关键信息
- 日期
- 2027年4月19–23日(5天)
- 地点
- Dubai, United Arab Emirates
- 每位学员费用
- £3,850(英镑)
- 付款
- 通过发票和银行转账付款
- 报名截止
- 20 Mar 2027
- 证书
- 结业证书
- 内训选项
- 按您的日期,为您的团队专场举办
本页内容14个部分
培训项目概述
Marine transport hubs require robust civil engineering frameworks to accommodate modern container vessels and regional cargo demands. This 5-day professional course in Dubai provides engineering professionals and public sector managers with technical knowledge in coastal infrastructure design, capital dredging execution, and breakwater construction. Participants examine geotechnical foundations, hydrodynamic modelling parameters, and structural typologies suitable for high-capacity maritime terminals, using real-world operational examples from major regional deep-water facilities.
Navigating international civil engineering contracts demands strict compliance with recognised standards, including FIDIC Conditions of Contract for Construction (Red Book) and the British Standard BS 6349 for maritime works. Attendees analyse the practical mechanics of capital dredging works, reclamation methodologies, sediment plume management, and rubble-mound or caisson breakwater engineering. The curriculum emphasises contractor supervision, structural health monitoring, bathymetric survey analysis, and quality verification during offshore and nearshore construction phases.
Designed for teams tasked with delivering large-scale marine civil works, this programme bridges design theory and site supervision. Participants review methods for assessing contractor equipment capacity, evaluating hydrographic data, enforcing environmental mitigation plans, and managing contractual variations. Through rigorous technical reviews, attendees develop the competence needed to supervise marine civil contracts, safeguard asset longevity, and maintain alignment with multilateral development bank standards throughout the infrastructure project lifecycle.
Maritime nations are scaling up national port capacity to handle deeper-draft container vessels and enhance regional logistics connectivity. Significant public and multilateral capital is committed to complex maritime civil works, including projects comparable to the Bay Terminal Marine Infrastructure Development Project. These investments require project implementation units and port authorities to manage technically demanding capital dredging, land reclamation, and breakwater packages under strict environmental and contractual performance requirements.
Delivered by Risalat Consultants International in Dubai, United Arab Emirates, it combines expert-led sessions, real cases and group work, so that participants can apply what they learn in their own institution.
The Programme Strengthens Institutional Capability
- Analysis of tides, wave regimes, storm surges, and current dynamics for port siting
- Geotechnical site investigations in marine environments: boreholes, CPT, and geophysical surveys
- Application of BS 6349 (Maritime Works) and PIANC design principles for terminal layouts
- Numerical modelling review: hydrodynamic, spectral wave, and coastal morphological models
- Metocean data verification and structural design risk identification for nearshore structures
- Technical appraisal of dredging plant: CSD, TSHD, backhoe dredgers, and split hopper barges
- Geotechnical classification of marine sediments and dredgeability assessment methodologies
- Hydraulic fill placement techniques, ground improvement, and containment bund construction
- 气候与环境风险评估
- 适应与减缓规划
- 能源、水和土地领域的行业战略
- 面向气候与环境目标的项目设计
It is designed for port authority civil and marine engineers, maritime infrastructure project directors, project Implementation Unit (PIU) technical specialists and others who want practical, current skills in climate, environment and natural resources.
