation and initial energisation procedures

Case Study: High-Voltage Safety, Earthing Systems, and Energisation Management in Practice

Les participants analysent un cas réaliste, comparent les choix effectués aux bonnes pratiques et en tirent des enseignements applicables à leur propre contexte.

Fourth Day | Commissioning Schedules, Handover Quality Assurance, and Asset Integrity

  • Establishing structured commissioning schedules and defining milestones to minimise contractor delays
  • Managing non-conformance reports, punch-lists, and technical deviation reviews during site acceptance
  • Reviewing factory acceptance test documentation against on-site performance data
  • Formulating preventive maintenance schedules and baseline thermography surveys for newly energised assets
  • Institutional asset management: Developing standard operating procedures for regional power directorates

Capstone Exercise: Substation Equipment Testing, Commissioning & High-Voltage Safety in Muscat Action Plan for Your Institution

Les participants synthétisent la semaine dans un plan d'action pour leur institution, avec des priorités, des responsables et des premières étapes, puis le présentent à leurs pairs et aux animateurs pour recueillir leurs retours.


Substation Equipment Testing, Commissioning & High-Voltage Safety in Muscat Training Methodology

The training employs an applied professional learning methodology combining technical lectures, engineering calculations, and critical analysis of genuine equipment test certificates. Participants work through structured case exercises on transformer diagnostic interpretation, switchgear test sheets, and energisation sequencing. Facilitated group discussions enable peer exchange on managing operational difficulties specific to arid, high-temperature environments. Practical planning sessions guide attendees in auditing site acceptance test reports, ensuring that engineering theories are translated into actionable quality assurance frameworks for immediate deployment on public utility and donor-supported infrastructure projects.

Le programme associe :

  • Sessions animées par des experts sur les pratiques actuelles
  • Études de cas régionales et internationales
  • Travaux de groupe et exercices pratiques
  • Simulations et jeux de rôle le cas échéant
  • Discussion des défis rencontrés par les participants dans l'exercice de leurs fonctions
  • Apprentissage entre pairs, d'institutions et de pays différents
  • Des outils et modèles pratiques à réutiliser au travail
  • Réflexion quotidienne et plan d'action

Avant le programme, une courte pré-évaluation aide les animateurs à comprendre le rôle et les priorités de chaque participant, afin d’adapter les exemples et les exercices au groupe. Chaque journée se termine par une brève réflexion au cours de laquelle les participants notent ce qu’ils appliqueront dans leur travail.

  1. Opération
  2. Enregistrement
  3. Contrôle
  4. Données probantes
  5. Opinion
La piste d'auditUn auditeur ne peut se fier à un chiffre que si chaque maillon jusqu'à l'opération d'origine est solide.

Résultats attendus

Upon completion of this Substation Equipment Testing, Commissioning & High-Voltage Safety in Muscat Training, participants will be able to:

  • Proficiency in auditing factory and site acceptance test documentation against IEC standards
  • Capability to identify equipment defects and dielectric weaknesses prior to final asset energisation
  • Application of rigorous high-voltage safety rules and permit-to-work systems to prevent site incidents
  • Competence in developing structured commissioning programmes that prevent costly project delays
  • Implementation of condition-monitoring routines suited to extreme thermal operating conditions
  • Strengthened governance in supervising engineering contractors and reviewing technical compliance
  • Évaluer les risques de fraude et de contrôle dans leurs propres processus
  • Concevoir et tester des contrôles proportionnés

Les participants repartent avec un plan d'action personnel et des outils pratiques utilisables dans leur institution dès la première semaine de retour. Les institutions qui envoient plusieurs participants peuvent s'appuyer sur le programme pour convenir de méthodes et de modèles communs entre équipes, ce qui facilite la pérennité des améliorations.

Planifiez les places de votre équipe

2 200 £ par participant · facture et virement bancaire · remise pour les groupes de 5 personnes ou plus

1participant(s)
2 200 £au tarif standard

Registration closes in 177 days (8 May 2027)


Institutional Application of Substation Equipment Testing, Commissioning & High-Voltage Safety in Muscat Training

Ce programme aide les organisations à renforcer :

  • Gestion des risques de fraude et de corruption
  • Cadres de contrôle interne
  • Dispositifs d'audit et de contrôle
  • Suivi des constats d'audit
  • Intégrité et canaux de signalement

Les participants repartent avec des outils pratiques pour améliorer :

  • Registres des risques et cartographies des contrôles
  • Planification et tests d'audit
  • Preuves et documentation
  • Rapports à la direction et aux conseils d'administration
  • Prévention des dépenses inéligibles

Le programme est conçu pour que l'apprentissage passe de la salle de formation à l'institution. Les participants travaillent, dans la mesure du possible, sur leurs propres processus et documents, et repartent avec un plan d'action que leurs responsables peuvent examiner et soutenir.


