5-day programme

Wastewater Treatment Plant Operations & Sewer Network Modernisation in Istanbul

Dates15–19 Nov 2027
LocationIstanbul, Turkey
VenueShared on registration
Register by16 Oct 2027

Key facts

Dates
15–19 Nov 2027 (5 days)
Where
Istanbul, Turkey
Fee per participant
£2,350 (GBP)
Payment
By invoice and bank transfer
Registration closes
16 Oct 2027
Who it is for
Operations engineers from the Municipality of Baghdad; Technical directors from regional Iraqi water and sewerage directorates; Municipal wastewate…
Certificate
Certificate of completion
On this page 12 sections

Programme Overview

Municipal sanitation infrastructure across Iraq requires immediate technical reinforcement to safeguard public health and restore environmental stability.⁣​‌​‌​​‌​​‌‌​‌​‌‌​‌‌​​‌​‌​​‌‌​‌​‌​​‌​‌‌‌​​​‌‌​​​‌​‌‌‌‌​​​​‌‌​‌​​‌⁣ Rapid urban expansion, compounded by historical underinvestment, places extreme pressure on municipal sewage treatment facilities and collection networks. This five-day executive programme in Istanbul provides operational engineers and municipal leaders with actionable technical frameworks to optimise wastewater treatment processes, manage plant assets efficiently, and modernise deteriorated conveyance networks in compliance with international civil engineering and environmental standards.

Delivered through a rigorous technical syllabus, the course examines the end-to-end lifecycle of municipal wastewater management. Participants investigate advanced biological treatment mechanics, electromechanical maintenance systems, and trenchless pipeline rehabilitation technologies suitable for dense urban centres. By benchmarking regional practices against operational plants in Turkey, attendees acquire practical strategies to minimise process disruptions, manage heavy silt loadings, and modernise pumping stations while aligning works with international standards such as ISO 24511 and BS EN 752.

Beyond primary engineering interventions, the curriculum equips sanitation managers to institutionalise robust regulatory frameworks, compliance monitoring, and modern preventive maintenance regimes. Participants examine real-world operational protocols for supervisory control, asset condition grading, and water quality testing protocols under strict health, safety, and environmental parameters. The training ensures public sector bodies can effectively direct large-scale civil works, manage service contracts, and sustain essential urban sanitation assets over extended operational life cycles.

Urban centres across Iraq are undergoing significant infrastructure redevelopment to address longstanding public health challenges and acute water security risks.⁣​‌​‌​​‌​​‌‌​‌​‌‌​‌‌​​‌​‌​​‌‌​‌​‌​​‌​‌‌‌​​​‌‌​​​‌​‌‌‌‌​​​​‌‌​‌​​‌⁣ Massive capital programmes, such as the Baghdad Water Supply and Sewerage Improvement Project financed at US$210m, require operational staff to update legacy practices and supervise modern engineering works. Equipping regional water directorates and municipal engineers with contemporary technical knowledge ensures that newly financed sewage treatment facilities and rehabilitated conveyance networks achieve intended environmental performance targets and safeguard community wellbeing.

Delivered by Risalat Consultants International in Istanbul, Turkey, it combines expert-led sessions, real cases and group work, so that participants can apply what they learn in their own institution.

The Programme Strengthens Institutional Capability

  • Analysis of municipal wastewater characteristics, inflow variability, and heavy silt management
  • Screening systems, grit removal chambers, and pre-aeration basin operational optimisation
  • Primary sedimentation hydraulics and sludge collection equipment maintenance protocols
  • Odour control systems and health and safety management in hazardous utility environments
  • Process control parameters: COD, BOD, TSS, and volatile fatty acid monitoring protocols
  • Activated sludge process control: Mean Cell Residence Time and Food to Microorganism ratios
  • Aeration basin oxygen transfer efficiency, blower management, and diffuser maintenance
  • Biological nutrient removal: nitrification, denitrification, and chemical phosphorus precipitation
  • Climate and environmental risk assessment
  • Adaptation and mitigation planning
  • Sector strategies for energy, water and land
  • Project design for climate and environmental goals

It is designed for operations engineers from the Municipality of Baghdad, technical directors from regional Iraqi water and sewerage directorates, municipal wastewater treatment plant managers and process supervisors and others who want practical, current skills in climate, environment and natural resources.