The Growing Importance of Port Marine Infrastructure, Dredging and Breakwater Construction in Dubai
- Analysis of tides, wave regimes, storm surges, and current dynamics for port siting
- Geotechnical site investigations in marine environments: boreholes, CPT, and geophysical surveys
- Application of BS 6349 (Maritime Works) and PIANC design principles for terminal layouts
- Numerical modelling review: hydrodynamic, spectral wave, and coastal morphological models
- Metocean data verification and structural design risk identification for nearshore structures
- Technical appraisal of dredging plant: CSD, TSHD, backhoe dredgers, and split hopper barges
- Geotechnical classification of marine sediments and dredgeability assessment methodologies
- Hydraulic fill placement techniques, ground improvement, and containment bund construction
- Dredge production calculations, fuel consumption metrics, and cycle time optimisation
- Bathymetric survey methodologies: multi-beam echo sounders (MBES) and volume computation standards
- Comparative assessment of breakwater typologies: rubble-mound, caisson, and composite structures
- Armour layer stability formulas: Hudson and Van der Meer empirical design equations
- Concrete armour units (Accropode, Core-loc, Xbloc): placement rules and packing density controls
- Geotextile filters, underlayers, and core material specifications for deep-water breakwaters
- Caisson fabrication, slipforming, towing, sinking, and ballasting quality control steps
- World Bank Environmental and Social Framework (ESF) applied to marine and coastal works
- Managing water quality: total suspended solids (TSS), turbidity monitoring, and silt curtains
- Dredged material management: beneficent reuse, offshore disposal protocols, and London Convention rules
- Underwater noise and vibration management plan implementation for marine pile driving
- Continuous environmental baseline monitoring, sensor deployment, and reporting mechanisms
- The Engineer role under FIDIC Red Book contracts for maritime civil engineering packages
- Contractual management of unforeseen ground conditions, weather downtime, and variation orders
- Drafting supervisory oversight plans (SOP) for off-site fabrication and on-site marine works
- Non-destructive testing (NDT), concrete durability checks, and cathodic protection verification
- Developing quality assurance inspection and test plans (ITP) for deep-water port projects
气候变化、环境压力和资源管理如今正影响着国家计划、预算和投资决策。出资方越来越期望项目从一开始就纳入气候与环境因素。
能够针对气候风险进行规划、妥善管理自然资源并编制合理提案的机构,更有能力保护公共服务,并获取这一领域的可用资金。
各机构日益需要具备以下能力的专业人员:
- 评估其服务和资产面临的气候与环境风险
- 设计符合气候与环境目标的项目
- 编制出资方能够批准的提案
- 可信地衡量和报告成果
- 与社区及跨部门合作伙伴协同工作
健全的气候、环境与自然资源体系有助于机构:
- 保护服务和基础设施免受气候风险影响
- 获取气候与环境资金
- 履行国家及国际承诺
- 可持续地利用自然资源
This Port Marine Infrastructure, Dredging and Breakwater Construction in Dubai programme brings these elements together in a practical format, so that participants understand not only what good practice looks like but also how to introduce it in their own setting, with the people and resources they have.
Who Should Attend This Port Marine Infrastructure, Dredging and Breakwater Construction in Dubai Training?
本培训项目适合:
- Port authority civil and marine engineers
- Maritime infrastructure project directors
- Project Implementation Unit (PIU) technical specialists
- Coastal and geotechnical design engineers
- Consulting engineers supervising marine civil contracts
- Procurement and contract managers for maritime works
- Environmental compliance officers overseeing dredging operations
- Hydrographic survey coordinators and quality assurance leads
- Government transport ministry technical advisors
- 气候变化与环境官员
- 能源、水和农业部门工作人员
- 规划与政策官员
本培训项目既适合经验丰富的专业人员,也适合刚承担新职责的人员。我们鼓励来自不同机构和国家的学员组成混合小组,因为学员能从彼此的经验中获益良多。
勾选您的团队需要具备的能力。
Port Marine Infrastructure, Dredging and Breakwater Construction in Dubai Training Objectives
Upon successful completion of this Port Marine Infrastructure, Dredging and Breakwater Construction in Dubai Training, participants will be able to:
- Evaluate structural designs for breakwaters, revetments, and quay walls in accordance with BS 6349 and PIANC guidelines
- Manage capital dredging and land reclamation operations using appropriate plant selection and productivity calculation methods
- Formulate supervisory oversight plans and quality assurance protocols for complex deep-water port civil works contracts
- Assess geotechnical data, hydrodynamic assessments, and metocean parameters to verify contractor construction designs
- Implement marine environmental management controls to mitigate turbidity, sediment plumes, and coastal habitat disruption
- Apply FIDIC contractual provisions to handle marine site conditions, measurement variations, and progress claims