Pertinence régionale & mise en application

Europe

Les institutions européennes traitent la fraude, l'audit et le contrôle interne dans des cadres réglementaires détaillés et des programmes de réforme. Les participants européens peuvent comparer leurs pratiques avec celles de collègues d'autres régions et vérifier comment des méthodes éprouvées fonctionnent dans d'autres conditions.

Afrique

Partout en Afrique, les ministères, organismes et équipes de projet qui interviennent dans la lutte contre la fraude, l'audit et le contrôle interne travaillent de plus en plus aux côtés de programmes financés par les bailleurs, qui attendent des systèmes et des données probantes clairs. Le programme aide les participants à adapter les bonnes pratiques aux institutions et aux ressources dont ils disposent.

Moyen-Orient

Au Moyen-Orient, les stratégies nationales de développement et les plans de diversification imposent des exigences croissantes en matière de fraude, d'audit et de contrôle interne. Les participants examinent comment développer, au sein des organismes publics et des entreprises, les capacités dont ces plans ont besoin.

Asie

Les institutions asiatiques conjuguent croissance rapide et programmes de modernisation ambitieux. Les participants venus d'Asie peuvent partager leur expérience du déploiement rapide de systèmes à grande échelle et découvrir les approches adoptées ailleurs.

Pacifique

Les petits États insulaires et du Pacifique font face à des contraintes particulières de taille, de distance et de capacités. Le programme met en avant des approches pratiques et proportionnées en matière de fraude, d'audit et de contrôle interne, adaptées aux petites institutions.

Holding the programme in Muscat, Oman brings participants together away from their daily pressures, so they can compare how fraud, audit and internal control is handled in different settings. The same programme can also be delivered in-house for one institution, in its own country or online, with cases taken from its current work.


Host Country Profile – Oman

Muscat provides a professional setting for training courses and study tours focused on public sector governance, diplomatic practice, economic diversification, and infrastructure development.

Se former hors de son pays permet aux participants de se concentrer, de porter un regard neuf sur leur propre institution et de constituer un réseau avec des collègues d'autres pays.


Substation Equipment Testing, Commissioning & High-Voltage Safety in Muscat Training Deliverables

Les participants sont accompagnés avant, pendant et après le programme, afin que la préparation, l'apprentissage et le suivi forment une expérience continue.

Avant le programme

  • Pré-évaluation des participants
  • Substation Equipment Testing, Commissioning & High-Voltage Safety in Muscat Readiness Assessment
  • Substation Equipment Testing, Commissioning & High-Voltage Safety in Muscat Resource Pack
  • Lectures préparatoires
  • Aide et conseils gratuits pour le visa

Pendant le programme

  • Accueil à l'aéroport & assistance à l'arrivée
  • Hébergement avec petit-déjeuner
  • Dîner de bienvenue et de réseautage
  • Kit de formation Risalat (sac, gourde, mug, t-shirt, casquette, protège-passeport, stylos, carnet, magnet & porte-clés)
  • Comprehensive Substation Equipment Testing, Commissioning & High-Voltage Safety in Muscat Training Manual
  • Modèle de registre des risques de fraude
  • Matrice de cartographie des contrôles
  • Liste de contrôle des preuves d'audit
  • Outil de suivi des constats et des actions
  • Ateliers pratiques & simulations
  • Discussions de groupe & apprentissage entre pairs
  • Déjeuner et pauses-café quotidiens
  • Accès complet aux installations du lieu de formation
  • Mini tablette avec supports pédagogiques numériques
  • Visite de terrain (le cas échéant)
  • Visite récréative de la ville

Après le programme

  • Certificat de participation
  • Distinction Risalat de participation au programme
  • Documents de référence après la formation
  • Guide d'autoévaluation des risques de fraude
  • Liste de contrôle des tests de contrôles
  • Accompagnement après la formation & conseils de suivi
  • Rapport du programme

Les institutions peuvent aussi demander une version intra sur mesure de ce programme, dispensée dans leurs locaux ou en ligne. Demander une proposition.


Common Challenges in Substation Equipment Testing, Commissioning & High-Voltage Safety in Muscat, And How This Training Helps

Comment les institutions peuvent-elles identifier et évaluer les risques de fraude et de contrôle dans leurs propres processus ?

