Points clés
- Dates
- 7–11 Jun 2027 (5 days)
- Lieu
- Johannesburg, South Africa
- Frais par participant
- 2 750 £ (GBP)
- Paiement
- Sur facture et par virement bancaire
- Clôture des inscriptions
- 8 May 2027
- À qui s'adresse-t-il
- High-voltage transmission substation design engineers; Power system protection and control specialists; Grid asset management engineers and technic…
- Certificat
- Certificat de participation
- Option intra
- Organisez-le pour votre équipe, à vos dates
Sur cette page 12 sections
Présentation du programme
High-voltage transmission systems require structured modernisation to improve operational security and accommodate rapid grid expansion. This five-day executive programme in Johannesburg equips engineering professionals with advanced methodologies for upgrading aged substation assets. Participants analyse air-insulated and gas-insulated switchgear refurbishments, contemporary bay topologies, and digital control integration. The curriculum bridges technical planning and practical implementation, addressing the operational complexities faced by utilities seeking to enhance transmission reliability across regional interconnections.
The course delivers comprehensive insight into modern protection schemes and dispatch integration. Attendees examine numerical relay architectures, line differential systems, distance protection, and IEC 61850 substation automation architectures. In parallel, the programme addresses operational coordination with National Dispatch Centres, focusing on real-time Supervisory Control and Data Acquisition (SCADA) integration, automated teleprotection signaling, and wide-area monitoring. These technical sessions ensure engineers can mitigate cascading disturbances and maintain steady-state grid security.
Designed specifically for public sector utilities and project implementation units, this training establishes practical competence in managing grid infrastructure contracts. The curriculum covers procurement packages, FIDIC contract conditions, quality verification, and factory acceptance testing regimes. Participants review rigorous pre-commissioning checklists and energisation protocols required for multilateral development bank financed projects. By mastering these management and engineering workflows, transmission authorities ensure assets are delivered safely, on schedule, and in full compliance with international standards.
Transmission utilities across Southern and Central Africa are undertaking large-scale grid rehabilitations, notably underpinning capital works such as the US$417m Angola Electricity Sector Improvement and Access Project. Engineering units require updated technical capacities to execute major grid extensions, modernise legacy substations, and coordinate multi-vendor protection systems without causing system outages. Managing these donor-financed capital works requires immediate mastery of modern protection philosophies, digital communication standards, and strict FIDIC contract compliance to prevent costly commissioning delays and operational failures.
Delivered by Risalat Consultants International in Johannesburg, South Africa, it combines expert-led sessions, real cases and group work, so that participants can apply what they learn in their own institution.
The Programme Strengthens Institutional Capability
- Assessment criteria for aged transmission assets and condition-based monitoring
- Air-insulated switchgear (AIS) versus gas-insulated switchgear (GIS) modernisation
- Instrument transformer selection and modernisation (CT, VT, and optical sensors)
- Civil structural adaptations and safety clearances during substation expansion
- Earth mat evaluation, surge arrester coordination, and high-voltage insulation audits
- Numerical protection relay principles, redundancy concepts, and trip logic
- IEC 61850 substation communications: Process bus, station bus, GOOSE, and Sampled Values
- Transmission line protection: Distance protection (ANSI 21) and line differential (ANSI 87L)
- Planification des achats et analyse de marché
- Choisir les méthodes et approches de passation des marchés
- Rédiger des spécifications et des termes de référence
- Dossiers d'appel d'offres et critères d'évaluation
It is designed for high-voltage transmission substation design engineers, power system protection and control specialists, grid asset management engineers and technical directors and others who want practical, current skills in procurement and contract management.
- Intrants
- Activités
- Produits
- Effets
- Impact
The Growing Importance of HV Transmission Substation Modernisation and Dispatch Network Protection in Johannesburg
C'est par la passation des marchés que l'argent public se transforme en routes, en médicaments, en systèmes et en services. Les retards, les spécifications insuffisantes et une mauvaise gestion des contrats comptent parmi les causes les plus fréquentes de retard des projets ou d'échec aux audits.
Les financeurs et les gouvernements attendent désormais l'optimisation des ressources, une concurrence loyale et des décisions bien documentées à chaque étape, de la planification à l'achèvement du contrat. Les équipes qui maîtrisent l'ensemble du cycle obtiennent des résultats plus rapidement et suscitent moins de plaintes.
