Key takeaways
- Timor-Leste has 8 active World Bank projects worth about US$307 million.
- Most delays and extra costs start before the first contract. land, designs, procurement plans, safeguards and team readiness.
- A short readiness check at the start saves months later.
- Teams that plan, procure and manage contracts well disburse on time and keep their results.
Introduction
Governments in Timor-Leste are implementing a large portfolio of World Bank financed projects. The money is committed; the challenge is to turn it into results on time and within budget. This article looks at the portfolio, the problems that usually slow projects of these kinds, and what project teams can do before work starts.
What the money is for
The largest active projects are listed below, from the World Bank’s public project records.
| Project | Approved | World Bank financing | Sector |
|---|---|---|---|
| Dili Water Supply Project | 2022 | US$121.0m | Water Supply, Other Agriculture, Fishing and Forestry |
| Timor-Leste Branch Roads Project | 2019 | US$59.0m | Rural and Inter-Urban Roads, Public Administration – Transportation |
| Healthcare Action Through Rapid Infrastructure Improvements (“HARI'I”) Project | 2023 | US$50.0m | Health, Public Administration – Health |
| Timor Leste Water Supply and Sanitation Project | 2020 | US$25.0m | Water Supply, Sanitation |
| Basic Education Strengthening and Transformation Project | 2020 | US$23.6m | Secondary Education, Primary Education |
| Sustainable Agriculture Productivity Improvement Project | US$21.0m | Livestock, Crops | |
| Timor-Leste COVID-19 Response and Health System Preparedness Project | US$5.0m | Health, Public Administration – Health | |
| Timor-Leste COVID-19 and Health Systems Strengthening Support Project | US$2.8m | Health, Public Administration – Health |
Water, sanitation and irrigation: what usually goes wrong, and how to prevent it
- Designs do not reflect site conditions and are changed during works. Design reviews and site verification before tender; a change control procedure.
- Schemes are built but not maintained by the users or the utility. User or utility agreements, tariffs and maintenance plans prepared with the works.
- Environmental and social issues stop works. E&S instruments ready and staffed before contractors mobilise; working grievance mechanism.
Transport and urban infrastructure: what usually goes wrong, and how to prevent it
- Resettlement and utility relocation delay the start of works. Resettlement plans and relocation agreed and funded before contract award.
- Contract variations and claims raise costs. Strong contract management: named contract managers, monthly reports, variation control.
- Weak supervision leads to defects. Clear supervision roles, quality plans and independent checks at key stages.
Health and nutrition: what usually goes wrong, and how to prevent it
- Supplies and equipment arrive before facilities or staff are ready. Sequenced plans that link procurement, works, staffing and training.
- Results are hard to verify. A results framework with verifiable indicators and simple data routines.
- Facilities lack maintenance and running budgets. Maintenance plans and budget lines agreed with the ministry early.
Education and skills: what usually goes wrong, and how to prevent it
- Training reaches staff but practice does not change. Needs-based programmes with coaching and follow-up on action plans.
- Data on learning and teachers is weak. Assessment and information systems designed with the people who will use them.
- School works fall behind. Community and contractor arrangements prepared before funds flow.
A readiness check before the first contract
- Designs, land and permits ready for the first contracts.
- A realistic procurement plan with trained evaluation committees.
- Environmental and social instruments approved and staffed.
- Financial management, disbursement and audit arrangements tested.
- A results framework the team can actually report on.
- A project unit with the people, authority and tools to decide quickly.
How Risalat can help
Risalat works with ministries and project teams on exactly these points, openly showing its method:
- Project Delivery and Implementation Support: Getting a slow donor-financed project moving: governance, procurement, disbursement and results.
- Procurement Systems and Reform: Faster, fairer procurement: assessment, rules, e-procurement, skills and contract performance.
- Environmental and Social Risk Management: ESF and safeguards that protect people and do not stop the works.
- Institutional and Digital Transformation: Governance, processes, people, systems and data working together around performance.
- Project Health Check and the transformation blueprints: free, online, a baseline in minutes.
Programmes for teams from Timor-Leste:
- Smallholder Horticulture Production and Post-Harvest Cooling in Bangkok
- Upland Watershed Conservation and Agrosilvopastoral Systems in Bali
- Primary School Facility Maintenance and Community Grant Audits in Dili
- Bilingual Basic Literacy Pedagogy and Early Grade Reading Tools in Lisbon
- Healthcare Facility Climate-Resilient Design and Civil Works in Singapore
- Branch Road Asset Management and Maintenance Contracting in Bangkok
- Municipal Piped Water Network Operations and NRW Reduction in Dili
To discuss support for a specific project, ask for a proposal.
Source of project data: World Bank project records (projects.worldbank.org), read November 2026.
- Procurement Framework and Regulations for Projects World Bank
- MAPS: Methodology for Assessing Procurement Systems MAPS Initiative
- Open Contracting Partnership Open Contracting Partnership
Know people who should read this? Become an Ambassador or write with Risalat.
Partners in project success since 2011, diagnostics, advisory support and applied learning for ministries, public agencies and project teams.
Need help putting this into practice?
Start with a free 10-minute diagnostic or talk to our experts.