关键信息
- 日期
- 3–6 May 2027 (4 days)
- 地点
- 韩国首尔
- 每位学员费用
- £3,000(英镑)
- 付款
- 通过发票和银行转账付款
- 报名截止
- 3 Apr 2027
- 适用对象
- Hospital engineering directors and physical plant managers; Infection prevention and control leads and clinical safety officers; Health infrastruct…
- 证书
- 结业证书
- 内训选项
- 按您的日期,为您的团队专场举办
本页内容13个部分
培训项目概述
Healthcare infrastructure in sub-zero regions faces acute operational stresses that undermine infection prevention and control. When external temperatures plummet, healthcare facilities often seal building envelopes, resulting in reduced air exchange, condensation, and heightened risks of airborne pathogen transmission. This four-day intensive programme in Seoul addresses the complex nexus of structural engineering, clinical containment, and mechanical reliability. Participants study proven methods to maintain rigorous bio-safety standards without compromising thermal efficiency during prolonged periods of extreme cold.
The curriculum centres on the adaptation of international health infrastructure standards to freezing operational contexts. Engineering and clinical leads examine advanced HVAC configurations, negative pressure isolation rooms, and thermal barrier integrity required to prevent systemic freeze-ups. Focusing on primary health centres and multi-speciality referral hospitals, the course investigates how to eliminate thermal bridging, manage moisture migration, and sustain clean air distribution. Participants evaluate practical architectural and building services solutions benchmarked against leading East Asian clinical engineering protocols.
Delivered through a combination of technical analysis, applied design exercises, and operational problem-solving, this course equips professionals to modernise legacy health assets. Participants develop robust, climate-resilient upgrades that align with World Bank and Asian Development Bank environmental and social standards. By bridging the gap between clinical bio-containment directives and cold-climate engineering constraints, the programme ensures that health facilities remain safe, fully operational, and compliant with international infection control frameworks throughout severe continental winters.
Health systems in extreme continental climates face critical operational tests as governments implement modern infection control mandates across aging facilities. Under the US$50.7m COVID-19 Emergency Response and Health System Preparedness Project Additional Financing, investments focus on upgrading diagnostic capacity, intensive care units, and clinical bio-containment infrastructure. Without climate-adapted building engineering, sophisticated mechanical ventilation and liquid waste systems suffer catastrophic failures from deep freezing, pipe bursts, and moisture buildup. Upgrading health facilities to withstand severe winters while satisfying modern airborne infection isolation metrics is therefore an immediate priority for infrastructure planners and donor-funded project delivery units.
本培训项目由Risalat Consultants International在韩国首尔举办,结合专家主讲、真实案例与小组练习,帮助学员将所学应用于本单位工作。
The Programme Strengthens Institutional Capability
- Infection transmission dynamics and containment challenges in sealed winter facilities
- Thermal envelope performance: air barriers, vapour retarders, and mitigation of interstitial condensation
- Zonation principles: separating clean, transitional, and contaminated clinical circulation corridors
- Retrofitting legacy masonry and precast concrete hospital walls to eliminate thermal bridges
- Benchmarking clinical containment layouts against WHO and international bio-safety guidance
- Airborne infection isolation room metrics: balancing air change rates with severe heating loads
- HVAC system design under ASHRAE 170: air intake protection, preheating, and heat recovery ventilators
- Managing pressure cascades: differential pressure monitoring across triage, isolation, and ward zones
- 气候与环境风险评估
- 适应与减缓规划
- 能源、水和土地领域的行业战略
- 面向气候与环境目标的项目设计
It is designed for hospital engineering directors and physical plant managers, infection prevention and control leads and clinical safety officers, health infrastructure project implementation unit engineers and others who want practical, current skills in climate, environment and natural resources.
- 资金
- 实体
- 项目
- 结果
- MRV(监测、报告与核查)
The Growing Importance of Infection Prevention and Healthcare Facility Upgrading in Cold Climates in Seoul
气候变化、环境压力和资源管理如今正影响着国家计划、预算和投资决策。出资方越来越期望项目从一开始就纳入气候与环境因素。
能够针对气候风险进行规划、妥善管理自然资源并编制合理提案的机构,更有能力保护公共服务,并获取这一领域的可用资金。
各机构日益需要具备以下能力的专业人员:
- 评估其服务和资产面临的气候与环境风险
- 设计符合气候与环境目标的项目
- 编制出资方能够批准的提案
- 可信地衡量和报告成果
- 与社区及跨部门合作伙伴协同工作
健全的气候、环境与自然资源体系有助于机构:
- 保护服务和基础设施免受气候风险影响
- 获取气候与环境资金
- 履行国家及国际承诺
- 可持续地利用自然资源
This Infection Prevention and Healthcare Facility Upgrading in Cold Climates in Seoul programme brings these elements together in a practical format, so that participants understand not only what good practice looks like but also how to introduce it in their own setting, with the people and resources they have.