Les organisations ont de plus en plus besoin de professionnels capables de :
- Planifier des marchés adaptés aux besoins et au calendrier du projet
- Rédiger des spécifications et des critères d'évaluation clairs
- Évaluer les offres de manière cohérente et défendre la décision
- Gérer les contrats, les avenants et l'exécution
- Tenir des dossiers complets pour l'audit et l'examen
Des systèmes solides de passation et de gestion des marchés aident les organisations à :
- Réduire les retards de passation des marchés et les appels d'offres infructueux
- Optimiser l'utilisation des ressources
- Réduire le risque de plaintes et d'observations d'audit
- Exécuter les contrats dans les délais et selon la qualité requise
This HV Transmission Substation Modernisation and Dispatch Network Protection in Johannesburg programme brings these elements together in a practical format, so that participants understand not only what good practice looks like but also how to introduce it in their own setting, with the people and resources they have.
Who Should Attend This HV Transmission Substation Modernisation and Dispatch Network Protection in Johannesburg Training?
Ce programme s'adresse à :
- High-voltage transmission substation design engineers
- Power system protection and control specialists
- Grid asset management engineers and technical directors
- Electrical utility project implementation unit (PIU) managers
- National dispatch centre operations and SCADA engineers
- Substation commissioning and maintenance lead engineers
- Transmission network planning and development specialists
- Procurement specialists managing donor-funded electrical infrastructure packages
- Technical auditors evaluating power sector capital expenditure projects
- Responsables et chargés de la passation des marchés
- Gestionnaires et administrateurs de contrats
- Gestionnaires de projets et de programmes
Le programme convient aussi bien aux professionnels expérimentés qu’à ceux qui prennent de nouvelles responsabilités. Les groupes réunissant plusieurs institutions et pays sont encouragés, car les participants apprennent beaucoup de l’expérience des autres.
Cochez ce que votre équipe doit être capable de faire.
HV Transmission Substation Modernisation and Dispatch Network Protection in Johannesburg Training Objectives
Upon successful completion of this HV Transmission Substation Modernisation and Dispatch Network Protection in Johannesburg Training, participants will be able to:
- Evaluate high-voltage switchgear modernisation strategies for aged transmission substations
- Configure digital protection schemes using IEC 61850 communication and relay architectures
- Integrate substation automation systems with central SCADA and dispatch networks
- Formulate protection coordination matrices to isolate grid faults without wide-area disturbances
- Manage grid extension contracts in accordance with FIDIC and multilateral bank standards
- Execute rigorous factory acceptance testing and site commissioning verification procedures
- Develop operational risk management plans for live-substation refurbishment and cut-over works
- Expliquer le cycle de passation des marchés et les règles qui s'y appliquent
- Élaborer un plan de passation des marchés lié au calendrier du projet
- Choisir une méthode et une approche du marché adaptées
Chaque objectif est mis en pratique pendant le programme à travers des exercices, des études de cas ou des travaux de groupe, afin que les participants repartent capables de le faire, et pas seulement de le décrire.
