Key facts
- Dates
- 25–29 Jan 2027 (5 days)
- Where
- Hotel Niwa Tokyo, Tokyo, Japan
- Fee per participant
- £3,820 (GBP)
- Payment
- By invoice and bank transfer
- Registration closes
- 6 Dec 2026
- Certificate
- Certificate of completion
- In-house option
- Run it for your team, on your dates
On this page 16 sections
Programme Overview
Quality on a construction site is decided long before handover. It is shaped by the specification, the mix design, the inspection and test plan, the competence of site inspectors and the discipline with which non-conformities are recorded and closed. When any of these links is weak, defects appear late, rework consumes budget and contingency, and the asset owner inherits a maintenance burden that lasts decades.
Financiers are explicit about this. Self-evaluation lessons published by the Asian Development Bank on road sector projects point to substandard works caused by inadequate designs and poor materials, and recommend that contractors be held to the specification before the defects liability period ends. Another ADB lesson describes how an unusually low consultant bid led to design work being subcontracted to underpaid firms, producing poor surveys and design corrections during construction.
Testing itself is often the weak point. A study on materials testing laboratories in Mozambique, prepared for the UK-funded AfCAP research programme, found unreliable results, missing traceable calibration, little oversight of contractor and supervising-engineer site laboratories and a mix of test standards that made results hard to compare.
The quality management framework is also changing. ISO published ISO 9001:2026 on 16 September 2026, with stronger emphasis on leadership, quality culture and ethical behaviour, and a clearer treatment of risks and opportunities. Certification bodies expect a transition period of around three years, so contractors, consultants and owners will be updating their quality manuals and audit approaches during the life of current projects.
This Construction Quality Control Training in Tokyo brings these issues together with the technical core that site teams need: concrete production and testing, reinforcement and corrosion protection, welding of steel structures, statistical evaluation of test data and site quality audits. Japan offers a strong benchmark, from its national bridge inspection regime to the i-Construction 2.0 drive for digital construction management.
The Programme Strengthens Institutional Capability
- Construction quality management systems aligned with ISO 9001:2026
- Quality assurance and quality control roles of owner, engineer and contractor
- Inspection and test plans with hold and witness points
- Concrete mix design review and ready-mix supply control
- Pre-concreting checks, formwork and placement supervision
- Fresh and hardened concrete testing, including cubes and cylinders
- Non-destructive testing: rebound hammer, ultrasonic pulse velocity, pull-out and cores
- Reinforcement inspection, cover control and splice verification
- Corrosion mechanisms and protection systems for steel and concrete
- Welding procedure qualification and weld inspection for steel structures
- Statistical quality control, control charts and Pareto analysis
- Acceptance criteria and evaluation of compliance with specifications
- Non-conformance reporting, corrective and preventive action
- Site quality audits and supervision consultant performance
- Materials testing laboratory reliability and calibration
- Quality control for equipment installation, tanks and foundations
- Quality records, handover documentation and the defects liability period
- Digital inspection records and data-driven quality management
The result is a shared, practical language of quality between engineers, inspectors and managers, supported by tools that can be applied on the next pour, the next weld inspection and the next quality audit.
- Transaction
- Record
- Control
- Evidence
- Opinion
The Growing Importance of Construction Quality Control
Infrastructure investment is large and long-lived, and quality failures are expensive to correct after construction. Japan’s own experience makes the point: after the 2012 Sasago Tunnel ceiling collapse, the Road Act was amended and, since 2014, road administrators must carry out close visual inspections of bridges and tunnels once every five years. With around 730,000 road bridges and a rising share over 50 years old, the cost of early defects is visible in every maintenance budget.
Japan has also made quality a pillar of its development cooperation. The G20 Principles for Quality Infrastructure Investment, endorsed in Osaka in 2019, stress economic efficiency over the life cycle, and JICA supports bridge inspection and maintenance capacity in countries such as Tajikistan and Zambia. For borrowers, this means quality is assessed over the whole life of the asset, not just at handover.