The programme addresses this directly on the first day (High-Voltage Substation Equipment and Transformer Testing Protocols), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.

Comment les institutions peuvent-elles concevoir des contrôles proportionnés et vérifiables ?

The programme addresses this directly on the second day (Switchgear Testing, Protection Coordination, and Instrument Transformers), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.

Comment les institutions peuvent-elles recueillir et documenter des preuves d'audit fiables ?

The programme addresses this directly on the third day (High-Voltage Safety, Earthing Systems, and Energisation Management), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.

Comment les institutions peuvent-elles repérer tôt les signaux d'alerte et les faire remonter correctement ?

The programme addresses this directly on the fourth day (Commissioning Schedules, Handover Quality Assurance, and Asset Integrity), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.

Comment les institutions peuvent-elles transformer les constats en actions concrètes et concertées ?

The programme addresses this directly on the first day (High-Voltage Substation Equipment and Transformer Testing Protocols), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.


Questions fréquentes

When and where does the Substation Equipment Testing, Commissioning & High-Voltage Safety in Muscat programme take place?

It runs from 7 Jun 2027 to 10 Jun 2027, in Muscat, Oman. The registration deadline is shown at the top of this page.

Qui devrait participer ?

The programme is designed for high-voltage electrical engineers and substation project engineers, substation operations managers and district maintenance directors, safety inspectors and electrical compliance officers from regional power directorates, engineers and technical specialists deployed on the Basra Electricity Dissemination and Development Project, and others who want practical skills in fraud, audit and internal control.

Recevrai-je un certificat ?

Oui. Les participants qui terminent le programme reçoivent un certificat de participation délivré par Risalat Consultants International.

Ce programme peut-il être dispensé pour notre seule institution ?

Oui. Nous pouvons proposer une version intra sur mesure dans vos locaux, dans une autre ville ou en ligne, construite autour de vos propres cas. Utilisez la demande de proposition sur cette page.

Faut-il une expérience préalable en fraude, audit et contrôle interne ?

Aucune formation spécialisée n'est requise au-delà d'une expérience dans une fonction similaire. Une courte pré-évaluation aide les animateurs à adapter les sessions au groupe.

Who Will Deliver This Programme

Each date is delivered by a team assigned from Risalat's expert network for this subject. For this programme we assign:

Lead facilitatorA senior energy and water specialist with at least 10 years of practice on public-sector and donor-financed projects, who has done the work this programme teaches (Substation Equipment Testing, Commissioning & High-Voltage Safety) and trained teams in it.
Practitioner co-facilitatorA current or recent practitioner from a project implementation unit, agency or consulting team, who brings live cases, documents and the mistakes to avoid.
Guest speakersWhere the programme allows, specialists from host-country institutions or financed projects who explain how the system works in practice.
Programme coordinatorA Risalat coordinator who handles the pre-assessment, logistics, visas and the follow-up after the programme.

How we choose them: Experience in the region of the participants or comparable settings; Command of the financier rules that apply (World Bank, ADB, AfDB, EU, UN) where relevant; Delivery in English; other languages on request for in-house groups; No conflict of interest with participants' institutions.

Names and short CVs of the assigned experts are shared with registered participants and sponsoring organisations before the programme, on request. Are you an expert in this subject? Join our expert network.

Training courses in MuscatEnergy and Water training courses

Why Muscat for this programme

Muscat is the political and administrative centre of Oman, hosting key government ministries, the Central Bank of Oman, and major infrastructure initiatives. Visiting delegates can observe public administration and port logistics at nearby operational hubs. The city is straightforward to reach through direct international flights connecting Europe, Asia, and the wider Gulf region.

The Substation Equipment Testing, Commissioning & High-Voltage Safety in Muscat programme in June 2027 brings together officials and professionals from across the Middle East region and beyond. Sessions combine short inputs, case studies and group work on participants' own files, and the city's institutions can be added as a study visit on request.

Getting there: Muscat International Airport (MCT).

Vérifiez si vous avez besoin d'un visa avec le vérificateur de visa gratuit, et demandez une lettre d'invitation une fois inscrit.

Le même thème dans d'autres villes

Other programmes in Muscat

For teams and institutions

Bring your team

Teams that learn together apply more at work. Tell us how many people and how you would like to take part: we reply with a group quote within two working days.

How

No commitment. Invoices to your institution; payment from project or training budgets.

More training courses in Oman · Tous les programmes au Moyen-Orient · Calendrier complet des formations

Plan this programme in a roadmap: why it matters, why to approve it, the dates to plan and the career it builds.

Frais par participant2 200 £S'inscrire →