- Review bathymetric surveys and non-destructive testing results to verify compliance with dredging and structural tolerances
- 阐述本行业面临的主要气候与环境挑战
- 评估服务和资产面临的气候与环境风险
- 规划适应与减缓措施
每项目标都会在培训期间通过练习、案例或小组作业加以实践,使学员结业时不仅能够描述,更能够实际运用。
培训项目内容与结构
本培训项目为期5天。每天均包含专家讲授、实践练习,并以研讨会或案例研究收尾:
- First Day: Coastal Engineering Fundamentals, Metocean Data, and Site Characterisation
- Second Day: Capital Dredging, Reclamation, and Dredging Plant Selection
- Third Day: Breakwater Design, Armouring Systems, and Marine Structural Works
- Fourth Day: Marine Environmental Controls, Monitoring, and Compliance Frameworks
- Fifth Day: Site Supervision, FIDIC Contracts, and Quality Assurance Protocols
完整的每日课程内容
First Day | Coastal Engineering Fundamentals, Metocean Data, and Site Characterisation
- Analysis of tides, wave regimes, storm surges, and current dynamics for port siting
- Geotechnical site investigations in marine environments: boreholes, CPT, and geophysical surveys
- Application of BS 6349 (Maritime Works) and PIANC design principles for terminal layouts
- Numerical modelling review: hydrodynamic, spectral wave, and coastal morphological models
- Metocean data verification and structural design risk identification for nearshore structures
Workshop: Coastal Engineering Fundamentals, Metocean Data, and Site Characterisation: Applying It to Your Institution
学员分成小组,将当天所学方法应用于本机构的实例,并商定切实可行的后续步骤。
Second Day | Capital Dredging, Reclamation, and Dredging Plant Selection
- Technical appraisal of dredging plant: CSD, TSHD, backhoe dredgers, and split hopper barges
- Geotechnical classification of marine sediments and dredgeability assessment methodologies
- Hydraulic fill placement techniques, ground improvement, and containment bund construction
- Dredge production calculations, fuel consumption metrics, and cycle time optimisation
- Bathymetric survey methodologies: multi-beam echo sounders (MBES) and volume computation standards
Workshop: Capital Dredging, Reclamation, and Dredging Plant Selection: Applying It to Your Institution
学员分成小组,将当天所学方法应用于本机构的实例,并商定切实可行的后续步骤。
Third Day | Breakwater Design, Armouring Systems, and Marine Structural Works
- Comparative assessment of breakwater typologies: rubble-mound, caisson, and composite structures
- Armour layer stability formulas: Hudson and Van der Meer empirical design equations
- Concrete armour units (Accropode, Core-loc, Xbloc): placement rules and packing density controls
- Geotextile filters, underlayers, and core material specifications for deep-water breakwaters
- Caisson fabrication, slipforming, towing, sinking, and ballasting quality control steps
Case Study: Breakwater Design, Armouring Systems, and Marine Structural Works in Practice
学员分析真实案例,将案例中的决策与良好实践进行比较,并总结出可在自身环境中运用的经验。
Fourth Day | Marine Environmental Controls, Monitoring, and Compliance Frameworks
- World Bank Environmental and Social Framework (ESF) applied to marine and coastal works
- Managing water quality: total suspended solids (TSS), turbidity monitoring, and silt curtains
- Dredged material management: beneficent reuse, offshore disposal protocols, and London Convention rules
- Underwater noise and vibration management plan implementation for marine pile driving
- Continuous environmental baseline monitoring, sensor deployment, and reporting mechanisms
Workshop: Marine Environmental Controls, Monitoring, and Compliance Frameworks: Applying It to Your Institution
学员分成小组,将当天所学方法应用于本机构的实例,并商定切实可行的后续步骤。
Fifth Day | Site Supervision, FIDIC Contracts, and Quality Assurance Protocols
- The Engineer role under FIDIC Red Book contracts for maritime civil engineering packages
- Contractual management of unforeseen ground conditions, weather downtime, and variation orders
- Drafting supervisory oversight plans (SOP) for off-site fabrication and on-site marine works
- Non-destructive testing (NDT), concrete durability checks, and cathodic protection verification
- Developing quality assurance inspection and test plans (ITP) for deep-water port projects
Capstone Exercise: Port Marine Infrastructure, Dredging and Breakwater Construction in Dubai Action Plan for Your Institution
学员将一周所学整合为本机构的行动计划,明确优先事项、负责人和初步行动,并进行展示,听取同伴和讲师的反馈。
Port Marine Infrastructure, Dredging and Breakwater Construction in Dubai Training Methodology
The training employs a practical, engineering-led instructional methodology combining technical presentations, contract case reviews, and computational exercises. Participants work with real project data sets, including hydrographic charts, geotechnical borehole logs, and bathymetric surveys. Group tasks require attendees to critically examine technical specifications, evaluate contractor submittals, and develop project-grade supervision plans aligned with international port standards.