The Growing Importance of Wastewater Treatment Plant Operations & Sewer Network Modernisation in Istanbul

Climate change, environmental pressure and resource management now shape national plans, budgets and investment decisions. Financiers increasingly expect climate and environmental considerations to be built into projects from the start.

Institutions that can plan for climate risks, manage natural resources well and prepare sound proposals are better placed to protect services and to access the funding available for this work.

Organisations increasingly require professionals capable of:

  • Assess climate and environmental risks to their services and assets
  • Design projects that meet climate and environmental goals
  • Prepare proposals that financiers can approve
  • Measure and report results credibly
  • Work with communities and partners across sectors

Strong climate, environment and natural resources systems help organisations:

  • Protect services and infrastructure from climate risks
  • Access climate and environmental finance
  • Meet national and international commitments
  • Use natural resources sustainably

This Wastewater Treatment Plant Operations & Sewer Network Modernisation in Istanbul programme brings these elements together in a practical format, so that participants understand not only what good practice looks like but also how to introduce it in their own setting, with the people and resources they have.


Who Should Attend This Wastewater Treatment Plant Operations & Sewer Network Modernisation in Istanbul Training?

This programme is designed for:

  • Operations engineers from the Municipality of Baghdad
  • Technical directors from regional Iraqi water and sewerage directorates
  • Municipal wastewater treatment plant managers and process supervisors
  • Civil engineers managing urban drainage and sewer rehabilitation contracts
  • Asset management and electromechanical maintenance engineers from public utilities
  • Environmental monitoring specialists and effluent quality compliance officers
  • Project management unit engineers overseeing donor-financed sanitation investments
  • Sanitation planning officers responsible for municipal master plans and network expansion
  • Climate change and environment officers
  • Energy, water and agriculture sector staff
  • Planning and policy officers
  • Project and programme managers

The programme suits experienced professionals as well as those moving into new responsibilities. Groups that mix institutions and countries are encouraged, because participants learn a great deal from each other’s experience.

Check the fit for your team

Tick what your team needs to be able to do.

Tick the items that apply

Wastewater Treatment Plant Operations & Sewer Network Modernisation in Istanbul Training Objectives

Upon successful completion of this Wastewater Treatment Plant Operations & Sewer Network Modernisation in Istanbul Training, participants will be able to:

  • Master core process control parameters for municipal biological wastewater treatment plants
  • Assess structural sewer conditions using standardised visual inspection and CCTV grading frameworks
  • Evaluate trenchless and open-cut pipeline modernisation techniques for urban drainage networks
  • Implement international effluent quality testing regimes aligned with ISO 5667 sampling standards
  • Develop preventive maintenance schedules for high-capacity pumping stations and electromechanical assets
  • Establish SCADA and operational data frameworks to manage industrial inflow and urban stormwater surges
  • Formulate supervisory protocols to monitor contractor compliance during large-scale sanitation civil works
  • Explain the main climate and environmental challenges for their sector
  • Assess climate and environmental risks to services and assets
  • Plan adaptation and mitigation measures

Each objective is practised during the programme through exercises, cases or group work, so that participants leave able to do it, not only to describe it.


Programme Contents and Structure

Your 5-day journey tap a day to see the sessions
    • Municipal Wastewater Process Engineering and Preliminary Treatment Operations & Sewer Network Modernisation
    • Analysis of municipal wastewater characteristics, inflow variability, and heavy silt management
    • Screening systems, grit removal chambers, and pre-aeration basin operational optimisation
    • Primary sedimentation hydraulics and sludge collection equipment maintenance protocols
    • Odour control systems and health and safety management in hazardous utility environments
    • Process control parameters: COD, BOD, TSS, and volatile fatty acid monitoring protocols
Full day-by-day contents

The programme runs over 5 days. Each day combines expert input, practical work and a closing workshop or case study:

  • First Day: Municipal Wastewater Process Engineering and Preliminary Treatment Operations
  • Second Day: Biological Treatment Optimisation, Nutrient Removal, and Quality Assurance
  • Third Day: Sewer Network Modernisation, Structural Assessment, and Asset Management
  • Fourth Day: Pipeline Rehabilitation Technologies and Urban Civil Works Oversight
  • Fifth Day: Sludge Handling, SCADA Integration, and Operational Contingency Planning