Contenu et structure du programme
- Assessment criteria for aged transmission assets and condition-based monitoring
- Air-insulated switchgear (AIS) versus gas-insulated switchgear (GIS) modernisation
- Instrument transformer selection and modernisation (CT, VT, and optical sensors)
- Civil structural adaptations and safety clearances during substation expansion
- Earth mat evaluation, surge arrester coordination, and high-voltage insulation audits
- Numerical protection relay principles, redundancy concepts, and trip logic
- IEC 61850 substation communications: Process bus, station bus, GOOSE, and Sampled Values
- Transmission line protection: Distance protection (ANSI 21) and line differential (ANSI 87L)
- Power transformer protection: Biased differential, restricted earth fault, and thermal monitoring
- Busbar protection modernisation, breaker failure schemes, and auto-reclose protocols
- Remote Terminal Unit (RTU) configuration and modern Gateway communication protocols
- Integration of substation telemetry with National Dispatch Centres via IEC 60870-5-104
- Wide-Area Monitoring Systems (WAMS), Phasor Measurement Units (PMUs), and dynamic stability
- Teleprotection interfaces over optical fibre networks and power line carrier channels
- Cybersecurity controls for substation automation and SCADA systems under IEC 62443
- Structuring technical specifications for donor-funded high-voltage plant contracts
- FIDIC Yellow Book and Pink Book contract administration for plant and design-build packages
- Managing contractor claims, variation orders, and progress milestones in grid projects
- Factory Acceptance Testing (FAT) witnessing protocols and defect notification procedures
- Supply chain verification and quality surveillance for critical power transmission assets
- Site Acceptance Testing (SAT) frameworks for primary switchgear and secondary systems
- Protection relay scheme injection testing and CT secondary circuit verification
- Substation cut-over strategies, outage management, and live-system interface risks
- Pre-energisation safety audits, switching schedules, and initial energisation protocols
- Final handover documentation, as-built validation, and operational defect liability management
Contenu détaillé jour par jour
Le programme se déroule sur 5 jours. Chaque journée associe apports d'experts, travail pratique et un atelier ou une étude de cas de clôture :
- First Day: Substation Modernisation Methodologies and Primary Plant Refurbishment
- Second Day: Digital Protection Relaying, Architectures, and IEC 61850 Standards
- Third Day: Dispatch Integration, SCADA Telemetry, and Grid Automation
- Fourth Day: Contract Management and Procurement for Substation Packages
- Fifth Day: Testing Protocols, Commissioning, and Network Energisation
Contenu détaillé jour par jour
First Day | Substation Modernisation Methodologies and Primary Plant Refurbishment
- Assessment criteria for aged transmission assets and condition-based monitoring
- Air-insulated switchgear (AIS) versus gas-insulated switchgear (GIS) modernisation
- Instrument transformer selection and modernisation (CT, VT, and optical sensors)
- Civil structural adaptations and safety clearances during substation expansion
- Earth mat evaluation, surge arrester coordination, and high-voltage insulation audits
Workshop: Substation Modernisation Methodologies and Primary Plant Refurbishment: Applying It to Your Institution
En petits groupes, les participants appliquent les méthodes du jour à des exemples tirés de leurs institutions et conviennent d'étapes concrètes pour la suite.
Second Day | Digital Protection Relaying, Architectures, and IEC 61850 Standards
- Numerical protection relay principles, redundancy concepts, and trip logic
- IEC 61850 substation communications: Process bus, station bus, GOOSE, and Sampled Values
- Transmission line protection: Distance protection (ANSI 21) and line differential (ANSI 87L)
- Power transformer protection: Biased differential, restricted earth fault, and thermal monitoring
- Busbar protection modernisation, breaker failure schemes, and auto-reclose protocols
Workshop: Digital Protection Relaying, Architectures, and IEC 61850 Standards: Applying It to Your Institution
En petits groupes, les participants appliquent les méthodes du jour à des exemples tirés de leurs institutions et conviennent d'étapes concrètes pour la suite.
Third Day | Dispatch Integration, SCADA Telemetry, and Grid Automation
- Remote Terminal Unit (RTU) configuration and modern Gateway communication protocols
- Integration of substation telemetry with National Dispatch Centres via IEC 60870-5-104
- Wide-Area Monitoring Systems (WAMS), Phasor Measurement Units (PMUs), and dynamic stability
- Teleprotection interfaces over optical fibre networks and power line carrier channels
- Cybersecurity controls for substation automation and SCADA systems under IEC 62443
Case Study: Dispatch Integration, SCADA Telemetry, and Grid Automation in Practice
Les participants analysent un cas réaliste, comparent les choix effectués aux bonnes pratiques et en tirent des enseignements applicables à leur propre contexte.
Fourth Day | Contract Management and Procurement for Substation Packages
- Structuring technical specifications for donor-funded high-voltage plant contracts
- FIDIC Yellow Book and Pink Book contract administration for plant and design-build packages
- Managing contractor claims, variation orders, and progress milestones in grid projects
- Factory Acceptance Testing (FAT) witnessing protocols and defect notification procedures
- Supply chain verification and quality surveillance for critical power transmission assets
Workshop: Contract Management and Procurement for Substation Packages: Applying It to Your Institution
En petits groupes, les participants appliquent les méthodes du jour à des exemples tirés de leurs institutions et conviennent d'étapes concrètes pour la suite.