Organisations increasingly require professionals capable of:
- Writing and enforcing inspection and test plans
- Reviewing concrete mix designs and trial mix results
- Supervising pre-concreting checks and placement
- Interpreting cube, cylinder and core test results
- Selecting and interpreting non-destructive tests
- Checking reinforcement, cover and corrosion protection
- Reviewing welding procedures and welder qualifications
- Applying statistical methods to test data
- Running site quality audits against the contract
- Managing non-conformances to closure
- Verifying laboratory calibration and competence
- Updating quality systems to ISO 9001:2026
- Using digital records for inspection and handover
Strong construction quality control systems help organisations:
- Reduce rework, delay and cost overrun
- Hold contractors to the specification
- Defend decisions in claims and audits
- Lower whole-life maintenance costs
- Improve the safety and durability of assets
- Show financiers that supervision is effective
- Build a reliable record for future maintenance
- Strengthen trust between owner, engineer and contractor
For ministries, road and water agencies, PIUs and contractors, construction quality control is therefore part of value for money, not only an engineering concern.
Who Should Attend This Construction Quality Control Training?
This programme is designed for:
- Construction and site engineers
- Resident engineers and supervision consultants
- Quality assurance and quality control managers
- Site inspectors and clerks of works
- Materials and laboratory engineers
- Project managers and construction managers
- Construction supervisors and foremen
- Structural and civil engineers
- Welding inspectors and steel fabrication supervisors
- Facility and maintenance engineers
- Safety managers with site inspection duties
- Engineers in PIUs of donor-funded projects
- Technical staff of public works, road and water agencies
- Contract and claims managers
- Auditors reviewing infrastructure works
Participants from owners, consultants and contractors benefit from learning together, because quality problems usually arise at the interfaces between them.
Tick what your team needs to be able to do.
Construction Quality Control Training Objectives
Upon successful completion of this Construction Quality Control Training, participants will be able to:
- Explain the principles of quality management, assurance and control in construction
- Relate project quality plans to the requirements of ISO 9001:2026
- Prepare an inspection and test plan with clear hold and witness points
- Control concrete quality from the ready-mix plant to on-site casting
- Plan and evaluate cube, cylinder, core and non-destructive tests
- Inspect reinforcement and specify protection against corrosion
- Review welding procedures and recognise common weld defects
- Use statistics, control charts and Pareto analysis to assess quality data
- Audit site quality and apply corrective and preventive actions
- Assess laboratory competence, calibration and traceability
- Plan quality control for equipment, tank and foundation installation
- Prepare quality records that support handover and maintenance
Each objective is linked to a workshop, so participants leave with tools they have already tested.
Programme Contents and Structure
- Total quality management in construction: concepts and vocabulary
- Quality management, assurance and control: who does what
- ISO 9001:2026: what changed and what it means for contractors and owners
- Quality roles of owner, engineer, contractor and laboratory
- Project quality plans and method statements
- Inspection and test plans: hold, witness and review points
- Quality control performers and inspector competence
- Variability of concrete and its constituent materials
- Cement types and aggregate quality checks
- Mix design review and trial mixes
- Controlling ready-mix plant production and delivery
- Pre-concreting preparation and checklists
- Formwork inspection and workability tests
- Placing, compaction and curing on site
- Cube and cylinder tests: sampling, curing and reporting
- Core, rebound, pull-out, load and ultrasonic tests compared
- Choosing the right test for the question being asked
- Statistics and evaluation of quality control data
- Characteristic strength, standard deviation and acceptance criteria
- Control charts and trend detection
- The Pareto chart for prioritising defects
- Steel reinforcing: grades, bending, splicing and fixing
- Steel bar replacement and applied loads for steel structures
- Steel bar corrosion: causes and mechanisms
- Corrosion phenomena and protection systems
- Quality control against corrosion: cover, coatings and inhibitors
- Welding steel structures and welding consumables
- Welding procedure and welder qualification under codes such as AWS D1.1:2025
- Quality control procedures on site: daily routines
- Auditing construction site quality
- Non-conformance reports and corrective action tracking
- Quality control for equipment preservation and installation
- Tank and foundation construction checks
- Machine installation tolerances and records
- Quality records, as-built data and handover files
Full day-by-day contents
The five days move from systems and planning to materials, testing, steel and finally the site audit and field visit.