Full day-by-day contents

First Day | Municipal Wastewater Process Engineering and Preliminary Treatment Operations & Sewer Network Modernisation

  • Analysis of municipal wastewater characteristics, inflow variability, and heavy silt management
  • Screening systems, grit removal chambers, and pre-aeration basin operational optimisation
  • Primary sedimentation hydraulics and sludge collection equipment maintenance protocols
  • Odour control systems and health and safety management in hazardous utility environments
  • Process control parameters: COD, BOD, TSS, and volatile fatty acid monitoring protocols

Workshop: Municipal Wastewater Process Engineering and Preliminary Treatment Operations: Applying It to Your Institution

Working in small groups, participants apply the day's methods to examples from their own institutions and agree practical next steps.

Second Day | Biological Treatment Optimisation, Nutrient Removal, and Quality Assurance

  • Activated sludge process control: Mean Cell Residence Time and Food to Microorganism ratios
  • Aeration basin oxygen transfer efficiency, blower management, and diffuser maintenance
  • Biological nutrient removal: nitrification, denitrification, and chemical phosphorus precipitation
  • Secondary clarifier hydraulics, return activated sludge rates, and sludge bulking resolution
  • Effluent quality verification, disinfection systems, and compliance reporting under ISO 24511

Workshop: Biological Treatment Optimisation, Nutrient Removal, and Quality Assurance: Applying It to Your Institution

Working in small groups, participants apply the day's methods to examples from their own institutions and agree practical next steps.

Third Day | Sewer Network Modernisation, Structural Assessment, and Asset Management

  • Assessment of legacy gravity sewers and trunk mains using BS EN 752 operational principles
  • Closed-Circuit Television condition coding, defect classification, and pipeline risk grading
  • Infiltration, inflow, and illegal discharge detection methods using hydraulic modelling data
  • Pumping station refurbishment: dry-well and wet-well pump configurations and surge suppression
  • Long-term sewer asset registries and lifecycle capital planning for municipal network modernisations

Case Study: Sewer Network Modernisation, Structural Assessment, and Asset Management in Practice

Participants analyse a realistic case, compare the choices made with good practice and draw lessons they can use in their own setting.

Fourth Day | Pipeline Rehabilitation Technologies and Urban Civil Works Oversight

  • Evaluation of Cured-In-Place Pipe, sliplining, and pipe-bursting trenchless technologies
  • Open-cut excavation management in high-density urban corridors: shoring, traffic, and utilities
  • Materials selection for aggressive sewage environments: HDPE, GRP, and vitrified clay pipes
  • Testing newly laid and rehabilitated conduits: hydrostatic pressure and air integrity testing
  • Supervision of contractor civil works under international standard conditions of contract

Workshop: Pipeline Rehabilitation Technologies and Urban Civil Works Oversight: Applying It to Your Institution

Working in small groups, participants apply the day's methods to examples from their own institutions and agree practical next steps.

Fifth Day | Sludge Handling, SCADA Integration, and Operational Contingency Planning

  • Sludge thickening, conditioning, and mechanical dewatering using belt filter presses and centrifuges
  • Anaerobic digestion basics, biogas safety management, and municipal biosolids disposal standards
  • SCADA implementation, online instrumentation calibration, and automated network telemetry
  • Emergency response protocols for plant power outages, toxic industrial inflows, and extreme storms
  • Formulation of individual utility action plans and maintenance governance improvement schedules

Capstone Exercise: Wastewater Treatment Plant Operations & Sewer Network Modernisation in Istanbul Action Plan for Your Institution

Participants bring the week together in an action plan for their own institution, with priorities, owners and first steps, and present it for feedback from peers and facilitators.


Wastewater Treatment Plant Operations & Sewer Network Modernisation in Istanbul Training Methodology

The programme employs adult learning methods geared specifically toward municipal technical personnel and engineering managers. Classroom lectures are anchored in international operational standards, supported by comparative analyses of modernised Turkish municipal wastewater schemes. Participants engage in practical diagnostic workshops, engineering calculation exercises for biological processes, and pipeline defect interpretation sessions using real CCTV footage. Working in multidisciplinary teams, attendees complete an integrated operations and maintenance scheduling project directly transferable to their home directorates.

