Home › Financed projects › Middle East and North Africa
Second Djibouti-Ethiopia Power System Interconnection Project
In short: Second Djibouti-Ethiopia Power System Interconnection Project is a project financed by World Bank in Middle East and North Africa (US$66.9 million, approved March 2022, closing December 2026), implemented by Electricit� de Djibouti. It is in the final stretch before closing.
What the project aims to do
The Project Development Objective (PDO) is to enhance the trade of reliable, low-cost, and clean electricity between Ethiopia and Djibouti.
Project development objective, World Bank
Project facts
| Project | Second Djibouti-Ethiopia Power System Interconnection Project (P173763) |
|---|---|
| Country | Middle East and North Africa |
| Financier | World Bank |
| Commitment | US$66.9 million |
| Approved | March 2022 |
| Closing | December 2026 |
| Implementing agency | Electricit� de Djibouti |
| Main sector | Energy Transmission and Distribution |
| Status | Active |
Where projects at this stage usually need help
Projects in their last 18 months usually concentrate on completing contracts, final audits, evidence of results, the implementation completion report and handing over what was built so it keeps working.
- Completing and closing contracts
- Final audits and financial close
- Results evidence for the completion report
- Handover and sustainability of assets and systems
- Works contracts and utility performance
Facts from the World Bank project database: P173763 on projects.worldbank.org. Checked 28 November 2026. The needs above describe what projects at this stage typically face, not findings about this project.
How Risalat can support the team
Risalat works with project units and ministries as a consulting and implementation partner (a procurement, financial management, monitoring or safeguards desk working alongside the unit) and through practical training for the staff who carry the work.
Programmes on these subjects
- Clean Energy Integration and Power Sector Reform in Vienna
- Power Transmission Asset Reliability and SCADA Modernisation in Almaty
- Urban Clean Heating and District Energy Decarbonisation in Vienna
Free tools the team can use today
- CV Designer for Consultants and Professionals
- Problem Tree and Objective Tree Builder
- Content Effort and Reach Estimator
Free mini report for this project's team: where projects at this stage usually get stuck and how to stay on schedule, written for Second Djibouti-Ethiopia Power System Interconnection Project.
All active financed projects in Middle East and North Africa · All free tools