Capability and practice
The team may need applied learning or coaching: practical work on its own files, so people can apply the rules and methods with confidence.
在任意页面按/键即可搜索 · 按Esc键关闭
首页 › 免费工具 › 环境和社会合规跟踪表(ESF与IFC绩效标准)
适用于必须遵守世界银行环境和社会框架、IFC绩效标准或类似贷款方标准(ADB、AfDB、EBRD、赤道原则)的在建或运营项目。将每项要求标记为“已就绪”“部分就绪”“缺失”或“不适用”,添加备注,即可获得合规得分、未完成事项清单、面向承包商和项目实施单位的文件索取备忘录,以及供下次检查团或贷款方审查使用的管理层回复模板。
Finish to see how you compare with other professionals, then challenge a colleague to beat your score.
需要经过核验的结果?申请由Risalat开展独立评估。
内容与本工具所衡量领域相匹配的近期培训项目。您的结果将显示哪些项目最适合您的薄弱环节。
准备度评估检查的是机构是否已做好按照这些标准开展工作的准备。本跟踪表则逐项检查在建或运营中项目的合规情况。
大多数事项适用,因为这些标准涵盖相同的主题。请在备注中使用您的融资方文件名称(例如用ESAP代替ESCP)。
可以。注册免费账户后,您可以邀请各现场团队就其现场作答,并在同一仪表板上比较结果。
信息来源核查时间:2026年11月。我们每月核查一次官方来源。
本工具仅供指导使用,并非正式评估、审计或法律意见。您的合同、融资方政策和国家法律始终优先适用。适用于您项目的要求以您的ESCP、ESAP、ESMP及融资方的指示为准。
We use essential cookies to run this website securely. With your permission we also use cookies to remember your choices and to measure our advertising. To understand how the site is used we count visits with Google Analytics: in the EU, the UK and Switzerland only after you accept, elsewhere unless you reject it. You can change your choice at any time from “Cookie settings” at the bottom of every page. Privacy and cookie policy
Most likely fit
Also worth a look
Less indicated by this result
Bid document issued
Bids opened
Evaluation and award decision
Contract signed
Bid validity
Bid document issued late in {n} package(s): preparing specifications, estimates and documents is a skill the team can build.
Bid document issued late in {n} package(s): check internal clearance and prior review timing as well.
Bid opening moved in {n} package(s): check how addenda, clarifications and deadline extensions are approved.
Evaluation and award decision late in {n} package(s): check committee appointment, report approval and no-objection steps.
Evaluation and award decision late in {n} package(s): evaluation reports may need practice with real cases.
Contract signature late in {n} package(s): check signature approvals, securities and other dependencies.
Long gaps between stages in {n} package(s): look for steps that wait on another unit.
{x} late in {n} packages: a recurring pattern often points to a practice gap.
Evaluation outlasted the bid validity in {n} package(s): confirm extensions and their effect on bids before any award.
More than half of the bid validity used in {n} package(s): plan extensions before the deadline.
Bid preparation period below the minimum in {n} package(s): an independent check before award is advisable.
Signature soon after the award decision in {n} package(s): confirm the standstill period was respected.
{x}: {n}%
Matched from the type of tool, as this result has no scores by area.
Nothing in this result points here.
No clear gap in this result. If problems persist, a short conversation helps locate them.
Overall result: {n}%
Lowest areas: {x}
{n} package(s) analysed, {x} behind plan
{x}: late in {n} package(s)
Bid validity and rule flags: {n}
Score: {x}
Result: {x}
Please complete the highlighted fields.
Connection problem. Please try again.
Sending…
A work email helps us confirm your institution and reply faster. A personal address is accepted.
See your result ↓
Back to questions ↑
A late stage or a low score shows where time or quality is being lost. It does not, on its own, show why. The cards below suggest which kind of support is most likely to fit, so a first conversation starts in the right place.
The team may need applied learning or coaching: practical work on its own files, so people can apply the rules and methods with confidence.
The institution may need to review its steps, approvals and dependencies: who signs, in what order, how long each step takes and what waits on what.
Dates, deadlines or validity periods are under pressure. A verified independent assessment is advisable before acting, so decisions rest on confirmed facts.
Screening aid, not a verified assessment. The matching uses your answers and a few fixed rules. Our specialists confirm the cause with you before recommending anything.
A confirmation is on its way to your inbox.
The Risalat Brief: one short report a week on a real delivery problem in procurement, safeguards, M&E or public finance, its causes and what works. No adverts; unsubscribe any time.
订阅即表示您同意接收我们的简报。隐私政策