Fifth Day | Testing Protocols, Commissioning, and Network Energisation
- Site Acceptance Testing (SAT) frameworks for primary switchgear and secondary systems
- Protection relay scheme injection testing and CT secondary circuit verification
- Substation cut-over strategies, outage management, and live-system interface risks
- Pre-energisation safety audits, switching schedules, and initial energisation protocols
- Final handover documentation, as-built validation, and operational defect liability management
Capstone Exercise: HV Transmission Substation Modernisation and Dispatch Network Protection in Johannesburg Action Plan for Your Institution
Les participants synthétisent la semaine dans un plan d'action pour leur institution, avec des priorités, des responsables et des premières étapes, puis le présentent à leurs pairs et aux animateurs pour recueillir leurs retours.
HV Transmission Substation Modernisation and Dispatch Network Protection in Johannesburg Training Methodology
The training is delivered through practical, instructor-led technical modules, detailed engineering case analyses, and interactive design exercises. Participants evaluate real-world single-line diagrams, relay coordination curves, and SCADA communication maps from operational transmission projects. Peer discussions, contract administration scenario workshops, and hands-on commissioning checklist development ensure technical standards and project management frameworks are directly applicable to ongoing utility modernisation initiatives.
Le programme associe :
- Sessions animées par des experts sur les pratiques actuelles
- Études de cas régionales et internationales
- Travaux de groupe et exercices pratiques
- Simulations et jeux de rôle le cas échéant
- Discussion des défis rencontrés par les participants dans l'exercice de leurs fonctions
- Apprentissage entre pairs, d'institutions et de pays différents
- Des outils et modèles pratiques à réutiliser au travail
- Réflexion quotidienne et plan d'action
Avant le programme, une courte pré-évaluation aide les animateurs à comprendre le rôle et les priorités de chaque participant, afin d’adapter les exemples et les exercices au groupe. Chaque journée se termine par une brève réflexion au cours de laquelle les participants notent ce qu’ils appliqueront dans leur travail.
Résultats attendus
Upon completion of this HV Transmission Substation Modernisation and Dispatch Network Protection in Johannesburg Training, participants will be able to:
- Capability to specify and assess modern high-voltage switchgear for brownfield refurbishment
- Competence in designing IEC 61850 compliant protection and substation automation systems
- Proficiency in integrating substation signals into national SCADA and dispatch operations
- Practical skill in managing FIDIC-based transmission plant construction contracts
- Expertise in executing structured factory and site acceptance testing procedures
- Confidence in planning safe switchover and network energisation sequences without outages
- Planifier des marchés adaptés aux besoins et au calendrier du projet
- Rédiger des spécifications et des critères d'évaluation clairs
Les participants repartent avec un plan d'action personnel et des outils pratiques utilisables dans leur institution dès la première semaine de retour. Les institutions qui envoient plusieurs participants peuvent s'appuyer sur le programme pour convenir de méthodes et de modèles communs entre équipes, ce qui facilite la pérennité des améliorations.
2 750 £ par participant · facture et virement bancaire · remise pour les groupes de 5 personnes ou plus
Cinq personnes ou plus d'une même organisation : demandez le tarif de groupe lors de votre demande de facture.
À partir de dix participants, une version intra pour votre institution peut revenir moins cher par personne. Demander un devis intra.
Registration closes in 176 days (8 May 2027)
Institutional Application of HV Transmission Substation Modernisation and Dispatch Network Protection in Johannesburg Training
Ce programme aide les organisations à renforcer :
- Planification et stratégie de passation des marchés
- Pratique de l'évaluation
- Gestion des contrats
- Traitement des plaintes
- Dossiers de passation des marchés et préparation aux audits
Les participants repartent avec des outils pratiques pour améliorer :
- Plans et calendriers de passation des marchés
- Spécifications et critères d'évaluation
- Rapports d'évaluation
- Suivi des contrats
- Gestion des avenants et des réclamations
Le programme est conçu pour que l'apprentissage passe de la salle de formation à l'institution. Les participants travaillent, dans la mesure du possible, sur leurs propres processus et documents, et repartent avec un plan d'action que leurs responsables peuvent examiner et soutenir.
Pertinence régionale & mise en application
Europe
Les institutions européennes pratiquent la passation et la gestion des marchés dans des cadres réglementaires détaillés et des programmes de réforme. Les participants européens peuvent comparer leurs pratiques avec celles de collègues d'autres régions et vérifier comment des méthodes établies fonctionnent dans des conditions différentes.