Who Should Attend This Infection Prevention and Healthcare Facility Upgrading in Cold Climates in Seoul Training?
本培训项目适合:
- Hospital engineering directors and physical plant managers
- Infection prevention and control leads and clinical safety officers
- Health infrastructure project implementation unit engineers
- Public works architects designing clinical and diagnostic facilities
- Biomedical waste management coordinators in sub-zero regions
- Procurement officers sourcing hospital HVAC and isolation systems
- Ministry of Health facility planning and maintenance executives
- Technical advisors on World Bank and Asian Development Bank health operations
- District and provincial referral hospital technical superintendents
- 气候变化与环境官员
- 能源、水和农业部门工作人员
- 规划与政策官员
本培训项目既适合经验丰富的专业人员,也适合刚承担新职责的人员。我们鼓励来自不同机构和国家的学员组成混合小组,因为学员能从彼此的经验中获益良多。
勾选您的团队需要具备的能力。
Infection Prevention and Healthcare Facility Upgrading in Cold Climates in Seoul Training Objectives
Upon successful completion of this Infection Prevention and Healthcare Facility Upgrading in Cold Climates in Seoul Training, participants will be able to:
- Evaluate clinical building envelope performance under extreme sub-zero exterior temperatures
- Design directional airflow and mechanical ventilation systems meeting ASHRAE Standard 170 in freezing conditions
- Formulate retrofit strategies for negative pressure airborne infection isolation rooms without thermal bridging
- Adapt biomedical wastewater and drainage collection networks to prevent freezing, backflow, and pathogen release
- Develop climate-resilient solid healthcare waste containment and on-site treatment protocols
- Assess healthcare architectural retrofits against WHO infection prevention and control engineering guidelines
- Prepare capital upgrade specifications compliant with multilateral donor technical safeguards and procurement frameworks
- 阐述本行业面临的主要气候与环境挑战
- 评估服务和资产面临的气候与环境风险
- 规划适应与减缓措施
每项目标都会在培训期间通过练习、案例或小组作业加以实践,使学员结业时不仅能够描述,更能够实际运用。
培训项目内容与结构
- Infection transmission dynamics and containment challenges in sealed winter facilities
- Thermal envelope performance: air barriers, vapour retarders, and mitigation of interstitial condensation
- Zonation principles: separating clean, transitional, and contaminated clinical circulation corridors
- Retrofitting legacy masonry and precast concrete hospital walls to eliminate thermal bridges
- Benchmarking clinical containment layouts against WHO and international bio-safety guidance
- Airborne infection isolation room metrics: balancing air change rates with severe heating loads
- HVAC system design under ASHRAE 170: air intake protection, preheating, and heat recovery ventilators
- Managing pressure cascades: differential pressure monitoring across triage, isolation, and ward zones
- HEPA filtration operational resilience: addressing humidity control, frost formation, and filter loading
- Exhaust air management: stack design, prevailing wind considerations, and plume dispersion in freezing conditions
- Design of insulated, heat-traced clinical plumbing to prevent pathogen-laden drain freezes
- Liquid bio-waste neutralisation and containment prior to municipal discharge in cold regions
- Solid healthcare waste storage: managing low-temperature staging areas, disinfection, and vermin control
- Autoclaving and microwave treatment systems: operational challenges and steam dynamics at low ambient temperatures
- Safe disposal logistics: collection routing, transit containment, and emergency spill response during winter
- Conducting structural and mechanical facility condition assessments in secondary and referral hospitals
- Phased construction scheduling: carrying out bio-containment retrofits in operational winter environments
- Integrating World Bank and ADB environmental and social standards into facility upgrade contracts
- Commissioning, testing, and balancing: verifying negative pressure integrity and smoke clearance
- Developing facility-specific winter maintenance schedules and standard operating procedures
完整的每日课程内容
本培训项目为期4天,每天都包括专家讲解、实践练习,并以研讨或案例研究收尾:
- First Day: Day 1: Bio-Containment Architecture and Building Envelopes in Extreme Climates
- Second Day: Day 2: Advanced HVAC Engineering, Filtration, and Air Exchange in Sub-Zero Weather
- Third Day: Day 3: Cold-Climate Biomedical Waste, Drainage, and Clinical Plumbing
- Fourth Day: Day 4: Facility Retrofitting, Compliance, and Donor Project Implementation
完整的每日课程内容
First Day | Day 1: Bio-Containment Architecture and Building Envelopes in Extreme Climates
- Infection transmission dynamics and containment challenges in sealed winter facilities
- Thermal envelope performance: air barriers, vapour retarders, and mitigation of interstitial condensation
- Zonation principles: separating clean, transitional, and contaminated clinical circulation corridors
- Retrofitting legacy masonry and precast concrete hospital walls to eliminate thermal bridges
- Benchmarking clinical containment layouts against WHO and international bio-safety guidance
Workshop: Day 1: Bio-Containment Architecture and Building Envelopes in Extreme Climates: Applying It to Your Institution
学员分成小组,将当天所学方法应用于本机构的实例,并商定切实可行的后续步骤。
Second Day | Day 2: Advanced HVAC Engineering, Filtration, and Air Exchange in Sub-Zero Weather
- Airborne infection isolation room metrics: balancing air change rates with severe heating loads
- HVAC system design under ASHRAE 170: air intake protection, preheating, and heat recovery ventilators
- Managing pressure cascades: differential pressure monitoring across triage, isolation, and ward zones
- HEPA filtration operational resilience: addressing humidity control, frost formation, and filter loading
- Exhaust air management: stack design, prevailing wind considerations, and plume dispersion in freezing conditions
Workshop: Day 2: Advanced HVAC Engineering, Filtration, and Air Exchange in Sub-Zero Weather: Applying It to Your Institution
学员分成小组,将当天所学方法应用于本机构的实例,并商定切实可行的后续步骤。
Third Day | Day 3: Cold-Climate Biomedical Waste, Drainage, and Clinical Plumbing
- Design of insulated, heat-traced clinical plumbing to prevent pathogen-laden drain freezes
- Liquid bio-waste neutralisation and containment prior to municipal discharge in cold regions
- Solid healthcare waste storage: managing low-temperature staging areas, disinfection, and vermin control
- Autoclaving and microwave treatment systems: operational challenges and steam dynamics at low ambient temperatures
- Safe disposal logistics: collection routing, transit containment, and emergency spill response during winter
Case Study: Day 3: Cold-Climate Biomedical Waste, Drainage, and Clinical Plumbing in Practice
学员分析真实案例,将案例中的决策与良好实践进行比较,并总结出可在自身环境中运用的经验。
Fourth Day | Day 4: Facility Retrofitting, Compliance, and Donor Project Implementation
- Conducting structural and mechanical facility condition assessments in secondary and referral hospitals
- Phased construction scheduling: carrying out bio-containment retrofits in operational winter environments
- Integrating World Bank and ADB environmental and social standards into facility upgrade contracts
- Commissioning, testing, and balancing: verifying negative pressure integrity and smoke clearance
- Developing facility-specific winter maintenance schedules and standard operating procedures
Capstone Exercise: Infection Prevention and Healthcare Facility Upgrading in Cold Climates in Seoul Action Plan for Your Institution
学员将一周所学整合为本机构的行动计划,明确优先事项、负责人和初步行动,并进行展示,听取同伴和讲师的反馈。
Infection Prevention and Healthcare Facility Upgrading in Cold Climates in Seoul Training Methodology
The training is conducted through adult learning methodologies suited to senior technical professionals. Participants engage with real engineering drawings, mechanical schematics, and clinical retrofit case studies. Sessions combine interactive technical lectures with practical group workshops where attendees resolve mechanical failure scenarios and draft facility improvement plans. Daily exercises utilise specialised calculation models to size air handling and insulation requirements, culminating in an integrated facility upgrade plan assessed against international health infrastructure criteria.