- Day 1: quality systems, roles and inspection planning
- Day 2: concrete materials, production and placement
- Day 3: testing, statistics and acceptance
- Day 4: steel, corrosion and welding quality
- Day 5: site audits, installation and field visit
Full day-by-day contents
First Day | Quality Systems, Roles and Inspection Planning
- Total quality management in construction: concepts and vocabulary
- Quality management, assurance and control: who does what
- ISO 9001:2026: what changed and what it means for contractors and owners
- Quality roles of owner, engineer, contractor and laboratory
- Project quality plans and method statements
- Inspection and test plans: hold, witness and review points
- Quality control performers and inspector competence
- Lessons from ADB-financed road projects on design and supervision quality
- Recommendations and limitations of construction quality control
Workshop: Building an Inspection and Test Plan
Teams receive a short specification for a reinforced concrete culvert and draft an inspection and test plan covering materials, formwork, reinforcement, concreting and backfill. They assign hold and witness points, responsibilities and records, then compare plans with another team and agree a final version against a checklist.
Second Day | Concrete Materials, Production and Placement
- Variability of concrete and its constituent materials
- Cement types and aggregate quality checks
- Mix design review and trial mixes
- Controlling ready-mix plant production and delivery
- Pre-concreting preparation and checklists
- Formwork inspection and workability tests
- Placing, compaction and curing on site
- Hot and cold weather concreting precautions
- Japanese practice in concrete inspection and acceptance values
Workshop: Pre-Pour Inspection Walk-Through
Using photographs and delivery tickets from a typical slab pour, participants carry out a pre-pour inspection, identify non-compliances in formwork, cover, cleanliness and mix documentation, and decide whether to release the pour. Each decision is justified against the specification and recorded in a pre-concreting checklist.
Third Day | Testing, Statistics and Acceptance
- Cube and cylinder tests: sampling, curing and reporting
- Core, rebound, pull-out, load and ultrasonic tests compared
- Choosing the right test for the question being asked
- Statistics and evaluation of quality control data
- Characteristic strength, standard deviation and acceptance criteria
- Control charts and trend detection
- The Pareto chart for prioritising defects
- Assessing construction quality grade
- Laboratory competence, calibration and traceability
Case Study: When Test Results Disagree
Participants analyse a data set of cube results and later core results from a structure where strength is disputed. Drawing on the reliability problems reported for road materials laboratories in Mozambique, they test the data statistically, check calibration and sampling records and recommend whether to accept, investigate further or reject the element.
Fourth Day | Steel, Corrosion and Welding Quality
- Steel reinforcing: grades, bending, splicing and fixing
- Steel bar replacement and applied loads for steel structures
- Steel bar corrosion: causes and mechanisms
- Corrosion phenomena and protection systems
- Quality control against corrosion: cover, coatings and inhibitors
- Welding steel structures and welding consumables
- Welding procedure and welder qualification under codes such as AWS D1.1:2025
- Precautions and defects in the welding process
- Visual and non-destructive inspection of welds
Workshop: Weld and Corrosion Defect Clinic
Teams examine a set of weld and corrosion defect images and inspection reports. They classify each defect, identify the likely cause, decide on acceptance or repair and write the corrective action and the preventive measure needed to avoid repetition on the rest of the structure.
Fifth Day | Site Audits, Installation and Field Visit
- Quality control procedures on site: daily routines
- Auditing construction site quality
- Non-conformance reports and corrective action tracking
- Quality control for equipment preservation and installation
- Tank and foundation construction checks
- Machine installation tolerances and records
- Quality records, as-built data and handover files
- Digital inspection under Japan’s i-Construction 2.0 approach
- Field visit: observing quality control in practice
Capstone Exercise: Site Quality Audit and Improvement Plan
Following the field visit, teams carry out a structured quality audit of a case project using the tools from the week: the inspection and test plan, test data, weld and corrosion findings and non-conformance logs. They present an audit report with prioritised findings and a 90-day improvement plan for their own organisation.
Construction Quality Control Training Methodology
The programme is practical and built around the documents participants use on site: specifications, test reports, checklists and audit forms.
The programme combines:
- Short expert presentations
- Worked examples with real test data
- Inspection checklists applied to site photographs
- Statistical exercises using spreadsheets
- Defect identification clinics
- Case studies from financed infrastructure projects
- Group drafting of inspection and test plans
- Role play between engineer and contractor
- Peer review of team outputs
- A field visit to observe site practice
- Daily recap and reflection
- An action plan for each participant
Participants are encouraged to bring an anonymised specification, test report or audit finding from their own work, so that exercises address their real problems.
- Inputs
- Activities
- Outputs
- Outcomes
- Impact
Technical Visits and Site Programme
The final day includes a field visit so that participants can see quality control applied in practice. Depending on availability, visits may cover a construction site, a ready-mix concrete plant, a materials testing laboratory or a steel fabrication facility in or near Tokyo. Visits are confirmed with host organisations closer to the programme dates.