本培训项目融合了:
- 专家主讲当前实践
- 区域及国际案例研究
- 小组作业与实践练习
- 视情况安排模拟演练与角色扮演
- 探讨学员自身面临的挑战
- 跨机构、跨国家的同伴学习
- 可带回工作岗位的实用工具与模板
- 每日反思与行动规划
培训开始前,简短的课前评估可帮助讲师了解每位学员的岗位职责和重点关注事项,以便根据学员群体调整案例和练习。每天结束时安排简短的反思环节,学员记录下将在工作中应用的内容。
预期成果
Upon completion of this Port Marine Infrastructure, Dredging and Breakwater Construction in Dubai Training, participants will be able to:
- Proficiency in validating marine site investigation reports and metocean data for port engineering
- Capability to select, size, and monitor capital dredging and land reclamation operations
- Practical skill in auditing breakwater designs and inspecting armour unit placement on site
- Operational competency in deploying turbidity management systems and environmental controls
- Formulation of robust inspection and test plans (ITP) for marine structural assets
- Confidence in administering FIDIC contract clauses relating to unforeseen marine conditions and variations
- 评估气候与环境风险
- 规划适应与减缓措施
学员结业时将获得个人行动计划和实用工具,回到工作岗位的第一周即可在机构中应用。派出多名学员的机构可借助本培训项目,在各团队之间统一方法和模板,使改进成果更易持续。
每位学员£3,850 · 发票与银行转账 · 5人及以上团体可享折扣
同一机构五人及以上:请在申请发票时索取团体价。
10人或以上:为贵机构举办内训的人均费用可能更低。索取内训报价。
Registration closes in 128 days (20 Mar 2027)
Institutional Application of Port Marine Infrastructure, Dredging and Breakwater Construction in Dubai Training
本培训项目帮助机构加强:
- 气候与环境规划
- 项目设计
- 获取资金
- 成果衡量
- 利益相关方参与
学员将带着实用工具回到工作岗位,以提升:
- 风险评估
- 概念说明
- 成果框架
- 监测系统
- 伙伴关系安排
本培训项目的设计旨在让学习成果从课堂延伸至机构。学员尽可能围绕自身的流程和文件开展练习,并在结业时带走一份可供其主管审阅和支持的行动计划。
区域相关性与应用
欧洲
欧洲机构在详尽的监管框架和改革议程下开展气候、环境与自然资源工作。来自欧洲的学员可以将自身实践与其他地区的同行进行比较,并检验成熟方法在不同条件下的适用性。
非洲
在整个非洲,从事气候、环境与自然资源工作的政府部委、机构和项目团队,越来越多地与捐助方资助的项目协同运作,而这些项目要求有清晰的制度和证据。本培训项目帮助学员将良好实践与其所在机构及可用资源相结合。
中东
在中东,国家发展战略和多元化计划对气候、环境与自然资源管理提出了越来越高的要求。学员将探讨如何在公共机构和企业内部建立实现这些计划所需的能力。
亚洲
亚洲各国的机构在快速发展的同时,推进着雄心勃勃的现代化计划。来自亚洲的学员可以分享快速扩展系统的经验,并借鉴其他地区的做法。
太平洋地区
小岛屿国家和太平洋国家在规模、距离和能力方面面临特殊制约。本培训项目重点介绍适合小型机构、务实且适度的气候、环境与自然资源管理方法。
Holding the programme in Dubai, United Arab Emirates brings participants together away from their daily pressures, so they can compare how climate, environment and natural resources is handled in different settings. The same programme can also be delivered in-house for one institution, in its own country or online, with cases taken from its current work.
- 收集
- 清洗
- 存储
- 分析
- 决策
东道国概况:阿联酋
Risalat Consultants International在阿联酋迪拜举办的培训项目、研讨会、实地见习与培训课程
在本国以外学习,可让学员专心投入,以全新视角审视本机构,并有机会与其他国家的同行建立人脉网络。
Port Marine Infrastructure, Dredging and Breakwater Construction in Dubai Training Deliverables
学员在培训前、培训中及培训后均可获得支持,使准备、学习与跟进形成连贯完整的体验。
培训开始前
- 学员课前评估
- Port Marine Infrastructure, Dredging and Breakwater Construction in Dubai Readiness Assessment
- Port Marine Infrastructure, Dredging and Breakwater Construction in Dubai Resource Pack
- 课前阅读资料
- 免费签证支持与咨询
培训期间
- 机场接机与欢迎协助
- 住宿(含早餐)
- 欢迎交流晚宴
- Risalat培训礼包(背包、水瓶、马克杯、T恤、帽子、护照套、笔、笔记本、冰箱贴及钥匙扣)
- Comprehensive Port Marine Infrastructure, Dredging and Breakwater Construction in Dubai Training Manual
- 气候风险筛查检查清单
- 备选方案评估模板
- 概念说明模板
- 成果衡量模板
- 实践研讨与模拟演练
- 小组讨论与同伴学习
- 每日午餐与茶歇
- 全面使用培训场地设施
- 装有数字学习资料的迷你平板电脑
- 实地考察(如适用)
- 城市休闲观光
培训结束后
- 结业证书
- Risalat培训项目参与表彰奖
- 培训后参考资料
- 融资准备检查清单
- 监测与报告模板
- 培训后支持与跟进指导
- 培训项目报告
各机构也可申请本培训项目的定制内训版本,在其办公场所或在线举办。索取方案建议书。
Common Challenges in Port Marine Infrastructure, Dredging and Breakwater Construction in Dubai, And How This Training Helps
机构如何评估其服务和资产面临的气候与环境风险?