本培训项目融合了:
- 专家主讲当前实践
- 区域及国际案例研究
- 小组作业与实践练习
- 视情况安排模拟演练与角色扮演
- 探讨学员自身面临的挑战
- 跨机构、跨国家的同伴学习
- 可带回工作岗位的实用工具与模板
- 每日反思与行动规划
培训开始前,简短的课前评估可帮助讲师了解每位学员的岗位职责和重点关注事项,以便根据学员群体调整案例和练习。每天结束时安排简短的反思环节,学员记录下将在工作中应用的内容。
预期成果
Upon completion of this Infection Prevention and Healthcare Facility Upgrading in Cold Climates in Seoul Training, participants will be able to:
- Deliver structural retrofit specifications that eliminate condensation and pathogen build-up in sealed health facilities
- Formulate ventilation schemes that maintain continuous negative pressure without frozen intake coils or mechanical failure
- Establish compliant, freeze-protected biomedical wastewater and solid waste containment workflows
- Execute systematic infection prevention infrastructure audits across primary and tertiary healthcare sites
- Produce procurement-ready technical requirements aligned with international development bank project guidelines
- Implement operational continuity and preventative maintenance protocols for clinical services during severe sub-zero periods
- 评估气候与环境风险
- 规划适应与减缓措施
学员结业时将获得个人行动计划和实用工具,回到工作岗位的第一周即可在机构中应用。派出多名学员的机构可借助本培训项目,在各团队之间统一方法和模板,使改进成果更易持续。
每位学员£3,000 · 通过发票和银行转账付款 · 5人及以上团体报名可享优惠
同一机构五人及以上:请在申请发票时索取团体价。
10人或以上:为贵机构举办内训的人均费用可能更低。索取内训报价。
Registration closes in 141 days (3 Apr 2027)
Institutional Application of Infection Prevention and Healthcare Facility Upgrading in Cold Climates in Seoul Training
本培训项目帮助机构加强:
- 气候与环境规划
- 项目设计
- 获取资金
- 成果衡量
- 利益相关方参与
学员将带着实用工具回到工作岗位,以提升:
- 风险评估
- 概念说明
- 成果框架
- 监测系统
- 伙伴关系安排
本培训项目的设计旨在让学习成果从课堂延伸至机构。学员尽可能围绕自身的流程和文件开展练习,并在结业时带走一份可供其主管审阅和支持的行动计划。
区域相关性与应用
欧洲
欧洲机构在详尽的监管框架和改革议程下开展气候、环境与自然资源工作。来自欧洲的学员可以将自身实践与其他地区的同行进行比较,并检验成熟方法在不同条件下的适用性。
非洲
在整个非洲,从事气候、环境与自然资源工作的政府部委、机构和项目团队,越来越多地与捐助方资助的项目协同运作,而这些项目要求有清晰的制度和证据。本培训项目帮助学员将良好实践与其所在机构及可用资源相结合。
中东
在中东,国家发展战略和多元化计划对气候、环境与自然资源管理提出了越来越高的要求。学员将探讨如何在公共机构和企业内部建立实现这些计划所需的能力。
亚洲
亚洲各国的机构在快速发展的同时,推进着雄心勃勃的现代化计划。来自亚洲的学员可以分享快速扩展系统的经验,并借鉴其他地区的做法。
太平洋地区
小岛屿国家和太平洋国家在规模、距离和能力方面面临特殊制约。本培训项目重点介绍适合小型机构、务实且适度的气候、环境与自然资源管理方法。
Holding the programme in Seoul, South Korea brings participants together away from their daily pressures, so they can compare how climate, environment and natural resources is handled in different settings. The same programme can also be delivered in-house for one institution, in its own country or online, with cases taken from its current work.
东道国概况:韩国
Risalat Consultants International在韩国首尔举办的培训项目、研讨会、实地见习与培训课程
在本国以外学习,可让学员专心投入,以全新视角审视本机构,并有机会与其他国家的同行建立人脉网络。
Infection Prevention and Healthcare Facility Upgrading in Cold Climates in Seoul Training Deliverables
学员在培训前、培训中及培训后均可获得支持,使准备、学习与跟进形成连贯完整的体验。
培训开始前
- 学员课前评估
- Infection Prevention and Healthcare Facility Upgrading in Cold Climates in Seoul Readiness Assessment
- Infection Prevention and Healthcare Facility Upgrading in Cold Climates in Seoul Resource Pack
- 课前阅读资料
- 免费签证支持与咨询
培训期间
- 机场接机与欢迎协助
- 住宿(含早餐)
- 欢迎交流晚宴
- Risalat培训礼包(背包、水瓶、马克杯、T恤、帽子、护照套、笔、笔记本、冰箱贴及钥匙扣)
- Comprehensive Infection Prevention and Healthcare Facility Upgrading in Cold Climates in Seoul Training Manual
- 气候风险筛查检查清单
- 备选方案评估模板
- 概念说明模板
- 成果衡量模板
- 实践研讨与模拟演练
- 小组讨论与同伴学习
- 每日午餐与茶歇
- 全面使用培训场地设施
- 装有数字学习资料的迷你平板电脑
- 实地考察(如适用)
- 城市休闲观光
培训结束后
- 结业证书
- Risalat培训项目参与表彰奖
- 培训后参考资料
- 融资准备检查清单
- 监测与报告模板
- 培训后支持与跟进指导
- 培训项目报告
各机构也可申请本培训项目的定制内训版本,在其办公场所或在线举办。索取方案建议书。
Common Challenges in Infection Prevention and Healthcare Facility Upgrading in Cold Climates in Seoul, And How This Training Helps
机构如何评估其服务和资产面临的气候与环境风险?