Participants receive an observation guide before the visit, focusing on inspection routines, test sampling, record-keeping and site organisation. The observations feed directly into the capstone audit exercise in the afternoon.
Expected Outcomes
Upon completion of this Construction Quality Control Training, participants will be able to:
- Lead the preparation of inspection and test plans
- Make defensible decisions to release or stop a pour
- Interpret concrete test results statistically
- Choose suitable non-destructive tests
- Specify and check corrosion protection
- Review welding procedures and weld inspection reports
- Audit site quality and close non-conformances
- Assess the reliability of laboratory results
- Plan the move to ISO 9001:2026 for their quality system
These outcomes support fewer defects, clearer accountability and better records for maintenance.
£3,820 per participant · invoice and bank transfer · groups of 5 or more receive a discount
Five or more from one organisation: ask for the group rate on the invoice request.
Ten or more: an in-house version for your institution may cost less per person. Ask for an in-house quote.
Registration closes in 28 days (6 Dec 2026)
Institutional Application of Construction Quality Control Training
This programme supports organisations in strengthening:
- Quality management systems and manuals
- Supervision consultant terms of reference
- Inspection and test plan templates
- Concrete and steel acceptance procedures
- Laboratory oversight and calibration checks
- Non-conformance and corrective action systems
- Quality audit programmes
- Contractor performance evaluation
- Defects liability period management
- Handover and as-built documentation
- Digital quality records
- Quality training for site inspectors
Participants return with practical tools to improve:
- Inspection and test plans
- Pre-concreting checklists
- Concrete test evaluation sheets
- Weld inspection checklists
- Corrosion protection checks
- Non-conformance logs
- Site audit forms
- Quality improvement action plans
Organisations can review their current position with the free Project Health Check and identify staff skills gaps with the Training Needs Assessment.
Regional Relevance & Application
Asia
ADB lessons from road sector projects describe substandard works, weak cost estimates and design corrections linked to low-cost consultancy. Japan, through JICA, supports bridge management capacity in Central Asia, including a technical cooperation project with Tajikistan’s Ministry of Transport that combined classroom and field inspection training.
Africa
Research on road materials laboratories in Mozambique found unreliable results and little oversight of site laboratories, while JICA’s bridge maintenance project with Zambia’s Road Development Agency trained engineers in inspection and repair. Testing reliability and supervision are central concerns for agencies across the continent.
Middle East
Large building and transport programmes in the region rely on international contractors and consultants, so clear inspection and test plans and consistent acceptance criteria are essential to manage multiple supply chains.
Pacific
Small island states depend on imported materials and limited laboratory capacity, which makes sampling, transport of samples and independent testing an important part of quality control.
Europe
Contractors and owners in Europe are planning their transition to ISO 9001:2026, which affects quality manuals, internal audits and supplier requirements for construction projects.
Across regions, the shared lesson is that quality must be planned, tested and recorded, not assumed.
Source: MLIT, FY2026 construction investment outlook (nominal, forecast)
1. When did ISO publish ISO 9001:2026?
ISO announced the launch of ISO 9001:2026 on 16 September 2026 (ISO news release).
2. What is the main target of Japan's i-Construction 2.0 strategy?
MLIT announced in April 2024 that i-Construction 2.0 aims to save at least 30% of site labour by FY2040, about 1.5 times productivity.
3. How often must road bridges in Japan receive a close visual inspection?
Since 2014, a ministerial ordinance requires road administrators to inspect bridges and tunnels closely once every five years (MLIT Roads in Japan).
Host Country Profile – Japan
Tokyo is a well-connected training venue with excellent public transport and a deep pool of engineering expertise. It gives participants direct exposure to a construction culture known for precision, cleanliness of sites and disciplined record-keeping.
Japan is a benchmark for construction quality and asset management. MLIT’s FY2026 outlook projects about 81.5 trillion yen of construction investment. The i-Construction 2.0 strategy, announced in April 2024, aims to cut site labour needs by at least 30 per cent by FY2040 through automation of construction, data exchange and construction management. JSCE’s Standard Specifications for Concrete Structures link inspection and quality control during construction to later maintenance, and the five-yearly bridge inspection regime shows how quality data supports long-term asset care.