Afrique
À travers l'Afrique, les ministères, les agences et les équipes de projet chargés de la passation et de la gestion des marchés travaillent de plus en plus aux côtés de programmes financés par les bailleurs, qui attendent des systèmes clairs et des preuves. Le programme aide les participants à adapter les bonnes pratiques aux institutions et aux ressources avec lesquelles ils travaillent.
Moyen-Orient
Au Moyen-Orient, les stratégies nationales de développement et les plans de diversification sollicitent de plus en plus la passation et la gestion des marchés. Les participants examinent comment développer, au sein des organismes publics et des entreprises, les compétences dont ces plans ont besoin.
Asie
Les institutions asiatiques conjuguent croissance rapide et programmes de modernisation ambitieux. Les participants venus d'Asie peuvent partager leur expérience du déploiement rapide de systèmes à grande échelle et découvrir les approches adoptées ailleurs.
Pacifique
Les petits États insulaires et du Pacifique font face à des contraintes particulières de taille, de distance et de capacités. Le programme met en avant des approches pratiques et proportionnées de passation et de gestion des marchés, adaptées aux institutions de petite taille.
Holding the programme in Johannesburg, South Africa brings participants together away from their daily pressures, so they can compare how procurement and contract management is handled in different settings. The same programme can also be delivered in-house for one institution, in its own country or online, with cases taken from its current work.
Host Country Profile – South Africa
Risalat Consultants International runs open-enrolment training programmes in Johannesburg, South Africa for officials, project teams and professionals from across the region. Dates, fees and what each programme covers are listed above, and any programme can also be delivered in-house for your institution.
Se former hors de son pays permet aux participants de se concentrer, de porter un regard neuf sur leur propre institution et de constituer un réseau avec des collègues d'autres pays.
HV Transmission Substation Modernisation and Dispatch Network Protection in Johannesburg Training Deliverables
Les participants sont accompagnés avant, pendant et après le programme, afin que la préparation, l'apprentissage et le suivi forment une expérience continue.
Avant le programme
- Pré-évaluation des participants
- HV Transmission Substation Modernisation and Dispatch Network Protection in Johannesburg Readiness Assessment
- HV Transmission Substation Modernisation and Dispatch Network Protection in Johannesburg Resource Pack
- Lectures préparatoires
- Aide et conseils gratuits pour le visa
Pendant le programme
- Accueil à l'aéroport & assistance à l'arrivée
- Hébergement avec petit-déjeuner
- Dîner de bienvenue et de réseautage
- Kit de formation Risalat (sac, gourde, mug, t-shirt, casquette, protège-passeport, stylos, carnet, magnet & porte-clés)
- Comprehensive HV Transmission Substation Modernisation and Dispatch Network Protection in Johannesburg Training Manual
- Modèle de plan de passation des marchés
- Grille de notation pour l'évaluation des offres
- Modèle de plan de gestion des contrats
- Registre des avenants et des réclamations
- Ateliers pratiques & simulations
- Discussions de groupe & apprentissage entre pairs
- Déjeuner et pauses-café quotidiens
- Accès complet aux installations du lieu de formation
- Mini tablette avec supports pédagogiques numériques
- Visite de terrain (le cas échéant)
- Visite récréative de la ville
Après le programme
- Certificat de participation
- Distinction Risalat de participation au programme
- Documents de référence après la formation
- Liste de contrôle des dossiers de passation des marchés
- Outil de suivi de l'exécution des contrats
- Accompagnement après la formation & conseils de suivi
- Rapport du programme
Les institutions peuvent aussi demander une version intra sur mesure de ce programme, dispensée dans leurs locaux ou en ligne. Demander une proposition.
Common Challenges in HV Transmission Substation Modernisation and Dispatch Network Protection in Johannesburg, And How This Training Helps
Comment les institutions peuvent-elles planifier des marchés adaptés aux besoins et au calendrier du projet ?
The programme addresses this directly on the first day (Substation Modernisation Methodologies and Primary Plant Refurbishment), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
Comment les institutions peuvent-elles rédiger des spécifications et des critères d'évaluation clairs ?
The programme addresses this directly on the second day (Digital Protection Relaying, Architectures, and IEC 61850 Standards), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
Comment les institutions peuvent-elles évaluer les offres de manière cohérente et défendre la décision ?