The programme addresses this directly on the first day (Day 1: Bio-Containment Architecture and Building Envelopes in Extreme Climates), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
机构如何设计符合气候与环境目标的项目?
The programme addresses this directly on the second day (Day 2: Advanced HVAC Engineering, Filtration, and Air Exchange in Sub-Zero Weather), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
机构如何编制出资方能够批准的提案?
The programme addresses this directly on the third day (Day 3: Cold-Climate Biomedical Waste, Drainage, and Clinical Plumbing), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
机构如何可信地衡量和报告成果?
The programme addresses this directly on the fourth day (Day 4: Facility Retrofitting, Compliance, and Donor Project Implementation), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
机构如何与社区及跨部门合作伙伴协同工作?
The programme addresses this directly on the first day (Day 1: Bio-Containment Architecture and Building Envelopes in Extreme Climates), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
常见问题
When and where does the Infection Prevention and Healthcare Facility Upgrading in Cold Climates in Seoul programme take place?
It runs from 3 May 2027 to 6 May 2027, in Seoul, South Korea. The registration deadline is shown at the top of this page.
谁应参加?
The programme is designed for hospital engineering directors and physical plant managers, infection prevention and control leads and clinical safety officers, health infrastructure project implementation unit engineers, public works architects designing clinical and diagnostic facilities, and others who want practical skills in climate, environment and natural resources.
我能获得证书吗?
能。完成本培训项目的学员将获得Risalat Consultants International颁发的结业证书。
本培训项目能否仅为我们机构单独举办?
可以。我们可以在贵机构所在地、其他城市或在线提供量身定制的内训版本,并围绕贵机构自身的案例设计内容。请使用本页面的方案建议书申请表。
我是否需要具备气候、环境和自然资源方面的经验?
除具备相关岗位经验外,无需其他专业背景。简短的课前评估可帮助讲师根据学员群体调整课程。
Who Will Deliver This Programme
Each date is delivered by a team assigned from Risalat's expert network for this subject. For this programme we assign:
How we choose them: Experience in the region of the participants or comparable settings; Command of the financier rules that apply (World Bank, ADB, AfDB, EU, UN) where relevant; Delivery in English; other languages on request for in-house groups; No conflict of interest with participants' institutions.
Names and short CVs of the assigned experts are shared with registered participants and sponsoring organisations before the programme, on request. Are you an expert in this subject? Join our expert network.
Training courses in SeoulHealthcare training courses
为何选择在首尔举办本培训项目
首尔在电子政务和电子采购领域处于领先地位,是开展数字化转型考察学习的理想之地。
The Infection Prevention and Healthcare Facility Upgrading in Cold Climates in Seoul programme in May 2027 brings together officials and professionals from across the Asia region and beyond. Sessions combine short inputs, case studies and group work on participants' own files, and the city's institutions can be added as a study visit on request.
交通: 仁川国际机场(ICN)。
使用免费的签证查询工具确认您是否需要签证,完成报名后即可申请邀请函。
其他城市的同主题培训
- Public Hospital Infectious Disease Infrastructure & Biosafety in Kuala Lumpur (Kuala Lumpur)
- Medical Waste and Biohazard Disposal Operations in Kigali (Kigali)
- Infection Prevention and Control in Clinical Facilities in Johannesburg (Johannesburg)
- Health Facility Infrastructure Upgrading & Operational Planning in Accra (Accra)
- Primary Health Facility Upgrading and Service Quality Audits in Kigali (Kigali)
- Health Facility Upgrading and Medical Waste System Compliance in Nadi (Nadi)
首尔的其他培训项目
- Government Cloud Adoption, Interoperability & Data Governance in Seoul
- Socioemotional Curriculum Design and Rural Youth Enterprise Incubation in Seoul
- Inter-Urban Freight Corridor Logistics and Rural Road Asset Maintenance in Seoul
- Performance-Based Intergovernmental Fiscal Transfers Management in Seoul
- Modern Cadastral Surveying & Integrated Land Information Systems in Seoul
相关:气候融资与能源培训项目 · 免费气候融资提案准备度评估 · 全部培训项目
- 《联合国气候变化框架公约》 UNFCCC
- 美国项目管理协会(PMI) PMI
- 项目采购框架与条例 世界银行
For teams and institutions
Bring your team
Teams that learn together apply more at work. Tell us how many people and how you would like to take part: we reply with a group quote within two working days.
Other dates and cities for this subject: Climate Resilience and Adaptation training courses (97 upcoming dates).
Plan this programme in a roadmap: why it matters, why to approve it, the dates to plan and the career it builds.