Japan has reciprocal visa exemption arrangements with 74 countries and regions, most allowing stays of up to 90 days; other participants need a short-term visa from a Japanese embassy or consulate. Risalat provides invitation letters and visa advice, and participants should apply early to allow for processing times.
Construction Quality Control Training Deliverables
Every participant receives practical support before, during and after the programme.
Before the Programme
- Participant Pre-Assessment
- Construction Quality Readiness Assessment
- Construction Quality Control Resource Pack
- Preparatory Reading Materials
- Complimentary Visa Support & Advisory
During the Programme
- Airport Pickup & Welcome Assistance
- Accommodation with Breakfast
- Welcome Networking Dinner
- Risalat Training Kit (Bag, Bottle, Mug, T-Shirt, Cap, Passport Cover, Pens, Notebook, Magnet & Keychain)
- Comprehensive Construction Quality Control Training Manual
- Inspection and Test Plan Template
- Pre-Concreting Checklist
- Concrete Test Evaluation Spreadsheet
- Weld Inspection Checklist
- Non-Conformance Report and Log Template
- Site Quality Audit Form
- Practical Workshops & Simulations
- Group Discussions & Peer Learning
- Daily Lunch and Refreshments
- Full Access to Training Venue Facilities
- Mini Pad / Tablet with Digital Learning Materials
- Field Visit (where applicable)
- Entertaining City Tour
After the Programme
- Certificate of Completion
- Risalat Programme Participation Recognition Award
- Post-Training Reference Materials
- ISO 9001:2026 Transition Checklist
- 90-Day Quality Improvement Plan Template
- Post-Training Support & Follow-Up Guidance
- Programme Report
Ministries, agencies, PIUs and contractors can request a tailored in-house version built around their own specifications and projects through our request a proposal form.
Common Challenges in Construction Quality Control, And How This Training Helps
How can we stop poor concrete reaching the structure?
Most problems start at the plant or before the pour. Day 2 covers ready-mix control, delivery checks and pre-concreting inspections, and the walk-through workshop practises the decision to release or stop a pour.
How can we deal with test results that do not agree?
Day 3 explains sampling, curing and the strengths and limits of each test, then uses statistics to judge whether a result reflects the concrete or the testing. The case study practises a structured response.
How can we trust results from site laboratories?
Calibration, traceability and operator competence are reviewed on Day 3, with a checklist participants can use to audit contractor and consultant laboratories.
How can we prevent corrosion problems that appear years later?
Day 4 links cover, concrete quality and protection systems to durability, and shows what inspectors should check before concealment.
How can we improve weld quality on steel structures?
Day 4 covers welding procedure and welder qualification, common defects and inspection methods, with a defect clinic to practise acceptance decisions.
How can we make contractors close non-conformances?
Days 1 and 5 set out inspection plans, non-conformance reporting and audit follow-up, so that each finding has an owner, a deadline and evidence of closure.
How can we prepare for ISO 9001:2026?
Day 1 summarises the changes in the 2026 edition and the expected transition, and participants leave with a checklist to update their quality system.
Frequently Asked Questions
Does the programme cover ISO 9001:2026?
Yes. ISO published ISO 9001:2026 in September 2026, and Day 1 explains the main changes and how construction organisations can plan their transition.
Is there a field visit?
Yes. The final day includes a field visit to observe quality control in practice. The visit type and host are confirmed with host organisations closer to the dates.
Who should attend?
Site and resident engineers, QA/QC managers, inspectors, laboratory staff, project managers and PIU engineers from owners, consultants and contractors.
Do I need advanced statistics?
No. Day 3 introduces the statistics needed to evaluate test data, using worked spreadsheet examples.
Can the programme be delivered in-house?
Yes. Institutions can request a tailored version built around their own specifications, test data and projects.
Training courses in TokyoConstruction & Engineering training courses
Why Tokyo for this programme
Tokyo offers examples of disaster risk management, quality management and infrastructure.
The Construction Quality Control Training in Tokyo programme in January 2027 brings together officials and professionals from across the Asia region and beyond. Sessions combine short inputs, case studies and group work on participants' own files, and the city's institutions can be added as a study visit on request.
Getting there: Haneda (HND) and Narita (NRT).
Check whether you need a visa with the free Visa Checker, and ask for an invitation letter once you are registered.
The same topic in other cities
Other programmes in Tokyo
More training courses in Japan · All programmes in Asia · Full training calendar