The programme addresses this directly on the third day (Dispatch Integration, SCADA Telemetry, and Grid Automation), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
Comment les institutions peuvent-elles gérer les contrats, les avenants et l'exécution ?
The programme addresses this directly on the fourth day (Contract Management and Procurement for Substation Packages), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
Comment les institutions peuvent-elles tenir des dossiers complets pour l'audit et l'examen ?
The programme addresses this directly on the fifth day (Testing Protocols, Commissioning, and Network Energisation), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
Questions fréquentes
When and where does the HV Transmission Substation Modernisation and Dispatch Network Protection in Johannesburg programme take place?
It runs from 7 Jun 2027 to 11 Jun 2027, in Johannesburg, South Africa. The registration deadline is shown at the top of this page.
Qui devrait participer ?
The programme is designed for high-voltage transmission substation design engineers, power system protection and control specialists, grid asset management engineers and technical directors, electrical utility project implementation unit (PIU) managers, and others who want practical skills in procurement and contract management.
Recevrai-je un certificat ?
Oui. Les participants qui terminent le programme reçoivent un certificat de participation délivré par Risalat Consultants International.
Ce programme peut-il être dispensé pour notre seule institution ?
Oui. Nous pouvons proposer une version intra sur mesure dans vos locaux, dans une autre ville ou en ligne, construite autour de vos propres cas. Utilisez la demande de proposition sur cette page.
Faut-il une expérience préalable en passation et gestion des marchés ?
Aucune formation spécialisée n'est requise au-delà d'une expérience dans une fonction similaire. Une courte pré-évaluation aide les animateurs à adapter les sessions au groupe.
Who Will Deliver This Programme
Each date is delivered by a team assigned from Risalat's expert network for this subject. For this programme we assign:
How we choose them: Experience in the region of the participants or comparable settings; Command of the financier rules that apply (World Bank, ADB, AfDB, EU, UN) where relevant; Delivery in English; other languages on request for in-house groups; No conflict of interest with participants' institutions.
Names and short CVs of the assigned experts are shared with registered participants and sponsoring organisations before the programme, on request. Are you an expert in this subject? Join our expert network.
Training courses in JohannesburgEnergy and Water training courses
Why Johannesburg for this programme
Johannesburg is Southern Africa's business centre with a wide flight network.
The HV Transmission Substation Modernisation and Dispatch Network Protection in Johannesburg programme in June 2027 brings together officials and professionals from across the Africa region and beyond. Sessions combine short inputs, case studies and group work on participants' own files, and the city's institutions can be added as a study visit on request.
Getting there: O. R. Tambo (JNB).
Vérifiez si vous avez besoin d'un visa avec le vérificateur de visa gratuit, et demandez une lettre d'invitation une fois inscrit.
Le même thème dans d'autres villes
- Cross-Border Power Interconnection and Regional Grid Operations in Cape Town (Cape Town)
- Power Grid Modernisation and Smart Transmission Asset Management in Cape Town (Cape Town)
- Cross-Border Subsea and Grid Interconnection Engineering in Baku (Baku)
- Power Grid Modernisation and Transmission Network Resilience in Vienna (Vienna)
- HVDC & EHV Transmission Grid Asset Management and Automation in Baku (Baku)
Other programmes in Johannesburg
- Feed-in-Tariff Structuring and Renewable Power Cost-of-Service Modelling in Johannesburg
- Runway Civil Works Supervision and Airfield Pavement Quality Control in Johannesburg
- Smallholder Irrigation Scheme Rehabilitation and Water User Association Setup in Johannesburg
- Supervisory Control and Data Acquisition (SCADA) in Water Systems in Johannesburg
- Independent Power Producer Procurement & Power Purchase Agreements in Johannesburg
- Cadre de passation des marchés et Règlement applicable aux projets Banque mondiale
- MAPS : méthodologie d'évaluation des systèmes de passation des marchés Initiative MAPS
- Open Contracting Partnership Open Contracting Partnership
For teams and institutions
Bring your team
Teams that learn together apply more at work. Tell us how many people and how you would like to take part: we reply with a group quote within two working days.
More training courses in South Africa · Tous les programmes en Afrique · Calendrier complet des formations
Plan this programme in a roadmap: why it matters, why to approve it, the dates to plan and the career it builds.