The programme addresses this directly on the first day (Coastal Engineering Fundamentals, Metocean Data, and Site Characterisation), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
机构如何设计符合气候与环境目标的项目?
The programme addresses this directly on the second day (Capital Dredging, Reclamation, and Dredging Plant Selection), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
机构如何编制出资方能够批准的提案?
The programme addresses this directly on the third day (Breakwater Design, Armouring Systems, and Marine Structural Works), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
机构如何可信地衡量和报告成果?
The programme addresses this directly on the fourth day (Marine Environmental Controls, Monitoring, and Compliance Frameworks), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
机构如何与社区及跨部门合作伙伴协同工作?
The programme addresses this directly on the fifth day (Site Supervision, FIDIC Contracts, and Quality Assurance Protocols), where participants practise the methods involved and adapt them to their own institution, then build it into their action plan.
常见问题
When and where does the Port Marine Infrastructure, Dredging and Breakwater Construction in Dubai programme take place?
It runs from 19 Apr 2027 to 23 Apr 2027, in Dubai, United Arab Emirates. The registration deadline is shown at the top of this page.
谁应参加?
The programme is designed for port authority civil and marine engineers, maritime infrastructure project directors, project Implementation Unit (PIU) technical specialists, coastal and geotechnical design engineers, and others who want practical skills in climate, environment and natural resources.
我能获得证书吗?
能。完成本培训项目的学员将获得Risalat Consultants International颁发的结业证书。
本培训项目能否仅为我们机构单独举办?
可以。我们可以在贵机构所在地、其他城市或在线提供量身定制的内训版本,并围绕贵机构自身的案例设计内容。请使用本页面的方案建议书申请表。
我是否需要具备气候、环境和自然资源方面的经验?
除具备相关岗位经验外,无需其他专业背景。简短的课前评估可帮助讲师根据学员群体调整课程。
Who Will Deliver This Programme
Each date is delivered by a team assigned from Risalat's expert network for this subject. For this programme we assign:
How we choose them: Experience in the region of the participants or comparable settings; Command of the financier rules that apply (World Bank, ADB, AfDB, EU, UN) where relevant; Delivery in English; other languages on request for in-house groups; No conflict of interest with participants' institutions.
Names and short CVs of the assigned experts are shared with registered participants and sponsoring organisations before the programme, on request. Are you an expert in this subject? Join our expert network.
Training courses in DubaiShips, Terminals, and Port Management training courses
为何选择在迪拜举办本培训项目
迪拜是通往非洲、亚洲和欧洲的一站直达枢纽,对许多国家的公民提供简便的签证政策,并拥有现代化的培训场地。
The Port Marine Infrastructure, Dredging and Breakwater Construction in Dubai programme in April 2027 brings together officials and professionals from across the Middle East region and beyond. Sessions combine short inputs, case studies and group work on participants' own files, and the city's institutions can be added as a study visit on request.
交通:迪拜国际机场(DXB)。
使用免费的签证查询工具确认您是否需要签证,完成报名后即可申请邀请函。
其他城市的同主题培训
迪拜的其他培训项目
- Records and Archives Management for Public Institutions in Dubai
- Small Island Landfill Rehabilitation and Leachate Containment in Dubai
- Maritime Navigation Safety, Aids to Navigation and Port Operations in Dubai
- Model Energy Supply Purchase Agreements and Renewable PPA Negotiation in Dubai
- Aviation Infrastructure Procurement and FIDIC Gold/Yellow Contracting in Dubai
- 《联合国气候变化框架公约》 UNFCCC
- 国际内部审计师协会(IIA) IIA
- 最高审计机关国际组织(INTOSAI) INTOSAI
For teams and institutions
Bring your team
Teams that learn together apply more at work. Tell us how many people and how you would like to take part: we reply with a group quote within two working days.
Other dates and cities for this subject: Infrastructure, Roads and Transport Projects training courses (161 upcoming dates).
阿拉伯联合酋长国更多培训课程 · 中东所有培训项目 · 完整培训日历
Plan this programme in a roadmap: why it matters, why to approve it, the dates to plan and the career it builds.