The programme combines:

  • Expert-led sessions on current practice
  • Regional and international case studies
  • Group work and practical exercises
  • Simulations and role plays where relevant
  • Discussion of participants' own challenges
  • Peer learning across institutions and countries
  • Practical tools and templates to take back to work
  • Daily reflection and action planning

Before the programme, a short pre-assessment helps the facilitators understand each participant’s role and priorities, so that examples and exercises can be adjusted to the group.⁣​‌​‌​​‌​​‌‌​‌​‌‌​‌‌​​‌​‌​​‌‌​‌​‌​​‌​‌‌‌​​​‌‌​​​‌​‌‌‌‌​​​​‌‌​‌​​‌⁣ Each day ends with a short reflection in which participants note what they will apply at work.


Expected Outcomes

Upon completion of this Wastewater Treatment Plant Operations & Sewer Network Modernisation in Istanbul Training, participants will be able to:

  • Improved operational efficiency of municipal biological treatment stages under fluctuating influent loads
  • Standardised defect classification for sewer networks to prioritise rehabilitation investments accurately
  • Selection of appropriate, cost-effective trenchless pipe repair methods for congested urban settings
  • Enhanced laboratory and field monitoring procedures meeting international effluent discharge standards
  • Comprehensive preventive maintenance programmes that reduce electromechanical breakdown frequency
  • Strengthened supervisory control over donor-financed contractor operations during network renewal projects
  • Assess climate and environmental risks
  • Plan adaptation and mitigation measures

Participants leave with a personal action plan and practical tools they can use in their institution from the first week back. Institutions that send several participants can use the programme to agree shared methods and templates across teams, which makes improvements easier to sustain.

Plan your team's places

£2,350 per participant · invoice and bank transfer · groups of 5 or more receive a discount

1participant(s)
£2,350at the standard fee

Registration closes in 342 days (16 Oct 2027)


Institutional Application of Wastewater Treatment Plant Operations & Sewer Network Modernisation in Istanbul Training

This programme supports organisations in strengthening:

  • Climate and environmental planning
  • Project design
  • Access to finance
  • Results measurement
  • Stakeholder involvement

Participants return with practical tools to improve:

  • Risk assessments
  • Concept notes
  • Results frameworks
  • Monitoring systems
  • Partnership arrangements

The programme is built so that learning moves from the classroom into the institution. Participants work on their own processes and documents where possible, and leave with an action plan that their managers can review and support.


Regional Relevance & Application

Europe

European institutions apply climate, environment and natural resources within detailed regulatory frameworks and reform agendas. Participants from Europe can compare their practice with colleagues from other regions and test how established methods work under different conditions.

Africa

Across Africa, ministries, agencies and project teams working in climate, environment and natural resources increasingly operate alongside donor-financed programmes that expect clear systems and evidence. The programme helps participants adapt good practice to the institutions and resources they work with.

Middle East

In the Middle East, national development strategies and diversification plans place growing demands on climate, environment and natural resources. Participants explore how to build the capability these plans need inside public bodies and companies.

Asia

Institutions across Asia combine rapid growth with ambitious modernisation programmes. Participants from Asia can share their experience of scaling systems quickly and learn from approaches used elsewhere.

Pacific

Small island and Pacific states face particular constraints of size, distance and capacity. The programme highlights practical, proportionate approaches to climate, environment and natural resources that suit smaller institutions.

Holding the programme in Istanbul, Turkey brings participants together away from their daily pressures, so they can compare how climate, environment and natural resources is handled in different settings. The same programme can also be delivered in-house for one institution, in its own country or online, with cases taken from its current work.

  1. Funds
  2. Entity
  3. Project
  4. Results
  5. MRV
How climate finance flowsThis programme works through: Funds, Project, Results, MRV (highlighted).Funders trace the climate rationale through every link, so a proposal has to show it at each step.

Host Country Profile – Turkey

Programmes, Workshops, Exposures, Training Courses in Istanbul, Turkey by Risalat Consultants International

Studying away from their own country gives participants time to focus, a fresh view of their own institution and the chance to build a network with colleagues from other countries.


Wastewater Treatment Plant Operations & Sewer Network Modernisation in Istanbul Training Deliverables

Participants receive support before, during and after the programme, so that preparation, learning and follow-up form one continuous experience.

Before the Programme

  • Participant Pre-Assessment
  • Wastewater Treatment Plant Operations & Sewer Network Modernisation in Istanbul Readiness Assessment
  • Wastewater Treatment Plant Operations & Sewer Network Modernisation in Istanbul Resource Pack
  • Preparatory Reading Materials
  • Complimentary Visa Support & Advisory

During the Programme

  • Airport Pickup & Welcome Assistance
  • Accommodation with Breakfast
  • Welcome Networking Dinner
  • Risalat Training Kit (Bag, Bottle, Mug, T-Shirt, Cap, Passport Cover, Pens, Notebook, Magnet & Keychain)
  • Comprehensive Wastewater Treatment Plant Operations & Sewer Network Modernisation in Istanbul Training Manual
  • Climate Risk Screening Checklist
  • Options Appraisal Template
  • Concept Note Template
  • Results Measurement Template
  • Practical Workshops & Simulations
  • Group Discussions & Peer Learning
  • Daily Lunch and Refreshments
  • Full Access to Training Venue Facilities
  • Mini Pad / Tablet with Digital Learning Materials
  • Field Visit (where applicable)
  • Entertaining City Tour

After the Programme

  • Certificate of Completion
  • Risalat Programme Participation Recognition Award
  • Post-Training Reference Materials
  • Funding Readiness Checklist
  • Monitoring and Reporting Template
  • Post-Training Support & Follow-Up Guidance
  • Programme Report

Institutions can also request a tailored in-house version of this programme, delivered at their premises or online. Request a proposal.


Common Challenges in Wastewater Treatment Plant Operations & Sewer Network Modernisation in Istanbul, And How This Training Helps

How can institutions assess climate and environmental risks to their services and assets?

The programme addresses this directly on the first day (Municipal Wastewater Process Engineering and Preliminary Treatment Operations), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.

How can institutions design projects that meet climate and environmental goals?

The programme addresses this directly on the second day (Biological Treatment Optimisation, Nutrient Removal, and Quality Assurance), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.

How can institutions prepare proposals that financiers can approve?

The programme addresses this directly on the third day (Sewer Network Modernisation, Structural Assessment, and Asset Management), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.

How can institutions measure and report results credibly?

The programme addresses this directly on the fourth day (Pipeline Rehabilitation Technologies and Urban Civil Works Oversight), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.

How can institutions work with communities and partners across sectors?

The programme addresses this directly on the fifth day (Sludge Handling, SCADA Integration, and Operational Contingency Planning), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.


Frequently Asked Questions

When and where does the Wastewater Treatment Plant Operations & Sewer Network Modernisation in Istanbul programme take place?

It runs from 15 Nov 2027 to 19 Nov 2027, in Istanbul, Turkey. The registration deadline is shown at the top of this page.

Who should attend?

The programme is designed for operations engineers from the Municipality of Baghdad, technical directors from regional Iraqi water and sewerage directorates, municipal wastewater treatment plant managers and process supervisors, civil engineers managing urban drainage and sewer rehabilitation contracts, and others who want practical skills in climate, environment and natural resources.

Will I receive a certificate?

Yes. Participants who complete the programme receive a Certificate of Completion from Risalat Consultants International.

Can this programme be delivered for our institution only?

Yes. We can deliver a tailored in-house version at your premises, in another city or online, built around your own cases. Use the proposal request on this page.

Do I need prior experience in climate, environment and natural resources?

No specialist background is required beyond experience in a related role. A short pre-assessment helps the facilitators adapt the sessions to the group.

Training courses in Istanbul

Why Istanbul for this programme

Istanbul sits between Europe and Asia, with direct flights from most capitals and easy visas for many delegations.

The Wastewater Treatment Plant Operations & Sewer Network Modernisation in Istanbul programme in November 2027 brings together officials and professionals from across the Europe and Asia region and beyond. Sessions combine short inputs, case studies and group work on participants' own files, and the city's institutions can be added as a study visit on request.

Getting there: Istanbul Airport (IST).

Check whether you need a visa with the free Visa Checker, and ask for an invitation letter once you are registered.

The same topic in other cities

Other programmes in Istanbul

More training courses in Türkiye · All programmes in Europe · Full training calendar

Plan this programme in a roadmap: why it matters, why to approve it, the dates to plan and the career it builds.

Fee per participant£2,350Register →